Loading...
2013, 10-24 Permit: SW-13001880 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001880 Permit Issued Date: 10/24/2013 Expiration Date: 10/24/2014 Project Description: SEWER CONNECTION Project Name: W PONDEROSA PH 2 Primary Contact: C H CONSTRUCTION Phone: 509-710-6794 Applicant: C H CONSTRUCTION Address: 10716 E 46TH AVE SPOKANE, WA 99206 Phone: 509-710-6794 Email: SITE INFORMATION: Site Address: 10714 E 44TH AVE Owner: HUCK, CHRISTOPHER E / RONALD L & SUSAN D Parcel Number. 44042.0401 Address: 10716 E 46TH AVE SPOKANE, WA 99206 Phone: Assessor's Description: MYRON ESTATES NO 2 L1 B4 Email: Inspection Area: : (509)-477-3675 Water District: Spokane County Water Fire District: Fire District 8 District 43 Zoning: Land Area: 43521 Square Feet CONTRACTOR INFORMATION: CHCONHC893DQ, Exp. 04/152015 C H CONSTRUCTION 10716 E 46TH AVE SPOKANE, WA 99206 509-710-6794 DETAILS. Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DFTAII • Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 $125.00 CONDITIONS' Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FORA 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 10/24/2013 14:55:29 Project Coordinator. Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001880 Permit Issued Date: 10/24/2013 Expiration Date: 10/24/2014 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 10/24/2013 14:55:29 Project Coordinator: Kathy Cummings