Loading...
2012, 12-04 Permit: SW-12002591 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002591 12/04/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: ACME EXCVT&SEWER BORING CO Project Name: W PONDEROSA Applicant: ACME EXCVT&SEWER BORING CO Permit Type: SEWER Address: 6808 S. LINKE RD. GREENACRES,WA 99016 Phone: (509)228-0691 Email: SITE INFORMATION: Site Address: 9815 E 44TH AVE Owner: SCHMAHL, M R&L Parcel Number: 45323.9069 Address: 9815 E 44TH AVE SPOKANE,WA 99206-9261 Subdivision: Phone: Assessor's Description: 32-25-44 E200FT OF N440FT OF S470FT OF Email: SE1/4 OF SW1/4 EXC THE S215FT OF THE W95FT OF E200FT THEREOF Inspection Area: Water District: Spokane Fire District: Spokane Valley Fire County Water District#3 Zoning: Land Area: 1.6 Acre(s) CONTRACTOR INFORMATION: General Contractor ACMEEES963LD ACME EXCVT&SEWER BORING CO 6808 S. LINKE RD. GREENACRES,WA 99016 (509)228-0691 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:12/04/2012 10:53:53 Printed by:IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002591 12/04/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 12/04/2012 10:53:53 Printed by:IIS APPPOOL\SmartGovProdApp