17-027.01 Inland Asphalt: Indiana Street Preservation • Spokane Val.`J CHANGE ORDER NO: 1 DEPARTMENT OF PUBLIC WORKS CONSTRUCTION CONTRACT NO: 17-027 a 0l PROJECT: Indiana Street Preservation Project CONTRACT DATE: 5/11/2017 PRIME CONTRACTOR: Inland Asphalt Company CIP NO: 255 DESCRIPTION OF CHANGES This Change Order pertains to Bid Schedule A,and adds in unit bid prices, per each, for adjusting existing water valves and manholes during grinding and paving work. This change results in an increase to the Contract amount as noted herein. Item No. Description Unit Quantity Unit Price Total 139 Adjust Existing Water Valve EA 4 $ 450.00 $ 1,800.00 140 Adjust Existing Manhole EA 6 $700.00 4,200.00 Total Amount of this Change Order(incl.Tax): $ 6,000.00 PHYSICAL COMPLETION Original Contract Working Days: 15 Revision By This Change Order: 1 Revisions by Prior Change Orders: 0 Total Revised Contract Working Days: 16 CONTRACT AMOUNT THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT $ 445,868.00 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT(through CO#J $ 0.00 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 445,868.00 NET THIS CHANGE ORDER $ 6,000.00 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 451,868.00 Ogft ,gredbyMMghWHu ;,�//,I HuphWNu•4 auAN.dNVh+M 1 1mNFehug'benk'"a"W''"'"'"om 05/23/2017 CONTRACTOR ACCEPTANCE: /�/ �-"S,�„,,,•,,,n,s„- DATE: The contractor hereby accepts this adjustment under the of Section 1-04.4 of the original contract. RECOMMENDED BY: ` d”” DATE: S• (' !7 Prroject/Manager APPROVED BY: .),J1t r/��%V�J� DATE: S1/4.3//a- CIP anager APPROVED BY: DATE: S—Z 3 —i 7 Deputy City Manager ATTACHMENTS: Distribution: ORIGINAL TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor, PW Project File,Project Inspector,Finance Department • COSV Form 9/5/2014 • ��ITS°F Public Works Department e Capital Improvement Program \7i11ey 11707 E Sprague Ave Suite 106 0 Spokane Valley WA 99206 509.921.1000 0 Fax: 509.688-0261 0 cityhall®spokanevalley.org Change Order 1 Memorandum Date: May 23, 2017 To: John Hohman, Deputy City Mgr e' 1,„„/� From: Craig Aldworth, Pr. Engr. �,A Through: Gloria Mantz, Int. CIP Mgr Re: Change Order#1 for Indiana Street Preservation Project, CIP#0255 Budget Account No.: 311.000.255.595.30.63.00 Inland Asphalt Co. Contract No. 17-027 There was no base map survey of the project roadway surface. The project plans did not show 6 existing manholes and 4 water valves that will need to be lowered prior to grinding and raised prior to paving. This change order adds the following items to the Contract: Item# Description Unit Quantity Price/Unit Total 139 Adjust Existing Water Valve EACH 4 $450.00 $1,800.00 140 Adjust Existing Manhole EACH 6 $700.00 $4,200.00 Total $6,000.00 The required adjustment of the manholes is a result of several factors. First, the manholes are located well within the existing 2 way center turn lane, so initially it appeared no adjustment would be required. Second, the new 11.5 foot lane widths reduced the width of the center turn lane. Third, the grind limits on each side of the center turn lane were adjusted further towards center so that C-1 inlay tape could be installed away from a pavement edge. The manhole locations were not field verified against the grind dimensions in the final design. The total estimated cost for this Change Order work is $6,000.00 paid for by Fund 311. There are sufficient funds in the project budget to cover these costs. Original Contract Amount: $445,868.00 Previous Change Order Cost: $0.00 Change Order#1 Cost: $6,000.00 Project Cost including Change Order#1: $451,868.00 15% of Original Contract amount: $66,880.20 Max Deputy City Manager Contract authority: $66,880.20 ($75,000 or 15% of original contract amount, whichever is less) Change Order Cost to date: $6,000.00 Remaining P.W. Director Contract Authority after CO #1: $60,880.20 cc: Finance Department Clerk's office • imanPublic Works Department e Capital Improvement Program elle y 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 • cityhall®spokanevalley.org Change Order Memo Date: May 19, 2017 By: Craig Aldworth Re: Change Order 1 Indiana Street Preservation Project, CIP 0255 1. Describe the Change This change order add into the contract the adjustment of existing water valves and manholes. 2. Evolution of the Change There was no base map survey of the project roadway surface. The project plans did not show 6 existing manholes and 4 water valves that will need to be lowered prior to grinding and raised prior to paving. 3. Payment This change order adds the following items to the Contract: Item # Description Unit Quantity Price/Unit Total 139 Adjust Existing Water Valve EACH 4 $450.00 $1,800.00 140 Adjust Existing Manhole EACH 6 $700.00 $4,200.00 Total $6,000.00 The cost of adjustments is the same bid price obtained on the McDonald Rd Diet project last year. 4. Time One additional day was added to the contract time. 5. Prior Approval The Change Order was approved by the Deputy City Manager on 6. Attachments none