2013, 07-22 Permit: SW-13001276 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001276
Permit Issued Date: 07/22/2013
Expiration Date: 07/22/2014
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
W PONDEROSA
COLLINS, ANTHONY J & TRACI
509-922-4521
Applicant: COLLINS, ANTHONY J & TRACI
Address:
Phone:
Email:
10420 E 44TH AVE
SPOKANE VALLEY, WA 99206
509-922-4521
SITE INFORMATION:
Site Address: 10420 E 44TH AVE
Parcel Number. 44051.0602
Assessor's Description: PONDEROSA ACRES 2ND ADD L2 B6
Inspection Area: : (509)477-3675
Zoning:
Owner:
Address:
Phone:
Email:
Water District: Spokane County Water
District #3
COLLINS, ANTHONY J & TRACI
10420 E 44TH AVE
SPOKANE VALLEY, WA 99206
509-922-4521
Fire District: Fire District 8
Land Area: 70400 Square Feet
CONTRACTOR INFORMATION
OWNER, Exp. 12/31/2015
OWNER PERFORMING THE WORK
SAME AS SITE ADDRESS SAME, WA 00000
DETAILS.
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL.
Processing - Utilities
Utilities Permlt
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS
Inside Public Transit Benefit Area
CALL 1-800424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY,
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
Date Printed: 07/22/2013 11:59:04 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001276 Permit Issued Date: 07/22/2013
Expiration Date: 07/22/2014
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/22/2013 11:59:04 Project Coordinator: Kathy Cummings