Loading...
2002, 10-03 Permit: 02008680 SewerSPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 11214 E44THAVE Spokane, WA 00000 Parcel Number. 44042.0312 Subdivision: MYRON ESTATES X2 Block: 3 Lot: 2 Zoning: UR -3 Urban Residential 3.5 Owner: BREKKE, W H Address: 11214 E 44TH AVE SPOKANE, WA 99206-9414 Building Inspector: DAN HOWARD Water Dist: Project Number: 02008680 Inv: 1 Issue Date: 10/3/02 Permit Use: SEWER CONNECTION - S PONDEROSA Applicant: COURCHAINE CONSTRUCTION 19818 E SPRAGUE GREENACRES, WA 99016 Phone: (509) 924-5485 Contact: COURCHAINE CONSTRUCTION 19818E SPRAGUE GREENACRES, WA 99016 Phone: (509) 924-5485 Setbacks - Front Left: Right: Rear: Group Name: Project Name: Permits Sewer Connection Permit Contractor: CaiJRC[tAINE CONSTRUCTION License p: COURCCI81R7 SEWER CONNECTION 1 $85.00 PROCESSING PEE $15.00 Total Perndt Fee: $100.00 FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILPDES 8:1;5:06 PM MONDAY THRU FRIDAY Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prior to any other excavation. Sewer stubs are to be checked prior to connection to cusum that the/ have acceptable grade and are clear and unobstructed to the main sewer. Sewer lines should be constructed to allow for gravity flow from the lowest level of the structure. This pennil must be presented to the job site inspector for verification. ,To jocai'e buried cables, gas piping, water lines, etc. CALL BEFORE YOU DIG, (509)456-8000. i ^ s4 STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THEyCALL BEFORE YOU DIG" CENTER BE NOI (PIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)456-8000. Payment Summary Total Fees AmountPaid Amountlwinv $100.00 sioo.00 10.00_ Tran Date Receipt# Payment Amt 10/3/02 Processed By: BURRIS, ROBIN Printed By: WENDEL, GLORIA Page 1 of 1 7744 $100.00 PERMIT NOTICE It is the responsibility of the applicant/permittee, not Spokane County, to see to It that the use described on the front of this permit complies with applicable codes and requirements and that required Inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant'srpermittee's or property owner's expense. At a minimum, the following Inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, Including manufactured homes. NOTE: This Inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of- way. Curb lines and fence lines are not necessarily indicative of property lines. In same residential areas, the County can own as much as 20 feet of tight -of -way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions Hes solely with the permittee—neither Spokane County nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require Its relocation at the ownera/permitte,e's expanse. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blacking is in place, and prior to concealing. 4. INSULATION - prior to the Installation of drywall. 6. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. 1Asl permits require final Inspection. NOTE: In addition to inspection of the structure, this inspection Includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the Installation of fire hydrants, lire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permlVsite plan which must be com- pleted prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - Final Inspection required when complete, stairs, handrails, skirting, etc. Installed, and prior to occupancy; completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, 11 gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for °special Inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Division of Building and Code Enforcement 477-3676 • Construction In a good plain, Division of Engineering & Roads 477-3600 • Electrical wiring, State Department of Labor and Industries 324-2640 • On-site waste disposal system, Spokane Regional Health District 324-1560 • Road cuts for utilities or driveways, Division of Engineering & Roads - 48-HOUR NOTICE REQUIRED 477-3600 or State Department of Transportation 456-9000 • Sewer connection, Division of Utilities 477-3604 or City Public Works Department 626-6900 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation If the work authorized by the permit Is not commenced or is stopped for a pedod of 180 days, unless a written request for an extension of the permit Is received and approved by the Building Official prior to expiration. At a minimum an Inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us If you have any questions. All refund requests must be made In writing by the applicanVpermittee (shown on the reverse) no later than 180 days atter the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or In conducting Inspections pertaining to It, or find erroneous information In the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Division of Building & Code Enforcement 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133