2009, 12-16 Permit: 09004005 Insert, Piping41
1
*Wane
PERMIT CENTER
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 11325 E 45TH AVE
Parcel Number: 44042.0514
Subdivision:
Block: Lot:
Zoning: R-2 SF Res Suburban District
Owner: KETTLESON, EARL A & JUDITH
Address: 11325 E 45TH AVE
SPOKANE VALLEY, WA 99206 -
Building Inspector: SOUTH
Water Dist: SPO CO WATER DIST#1
Project Number: 09004005 Inv: 1 Issue Date: 12/16/2009
Permit Use: 1 GAS INSERT, 1 GAS PIPING
Applicant: FALCO STOVE SHOP
9310 E SPRAGUE AVE
SPOKANE WA 99206
Contact: FALCO STOVE SHOP
9310 E SPRAGUE AVE
SPOKANE WA 99206
Phone: (509) 926-8911
Phone: (509) 926-8911
Setbacks - Front: Left: Right: Rear:
Group Name:
Project Name:
Permits
1
Mechanical Permit Contractor: FALCO STOVE SHOP
License #: FALCOI*953DA
GAS PIPING
PROCESSING FEE
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
1 $1.00 GAS LOG OR GAS INSERT
$37.00
Total Permit Fee:
1 $11.00
$49.00
Payment Summary
Total Fees AmountPaid AmountOwing
$49.00 $49.00 $0.00
Tran Date Receipt # Payment Amt
12/16/2009 21167 $49.00
Processed By: Main, Jodi L
Printed By: MORRIS, HEATHER Page 1 of 1
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant. by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, Including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibllity to comply with applicable
setback provisions Iles solely with the permittee-nelther the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering, and final.
MECHANICAL - rough -in of piping, before covering. metal chimneys before concealment, and final.
FRAMING - after all framing. bradng and blocking Is In place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL - when complete and prior to occupancy and/or use. All permits require final Inspection.
NOTE: In addition to inspection of the structure. this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit Items such as the Installation of fire hydrants. fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final Inspection required when complete, stairs, handrails, skirting, etc. Installed, and prior to occupancy
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall. concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections In conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688.0054
Pemts and Inspections for dectia Moo, Stale Department of Labor
Md Industries 324.2600
Pemits and mapRunns for onsite septic systems. Spokane Regional
Health Distnot 324-1560
Road cuts for utilities or driveways. City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Pemlls and inspections for Sewer Connection, Spokane County Utilities 0NYM
477-3604
Fire sprinkler and atamm systems and pdval access road inspections, Spokane valley
Fire Department 892-4122
stale law RCW 19.122 requires (hal p,W to any excavation to CALL BEFORE YOU DIG'cenler must be notlfled. Call before you dig al least2 woMing days in advance. 456-a000.
(((etX11T EXPIRATION AND REFUNDS
All permits shall expire by limitation di ecar)dae'• '-not started within 180 days of obtaining a permit or b) work is
abandoned for 180 days or more aftte inraqt,work, or c =4 o years from the date of permit Issuance, regardless of whether the work is
finished. If a permit is expired for time, a new pen it Rma • •b d for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit Issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent Date
Staff Approval Date
City of Spokane Valley
Building Dept
Receipt
Receipt Number: 21167 Customer Number
Projects
Miscellaneous Items
Tender
Full
InvAm j Owin� PAID Pmt
Project Nbr Inv Nbr
09004005 1
smell- sad
Total: 9.OAJ X49.0. L. -SAUDI $49.00
$49.00
Total PAID:
Notes:
Tran Date / Time:
By:
Logon User:
Station:
Override By:
12/16/2009 4:33:23 PM
HMORRIS
BldgCounter
CX_SV00014A
Total TENDERED:
$49.00
TENDERED
49.00
Over / (Short)
Change
49.00
$0.00
$0.00
Printed: 12/16/2009 4:33:24 PM Page 1 of I