2010, 07-21 Permit App: 10002170 Storage Bldg Project Number: 10002170 Inv: 1 Application Date: 7/21/2010 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 30 X 40 STORAGE BLDG W 12 X 40 LEAN-TO Contact: TOWN&COUNTRY
Address: 5918 E TRENT AVE
C-S-Z: SPOKANE VALLEY,WA 99212
Setbacks:Front Left: Right: Rear: Phone: (509)535-9016
Group Name:
Site Information• Project Name:
Plat Key: 002086 Name: PONDEROSA ACRES 04TH ADD District: Sout
Parcel Number: 45324.0803 Block: Lot:
SiteAddress: 9905 E 44TH AVE Owner:Name: SCHOENWALD,BEN C
Address: 9905 E 44TH AVE
Location::CSV SPOKANE VALLEY,WA 99206
Zoning: R-1 SF Res Estate District
Water District: 101 SPO CO WATER DIST#3B Hold: L
Area: 1.08 Acres Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information: �- L
Review
Building Plan Review Released By:
Originally Released: 7/21/2010 By: tmelbourn
— l
Septic Sys Review Released By: I
Originally Released: 7/19/2010 By: LHALSEY
Landuse/Zoning/HE Conditions Released By:
This permit is granted based on the structure not being used for storage of on-street vehicles. Should the
use of the structure be used for that purpose,the driveway will need to be paved and approved by the City
of Spokane Valley.
Originally Released: 7/21/2010 By: tschmidt
Permits:
Operator: jmm Printed By: jmm Print Date: 7/21/2010
Project Number: 10002170 Inv: 1 Application Date: 7/21/2010 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: TOWN&COUNTRY BUILDERS Firm: TOWN&COUNTRY BUILDERS IN
Address: 5918 E TRENT AVE Phone: (509)535-9016
SPOKANE,WA 99212
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB PLAN 1,680 $31,920.00 1,680 $31,920.00
REVIEW
FEE
Totals: 1,680 $31,920.00 1,680 $31,920.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $461.95
ACCESSORY PLANS REVIEW 1 SELECT $115.49
WSBCC SURCHARGE 1 SELECT $4.50
Permit Total Fees: $581.94
This permit is granted based on the structure not being used for storage of on-street vehicles. Should
the use of the structure be used for that purpose,the driveway will need to be paved and approved by
the City of Spokane Valley.
Payment Summary' .ti . . . .
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $581.94 $581.94 $115.49 $466.45
$581.94 $581.94 $115.49 $466.45
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 7/21/2010
goof Permitgentr----- ---
Site :
e 1 17:1c-Ai Sprague, , _ _ t PERMIT NUMBER:
SföSpo e Valley,IFA 9906\, - PERMIT FEE:
4•00Ty (509)6 8-003Z•::-FAk:(509)688-047
„ -
www.st?olcanevallevAlrg 1 , ., 't
' 9 k 1 ,,.,
Community Development
Residential Construction ' F4.- New Onstruction Ti‹c‘cessory Bldg
.,
Permit Application Addition/Remodel Deck
--- Fl Other:
nAL„
si i b.ADDRESS: '7705LiiA
- I E 7 fur. SPikofig 11/141-cy 4,14 ?9260
I
ASSESSORS PARCEL NO: q-5-3 Alf 0 0803 LEGAL DESCRIPTION:
Building Owner: Contractor:
Name:Cifliiss SaioE,41wha Name:7614/A/ It CouAITIZr SuicD0g5 it/c.
Address: 79 cc -g go, „h„c. Addre-ss: SI/B E4sr rfew-4devta
City: 5/DfrAde /Nay State: WA zip:47472d cfty:40t1 #tAx vitafr State:WA, Zip:912/,•
Phone: o?
g 79 a 39, Fax Phone:609 53c- ?cv6 Fax:5-09 5-3 283c,
Contractor Lic No:7woje5zi234 Exp Date: 04,130//z_
•
Contact Person City Busin ess Lic.No: 6,0/ 051. 695-
Name: 64LE &tin/Err
Phone: CO? 535 ?0/6 err 2.11
Describe the scope of work in detail:- n Cost of Project; $
ComsTRide7 3o 'A 01 x 4 ZroP1-9C-161-0C- I/ail if /it XV iti',0*-4/ L i 0 s A/ro
Proposed Use: SToR A 6-i-
**************The following MUST be complete: (write Nalf not applicable)**********************
HEIGHT T9 PEAK DIMENSIONS:30X4'OX/6 #OF STORIES: TOTAL HABITABLE SPACE:
op*tide? /141/0)32 PVC _ Ai 441-
,i ' • LOOR TO SO. 2Nu FLOOR Q. FTG: UNFIN BASEMENT SQ. FIG: IMPERVIOUS SURFACE
• ” G: !ZOO 04144_, Ai 4,
,
AREA /14
1 tog° ith P14 `F " 4/7,411'
HED :..- — , NT (RAGE S .FTG: DECK/COV. Pirj0 SQ. FTG: 30% SLOPES ON
SQ. FIG: A/ ' o A,7M 4/ or PROPERTY: /1/0
#OF BEDBO•MS: CONSTRU TION TYPE: HEAT SOUI1EGE: SEWER OR SEPTIC?
WM- POET FIUME N/11 ar/r/C.
The permitee verifies,acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of S ane Valley Permit is not a permit or approvatfor any violation of federal,state or
local laws, codes or ordinances. Plans or a onal information may be required to be submitted, and subsequently approved before
this_application can be roce .
SIGNATURE: DATE: 7— /?-- /0
Method of Pay ent:
CI Cash 0 Check 0 Mastercard 0 VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 2/15/07
CI/SS Seo. 0444
il
9965 F 111' W
VAll 4,-)g-, 9 -M , vi+e- /
453.2'1
/1----- --- n---------I
PLANNING DEPT. APPROVED
1
1d�, BY: w-a
')r;
DATE: -?b4/1c)
, r A i
j zx4o
, 5, B,r it
I , Lam
38Xp
Y\
I •
iAr a \i-- sFred
1 [7
r1D'
r di
1 r
a11
.„1/4 ,
„q y--,
d,,,.....,
V I, . ,
8 L",.
;:-;.,_ ., ,. r c
05- c yy _ )
For City Use Only
PLUS Project NumV> vl 17 Li
'' � Project A Qpokane
Va
lleY® L/L1/4-
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is t
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
'j ➢ Submit complete,accurate plans and documents.
{ Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete,including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07