2005, 08-22 Permit: 05002981 Pole Bldg1
S�Ineai�e�
BUILDING DIVISION
11707 E. Sprague Avenue, Suite 106
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 11027 E 46TH AVE
Parcel Number: 44042.0810
Subdivision:
Block: Lot:
Zoning: UR -3 Urban Residential 3.5
Owner: STENDER, DOUGLAS & KATHY
Address: 11027 E 46TH AVE
SPOKANE VALLEY, WA 99206
Building Inspector: MARK HILLABRANDT
Water Dist:
Project Number: 05002981 Inv: 1 Issue Date: 08/22/2005
Permit Use: 30 X 30 X 16 DETACHED POLE BUILDING
Applicant: QUALITY STEEL BLDGS
7810 N MARKET ST
SPOKANE, WA. 99217 Phone: (509) 468-1606
Contact: QUALITY STEEL BLDGS
7810 N MARKET ST
SPOKANE, WA. 99217 Phone: (509) 468-1606
Setbacks - Front: 63 Left: 7 Right: 132 Rear: 11
Group Name:
Project Name:
Permits
Building Permit Contractor:
QUALITY STEEL BUILDINGS INC License #: QUALISB081C7
DETACHED
GARAGE
Total Value:
FOR BUILDING INSPECTIONS CALL (509) 688-0054.
U-1 VB 900 RESIDENTIAL PERMIT FEE
STATE SURCHARGE
$17,100.00
$293.25
$4.50
Total Permit Fee: $297.75
Payment Summary
Total Fees AmountPaid AmountOwing
$297.75 $297.75 $0.00
"Iran Date
08/22/2005
Receipt # Payment Amt
2462 $297.75
Notes / Conditions of Approval
MUST PROVIDE COPY OF ENGINEERED PLANS FOR ON SITE INSPECTIONS.
Processed By: JANSSEN, CHRISTINA
Printed By: KURTZ, KARI Page 1 of 1
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant. by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from properly lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verity their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owners/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering, and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL -when complete and prior to occupancy and/or use. All permits require final Inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permlL Items such as the Installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/slte plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes Interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 686-0054
Remits and inspections For electrical Mang. Stale Department of Labor
And Indusines 324.25540
Pent: and lnspedrons for an -Site sepuc ayaten¢. Spokane Regional
Health District 324.15E0
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for Sewer Connection. Spokane County Utilises Division
47/4604
F,re sprinkler and alarm smens and private access road inspections, Spokane vaney
Fire Department 8924172
Stare law RCW 19122 requires that pnp to any excavation the 'CALL BEFORE YOU DIG' center trust to notified. Call before you dg at least 2 working days in advance, 4560000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared vold if a) work is not started within 180 days of obtaining a permit, or b) work Is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made In writing by the original permittee to the Building Offidal no later than 180 days after the date of fee
payment 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authodzed
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner/Agent Date
Staff Approval Date