16-084.01 T LaRiviere: Appleway Shared Use Path Siok�ane ....*Walley. CHANGE ORDER NO: 1 ENGINEERING CONSTRUCTION CONTRACT NO: 16-084,0 1 PROJECT: Appleway Shared Use Path CONTRACT DATE: 2/3/2017 PRIME CONTRACTOR: T. LaRiviere Equipment&Excavation CIP NO: 227 DESCRIPTION'OF CHANGES Issue#1-Bollard Revision Issue#2-Existing Irrigation Work Issue#3-Exisitng Chain Link Fence Work Item No. Description Unit Quantity Unit Price Total 183 Bollard Type 1 EACH -6 $950.00 -$5,700.00 209 Park Bollard EACH 6 $1,520.50 $9,123.00 210 Irrigation System Revision EST. 1 $2,000.00 $2,000.00 211 Chain Link Fence Revision EST. 1 $1,000.00 $1,000.00 Total Amount of this Change Order(incl.Tax): $6,423.00 PHYSICAL COMPLETION Original Contract Working Days: 60 Revision By This Change Order: 0 Revisions by Prior Change Orders: 0 Total Revised Contract Working Days: 60 CONTRACT AMOUNT THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT $ 1,680,981.00 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT (through CO#N/A) $ 0.00 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 1,680,981.00 NET THIS CHANGE ORDER $ 6,423.00 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 1,687,404.00 CONTRACTOR ACCEPTANCE: - DATE: 6/16/17 The contractor hereby accepts this adjustment unde the t s of Section 1-04.4 of the original contract. � RECOMMENDED BY: ----#P1 ... rn//DATE: "' (o/J7 A Project Manager _7k/1_ APPROVED BY: � DATE: CIP Ma ager APPROVED BY: W6CDATE: 7 A(1-7 4;,eryetTCity Manager ATTACHMENTS: Change Order Description Bollard Detail Distribution: ORIGINAL TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor, Project File, Project Inspector, Finance Department COSV Form 9/5/2014 0%, Public Works Department Sjökane Capital Improvement Program V le=T 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 .�J/ 509.921.1000 ♦ Fax: 509.688-0261 • cityhall®spokanevalley.org Change Order 1 Memorandum Date: June 30, 2017 To: John Hohman, Deputy City Manager From: Robert Lochmiller, Project Engineer /.............-- Through: Gloria Mantz, Int. CIP Mgr Re: Change Order#1 —Appleway Shared Use Path Project, CIP#0227 Budget Account No.: 311.000.227.595.62.63.00 T. LaRiviere Equipment & Excavation, Contract No.16-084.of This change order revises the type of bollards (6) the Contractor will install as part of the project, this is upon the request of Parks & Recreation Department. The change order also includes work to restore existing fencing and irrigation encountered during construction. This work will be tracked and paid for under force account (time and material) The total estimated cost for this Change Order work is $6,423.00 paid for by Fund 312. There are sufficient funds in the project budget to cover these costs. Original Contract Amount: $1,680,981.00 Previous Change Order Cost: $0.00 Change Order#1 Cost: $6,423.00 Project Cost including Change Order#1: $1,687,404.00 15% of Original Contract amount: $252,147.15 Max Deputy City Manager Contract authority: $75,000.00 ($75,000 or 15% of original contract amount, whichever is less) Change Order Cost to date: $6,423.00 • Remaining Deputy City Manager Contract Authority after CO #1: $68,577.00 cc: Finance Department Clerk's office \1111416, Spokne ValleyChange Order No: 1 Construction Contract No: 16-084 THE CONTRACT IS MODIFIED AS FOLLOWS: WORK TO INCLUDE Background: Issue#1-Bollard Revision The City's Parks and Recreation Department requested to revise the bollard type specified in the Contract. The Contract refers to WSDOT standard plan H-60.10-01 for the bollard type. The same bollard was installed in the first phase of the Appleway Trail (University to Pines)and the department has had issues maintaining these bollards, especially with their locking capabilities. The department requests that this project use the same bollards that have been used throughout the City's park system. City submitted Request for Pricing#1 on 3/17/17 for the new bollards T.LaRivere Equipment&Excavating submitted price quote on 4/18/17 Issue#2-Existing Irrigation Encountered Existing irrigation systems that serve abutting properties have been encounter during the excavation and grading operations within the project limits. These irrigation lines were not identified in the Contract and the Contract does not account for any work to reconfigure/move the existing irrigation systems out of the project improvements. Issue#3-Existing Chain Link Fence Modifications Additional sections of chain link fence(See FWD#2)need to be removed in order to install planned landscape improvements. These sections are at the ends of chain link fence runs where there are special pull posts. Removing these end post require converting the last remaining fence post into a pull post. The Contract does not account for moving the pull post apparatuses from the existing end post and installing them on the last remaining fence post to convert it. City submitted Field Work Directive#2 on 5/8/17 to direct the additional fence removal. Description of Change: Issue#1-Bollard Revision This change order deletes the six bollards in bid item#183-Bollard Type 1 and creates a new item for the revised 6 bollards Issue#2-Existing Irrigation Encountered This change order creates a time and material item to pay for any work deemed necessary by the Engineer to modify or reconfigure existing irrigation lines. Issue#3-Existing Chain Link Fence Modifications This change order creates a time and material item to pay for any work deemed necessary by the Engineer to restore existing chain link fences back to an existing fence post after sections of fence have been removed. Specification: Issue#1-Bollard Revision The material for the new bollard shall have the following requirements: SaTY OF 4 Change Order No: 1 \T1Itjy Construction Contract No: 16-084 4.0.0 1. Fabrication: a. Material: 6-inch ID,0.280-inch wall, Schedule 40 steel pipe b. Sidewall: Plain 2. Height: 36 inches 3. Top: Domed steel top 4. Mounting: Removable flanged,pad lockable 5. Finish: Thermoplastic powder coated 6. Accessories: a. Conspicuity Tape(2 Vertical Strips) b. Pad lockable hole covers for removable bollards 7. Color: Black Issue#2-Existing Irrigation Encountered The Contract Special Provisions are supplemented with the following: 8-03 IRRIGATION SYSTEMS 8-03.1 Description Section 8-03.1 is supplemented with the following: This work also consists of reconfiguring existing irrigation systems behind back of sidewalk. 8-03.2 Materials Section 8-03.2 is supplemented with the following: Components from the existing system may be re-used, if they are not damaged during removal and relocation. New sprinkler system components shall be the same type when still available. 8-03.3 Construction Requirements 8-03.3(15) Existing Irrigation System Restoration Add the following new section: Any modifications necessary to relocate and restore private property irrigation systems will be field directed by the Engineer. Issue#3-Existing Chain Link Fence Modifications No changes have been made to Contract Specifications because of the change: Plans: Issue#1-Bollard Revision That attached bollard detail is added. Bollard location and pad remains according to plan. Issue#2-Existing Irrigation Encountered No changes have been made to Contract Plans because of this change. Issue#2-Existing Irrigation Encountered sin) \ Nu rft, o� Change Order No: 1 VeY Construction Contract No: 16-084 411100011r No changes have been made to Contract Plans because of this change. Issue#3-Existing Chain Link Fence Modifications No changes have been made to Contract Plans because of this change. Time: Issue#1-Bollard Revision No working days are added or deleted due to this change. Issue#2-Existing Irrigation Encountered No working days are added or deleted due to this change. Issue#3-Existing Chain Link Fence Modifications No working days are added or deleted due to this change. Measurement: Issue#1-Bollard Revision Measurement for bollards will be per each for the bollard furnished and installed. Issue#2-Existing Irrigation Encountered There are no changes to measurement because of this change. Issue#3-Existing Chain Link Fence Modifications There are no changes to measurement because of this change Payment: Issue#1-Bollard Revision Payment for new item#209"Park Bollard"per each The unit Contract price per each for"Park Bollard",shall be full payment for all Work to construct and install the bollard. Issue#2-Existing Irrigation Encountered Payment for new item#210-"Irrigation System Revision",by force account as provided in Section 1-09.6. Modifications to existing irrigation systems including installing new lines,valves and fittings;pipes,replacing sprinkler system components with same type,replacing valves and fittings,flush pipes,and any additional Work deemed necessary by the Engineer will be paid for by force account in accordance with Section 1-09.6. Issue#3-Existing Chain Link Fence Modifications Payment for new item#211-"Chain Link Fence Revision", by force account as provided in Section 1-09.6. Modifications to existing chain link fence including installing new or existing fence apparatuses to tie and connect the existing fence back to the last remaining post or any additional Work deemed necessary by the Engineer will be paid for by force account in accordance with Section 1-09.6. Summary of Quantities: sou Change Order No: 1 ...•OEley Construction Contract No: 16-084 Previous New Estim Bid Item Description UnitQty Qty Qty Unit Price Amount Change 183 Bollard Type 1 EACH 6 0 -6 $950.00 -$5,700.00 209 Park Bollard EACH - 6 +6 $1,520.50 +$9,123.00 (New) 210 Irrigation System Revision EST. - 1 +1 $2,000.00 $2,000.00 (New) 211 Chain Link Fence Revision EST. - 1 +1 $1,000.00 $1,000.00 (New) TOTAL $6,423.00 I– w o Z • J0. J O � 0 Z cp O J iii U - W fa: coH C U W COa. a' fA o (n O a 0 O v W fgLU zpmJ o Q W Q m U U Q QLLZOI— U Q WJIX E 2I- W U W OmOw < c O c0Q c fA 1 fn I— W• CO— D > H U Z < 0 LI_ = D Q Z 2a0 I w w W I – Z Ja U '' > . ; 0(JD - WZ I >� W . U Q 0 a0 z W I I <ct Owz O0WA pO p Z U z F— o / ,041 / Q Q „0-,£ Z 0 W cnp p m 0 To o H W W W W6Q NwC� w � a •ao0 QRZ 00tH � �otiw 0 W o Z0 ZUJ 0 Q K 'zt.W Ce " � 0o OZO w �WQW > � r- Uw UQm m �Omm O fi \ OpZ _ zJwzo O <O w c 0 I OI— O< Ow ` �, vV JH ° a Ju)H.Q WJ 0 Q z ''�' Q0W Wm J N „0-,Z uj 1— Z Z LL J co r Z O Z 0O < a Z N M etO . J