2012, 08-17 Permit: SW-12002000 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002000 08/17/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: KALIN EXCAVATION
Project Name: W PONDEROSA PH I Applicant: KALIN EXCAVATION
Permit Type: SEWER Address: 9229 E WOOLARD
COLBERT,WA 99005
Phone: (509)466-9166
Email:
SITE INFORMATION:
Site Address: 10520 E 43RD AVE Owner: STANLEY,T R&J
Parcel Number: 45324.1217 Address: 10520 E 43RD CRT
SPOKANE,WA 99206-9656
Subdivision: PONDRA PINES Phone:
ADDITION
Assessor's Description: PONDRA PINES ADD L17 B2 Email:
Inspection Area:
Water District:Spokane Fire District:Spokane Valley Fire
County Water District#3
Zoning: Land Area:43656.9 Square Feet
CONTRACTOR INFORMATION:
General Contractor
KALINE*0431 B
KALIN EXCAVATION
9229 E WOOLARD RD
COLBERT,WA 99005
509-954-9101
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES,INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed:08/17/2012 09:57:34 Printed by:IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002000 08/17/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION.INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:08/17/2012 09:57:34 Printed by:IIS APPPOOLWSP.NET v4.0