2009, 02-24 Permit App: 09000423 Porch RoofProject Nmnber. 09000423 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2242009 Page 1 of 2
Project Information:
Permit Use. CONSTRUCTION OF PORCH ROOF OVER
EXISTING DECK
Setbacks: Front
Site Information:
Left: Right Rear.
Plat Key: 001738 Name: MYRON EST # 2 01ST ADD
Contact: RICHARD & SONS
Address: 4703 N SUNNYVALE DR
C - S - Z: SPOKANE, WA 99206
Phone: (509) 879-5815
Group Name:
Project Name:
District: Sout
Parcel Number: 44042.0516 Block:
SiteAddress: 11413 E 45TH AVE
Location:: CSV
Lot:
Owner: Name: BAKER, LESTER R & SYLVIA V
Address: 11413 E 45TH AVE
SPOKANE VALLEY WA 99206
Zoning: R-2 SF Res Suburban District
Water District: 101 SPO CO WATER DIST#3B
Area: 11,375 Sq Ft Width: 87
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Hold: ❑
Depth: 130 Right Of Way (ft): 0
Review Information:
Review
Building Plan Review
Rete d By:
Originally Released: 2/24/2009 By: RGUERRY
Landuse/Zoning/HE Conditions
Permits:
[Released By:
Operator: jmm
Originally Released: 2232009 By: mharnois
Printed By: jmm
Print Date: 2/24/2009
Project Number: 09000423 Inv: 1
Application
TIES IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2/24/2009 Page 2 of 2
Building Permit
Contractor. RICHARD & SONS LLC Firm: RICHARD & SONS LLC
Address: 4703 N SUNNYVALE DR Phone: (509) 891-2941
SPOKANE, WA 99216
This Application: Total Project:
Description m TL Notes So Et Valuation So Ft Valuation
COV DECK R-3 VB COVERED 0 $4,704.00 0 $4,704.00
PORCH
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RV W <7999 SQ FT
Notes:
Payment Summary:
Permit Type
Building Permit
Totals: 0 $4,704.00 0 $4,70400
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$111.25
$4.50
$44.50
$160.25
Fee Amount Invoice Amount Amount Paid Amount Owing
$160.25 $16025 $27.70 $132.55
$160.25 $160.25 $27.70 $132.55
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees tbat all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator. jmm Printed By: jmm Print Date: 2/24/2009
Spokane
jValley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 992
(509)688-0036 FAX:,(S
www. spokanevalley.oi I
ED BY
KANE VALLEY
PERMIT NUMBER.` t'Z 3
PERMIT FEE:
FEB 23 2009
Pttl&ANgOnStruCtiOn ❑ Accessory Bldg
model Deck
Other:
SITE ADDRESS:
1\413 E. 451A\1 .
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
g
DIMENSIONS:
Name: Les Aro r, tare 'esagtr
TOTAL HABITABLE SPACE:
Address: 11413 51* M
2Nu FLOOR SQ. FTG:
City: 5[ NE Jit State: WA
Zip: Tit?�O _
Phone: 5 Dq ^ 2.14 _ ZZcigt
Fax:
Contact Person
Name: Set K— Of 111
Phone: .F(0--.g6Jolt
Contractor:
g
DIMENSIONS:
Name: 0icor? Artz sw6 L .L.C.
TOTAL HABITABLE SPACE:
Address: ,4 7a3 13. Sv,,we\i pe.
2Nu FLOOR SQ. FTG:
State: I ,1 pr
City: StctOti4E. \IALLtre /V
1
Zip: qq k',
Phone: 5cc . 6156� , I Fax:
GARAGE SQ. FTG:
Contractor Lic No: acosogZ'.lExp Date:
30% SLOPES ON
PROPERTY:
City Business Lic. No:
CONSTRUCTION TYPE:
Describe the scope of work in detail: Cost of Project: $ 47
Cows72uc vot4 of PbRC RooF N Z EILSC) l•Kr i 5TIL ut^'Cu .
Proposed Use:
**Tb f llowin MUST be complete: (write N/A if not alicable)**********************
pp
........... e o
HEIGHT TO PEAK:
g
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2Nu FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
DECK/COV. PATIOS FTG:
!L' * le1 t Pik
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be rocessed.
;;;;ii.
Method of Payment:
0 Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
0 Check
❑ Mastercard
Expires:
DATE: Z - 23-1007
❑ VISA
VIN#:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to eacth'document required for complete submittal.
❑ SITE PLAN
o Property fines and dimensions
o Direction arrow pointing North and orientation to streets
❑ Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spicing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
O Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
❑ Passive system with Emil vapor barrier
Miscellaneous Construction Details
O Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
O Stairway tread rise & run and nosing
o Window and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl spade access locations
o Fire Wall construction •
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
Spokane
jUalley°
For City Use Only
PLUS Project Number j`-,�
Project Address // `=// qty.,
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 • permitcenter®spokanevaUey.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
) l
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Proiect Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
FE:1 CE
SrvE PLAJ
z
z1114" S,JE r5+uA
FRNT
CEP+.2 Ae�A
(O !JAILED "ToyegiEK
Ateoepi bib" To CoAf-
SGSSo Teuss€$ MSTALLEO
To IlAkiLlFACTUIZEes SPECS
z
ShA(L-le,h SOFFIT
II 11
3 2wi2 t4AJzo
Tooemoz. ect ODCE
ONLEA AND I-INNbfeea Tu
V''‘C "rear -ifs, Paso
X bTac_enED Po>
Ca/M.31 S vers -1
FooTi�U Yo -raucs SEMI
EYISTl. b- JOISTS
P2
Pons PouWIL4
'k FST APAC7
Pbsrri>
2r$ oN 291 CEiJWis
RDD M-1bMEt f x 8 J0151 iN &ETvJEEi
EA 4 E1&ws-ibJ6- Jor
2Q
3 NLIED
wrH
SoNOTu3
Foan�1�
-2-Doo ?sV Cow cera
MJD METAL expiCeSV PCCDCZI
To Copr
SIbE
LM- BOLT EY15Tikl&
LEQb Th W6<.L
TDP
30 if' ?rBco TEc7ueAL
LhM chime Suiw(,tes
Ropf ft- r,lc. VENTED
wriu RiDbE (NEC. IZlObeUE&IT
ICE' P% iNFC62 SFf{Fum Sve¢iEt
DN 8'vcS
I)(
EX(SZ Or DECK
E
0
4
N
a9 7
r
F JCE
SrvE PLAN)
z 4ll
Sub PADA
3 4.10 NAILED T0&EV11E2
pceotAiM& To Copf
SGSSoe TQusSES 1FJSTALLED
-ro MAuttrACTuzern SPECS
Y b"TREa-tED PUT
'LDIJTIrJ IADDD FCDVl
FOOTIJ17 To TR.uss EEp11
of
3 2 NAILED
To&BTxI:t Poe coos
NRhED AND t}At4bfLEp To
b"xb` -rear%gp PTS
EYISTirJb JDIsiS PR.
?psis eo4gH(k
u )1- mer APAIT
2.5 ou 24 OEtJt2s Fy Fb cp
PDD prwtr Ee Z" 8 joist
FAcAl E'p [W6- Jos.(
II BEiWE€bJ
2A
3u RA ED
le 5000TU5 F9Dtlab-
weft 2-000 PSI CcA4CitrciE
AND METAL 2ACe6f PCCo¢olJl
To cow
SIP€
HANDRAILS: Height of 34 — 38 inches when required by four or
more.risers shall be continuous the full length of stairs with the
ends returned or rounded. LANDINGS: Required min. width of 36
in. or width of stairway and 36 in. travel distance
STAIRWAY& Minimum width 36 in. with min. tread
run of 10 in., max. rise of 7 % in. & nosing of r%-1 % in.
Min. 6 ft. 8 in. headroom. Enclosed usable space under
stairways requires 1 hour fire protection of %a in. GWB
DECICS: Ledger board requires %" lag bolt @ 16" o.c. with
flashing behind. Guardrail 36 in. high required if floor more than
30 in. above grade. Picket spacing no more than 4 in. apart. Posts
require approved base and beam connectors. Min. 24 in. frost
protection to finish grade with min. 12 in. footing base.
LANDING required on both sides of exit doors win) min. size or S
ft. measured in direction of travel by 3 ft. or width of door if
greater, and not lower than 1 % in. below threshold. Landing
required at other exterior doors is a minimum size of 3 ft travel
distance by width of door, and not lower than 7 % in. below
threshold provided the door does not swing over the landing.
•1 3
CA22iME Bat?
TDP
-1116 056 RDvE
au N cuwen
3o it PmBeo ARct+z uo..AL
L/arm c.iJMe suwl,Lgs
RDOF kTdlIe JENYEp
W17µ RID6E 01a IZIU6Echi Ehtr
IGE' wun wN!EP.
Og EWES
•
0
Vv
EXES1WIr DEcK
I(103 Y' D
REVI
S
CITY COPY
ley
;� • / EV L 3i DEU LCOMPLIANCE
DIVISION S O
'AL lI i��