Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2014, 08-26 Permit App: BLD-2014-2060 Pole Bldg
Spokane Valley Community Dedelopm'ot Department Permit Center 11703 East Spragu? Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-2540 Fax: (509) 688-0037 permitcenter@spoka nevalley.orq (Staff Use Only) PERMIT NUMBER: PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ] NEW CONSTRUCTION ❑ DECK SITE ADDRESS: /09%ty t ASSESSORS PARCEL NO.: ❑ ADDITION/REMODEL ❑ OTHER 5p t- thvi\ ,k)'4 9-9o(o 0 -ACCESSORY BUILDING BUILDING OWNER NAME: LEGAL DESCRRTION: rt --i eject flECEDVED A23262014 STATE: t.&) . C S V NAME: Airill..01 sga lLV'c{_ ADDRESS: %09l�71 c__ CITY: Sia ie./Xi/kg— PHONE: ie0.t/kR_PHONE: ' b 9 lot 3 —%''2. Z FAX: TRO X \&- CONTACT NAME: PHONE: 5U 1 — _3 1 ) 2 P Fax: CELL: CONTRACTOR NAME: MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: Deck/Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit Is for construction or on a dwelling, the dwelling Is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be requl ed to besubmitted d subsequently approved before this application can be processed. Signature �. ��,� Date: 4 Updated 1-11-11 C:\Users\bryan.happeny\Desktop\BLD APPS\BLD-RES.doc Page 1 of 1 �p Residential Driveway IRECEIVEDPAVING WAIVER lett ye6 20)4 Co 70 ni Development — Planning Division AUG 11703 E 5•rague Ave Suite B-3 • Spokane Valley WA 99206 509.720.5026 ♦ ax: 509.688.0037 ♦ planning@sookanevallev.org rRl/ pFRMIT CFNTE Spokane Valley Municipal Cod 1$Vryi¢t Sgct18IIi4:��020.@.A ; llr�snlential d ve - y and ofstreet parking areas shall be paved with asphalt, Portland cement gras c r lot kr6rhdr' Ivaenbhard-su a emateria/". A paving waiver can only be granted if the aurayouareproposiogirnotgoln re a driveway for dally use. —OWNER INFORMATION OWNER NAME:' jT4f(J 200 14.A- PARCEL#: 1/ Veva . dos' ADDRESS: iD 911aE. 4) p) Q- CITY: Spakavv, ``q/P.uj STATE: ip� /',., 6 Zip: 9?zLJ PHONE: ) €SD /72) FAX 1 CELL:99 SM.() / 72, a EMAIL: 4CQOC41A-31 @__ Loth L'`, PART II —DETAILS OF PAVING WAIVER: 1. Do you have an existing garage for parking daily use vehicles? [AYES ❑ NO 2. Is the proposed detached structure used for storage only? a—YES ❑ NO 3. Do you plan on using the detached structure to park vehicles? ❑ YES YNO' If yes, then what type of vehicles? 4. Do you plan to conduct a business from proposed detached structure? ❑ YES RNO If so, what is the nature of your business? PART III —AUTHORIZATION I,(PRINT NAME) NAPffrlAD 2, AA- owner, hereby confirm that the information provided on this form is true and correct. I acknowledge that any change In the foregoing conditions, could require the City to impose paving requirements. I further agree to report any change in these conditions to th Sp ane Valley Community Development Department, Planning Division, within 30 days. �sl gLe/,4 Owner Signature Date PART IV — DECISION STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE/COMMUNITY DEVELOPMENT DIRECTOR AND FIND THE REQUEST IS GRANTED AT /09/6 C y7 6U•t SAID ADDRESS FOR PERMIT#: We LP y ziLtz PI nn' g Division Staff Signature Date Created 827/11 Page 1 of 1 WAMBEKE ENGINEERING 2913 East 61s` Court Daniel Wambeke, P. E. Spokane, WA 99223 August 16, 2014 Telephone: 509-443-6186 • Fax: 509-448-6582 • dwambek ' fpnosrecan# _2_01 /l,_().b i _0 RECEIVED Mr. Brian Barnett ZIEGLER LUMBER COMPANY 17002 East Sprague Avenue Spokane Valley, WA 99037 AUG 2 6 2014 C CSV PERMIT CENTEF SUBJECT: 40' X 60' X 16'0" POST FRAME BUILDING FOR NATHAN ROCHA,! 10)916 E. 7T" AVENUE, SPOKANE VALLEY, WA 99206 - Dear Brian: This post frame building has been sold for construction on Mr. Rocha's lot in Spokane Valley using the standard post frame building plans I have prepared for Ziegler Lumber Company. The building design is based on 40 PSF roof live (snow) load, 110 MPH wind speed, Exposure B, Seismic Design Category C and 2,000 PSF allowable soil bearing pressure per the 2012 IBC. The building has 14'/13'9"/11'9"/8'5 3/"/12' post spacing and 4:12 roof pitch roof trusses. I checked this building for the diaphragm design characteristics used in the standard post frame building design. The front endwall has no openings. There is sufficient steel sheeting on this endwall to transfer lateral loads on the sidewall and roof to the base of the building. The rear endwall has no openings. There is sufficient steel siding on this endwall to transfer lateral Toads on the roof and wall to the base of the building. The left sidewall has two 12' x 14' overhead doors, a 10' x 10' overhead door and a 3'pass door. The right sidewall has no openings. Sidewall openings do not affect the lateral load resistance of the building. The standard plans do not address the 14' and 13'9" bays. I have designed this building and detail the structural elements below: • Roof trusses — Use two 40' span roof trusses at each interior truss crossing and single gable end trusses. Trusses shall be designed and certified by the truss manufacturer. Rest the trusses on 2" x 6" x 18" bolting blocks. Place one 3/4' diameter machine bolt and four 16d nails through the truss top chords. Place four 3/4" diameter machine bolts through the bolting block with eight 16 d nails. • Roof purlins — Use 2" x 8" DF -L #2 purlins at 24" o. c. Connect the purlins to the trusses with standard joist hangers. • Sidewall girts — Use 2" x 6" DF -L #2 flat girts at 24" o. c. with 2" x 4" backers at 48" o. c. • Sidewall posts — Use 6" x 10" Hem -fir #2 treated posts embedded in 36" diameter x 3'0" deep concrete footings. • Corner posts — Use 6" x 8" Hem -Fir #2 treated posts embedded in 26" diameter x 3'0" deep concrete footings. • Endwall posts — Use 6" x 8" Hem -fir #2 treated posts embedded in 24" diameter x 3'0" deep concrete footings. • Framing and connections — Use the standard 40 PSF post frame building plans for all framing and connections with the above exceptions. Please contact me if you have any additional questions about the design of this building. ncerel ,C niel arhbeke P.E. Enclosure DW:dw Designer of Small Structures, Post Frame Buildings, Foundations, Light Gauge Steel Framing and Grain Storage Systems 17 0' T 3L 4 10'-3' 13-Y 12-3' 14'4' 12'3' 101-0" ROCHA 10'-0" 10' 0" 101-0" 4x624' 626' 6x828' 6426' fixe 24' x6 ;x10 24' 6x1024' t6x6 20' 6x1024' 6x1024' 6x6 20 1ox10 OHD 6x6 20' 6x1024' 6x8 20' 6x620' 12x14 OHD 5' 16 8x1024' C tx1024' 6x1024' C 211 12x14 OHD 2 6x8 26' 6x8 28' 64 26' fl R 6x824' r. 64 24 40'-0" 40# Snow Load - 4/12 Roof Pitch 60-0" NOTES FOR FLOOR PLAN S1 INTERIOR FRAME WOOD POSTS, SEE POST SCHEDULE THIS SHEET GABLE END WALL POSTS - 6° X 6' TYPICAL DOOR POSTS - 4° X 6' TYPICAL FOOTING DIMENSIONS, B = 1'-8"; D = 3'-0" MAXIMUM PEST SPACING 12'-0° 0 PURLINS @ 24° O.C., BEARING OR JOIST HANGERS (TYPICAL) a I. SPAN w I. w0 J y a —a— z¢ 0 J D 0> ▪ J O • 'Du. X N o a 0▪ . • N 0 LA DOUBLE TRUSSES LE TRUSSE ad • 0 o o X N N N 1y W SINGLE TRUSS PLAN VIEW WAMBEKE ENGINEERING HameiWanbeke. P, E. 3"141,, $1".§4'fi` TiI. fi}N}6186 hw fSPHBi5O8 °-rok tl°enbMatenuen BUILDING PLAN YIEW STANDARD POST FRAME BUILDING PLANS LILGLLR LUMBER COMPANY 620 EAST HOLLAND SPOKAHF. WA 99918 BRAWN BYBATE WAMBEKE -24-08 MPROVEC SCME NTS IBC 01.40WA REV. SEE DETAIL 1 z f D J W L7 Z A 0 = ❑ U F W W N SEE DETAIL 1_,i,‘6;104 *11"traillil° 4,,..41% f.ara' FOR SECTION A -A %Pr 51 PTYPICAL LAN FOR SIZE, SEE FLOOR if I©2 TRUSS DESIGN BY OTHERS 0 2' X 6' @ 24' 0, C., 10' BAYS DF -L #2 GIRTS FLAT @ 24' D.C, 2' X 6' @ 24' O. C„ 12' BAYS SEE DF -L #2 GIRTS FLAT @ 24' O.C. DETAIL 0 CONCRETE FOOTING, SEE SCHEDULE 2 SS EXTEND POST TO TOP OF PURLIN ROOF FASTENED TO PURLINS WITH 1' 1 1/2' LONG WOODFAST TEKS. WALLS FASTENED TO I II WOODFA THTEKS, LONG SEE FOOTING 111 DETAIL A BUILDING SECTION A - A WAMBEKE ENGINEERING Daniel Wanbeke, P. E. DbIRMr4§iA iW 009-143-6106 FPn A4 -446-65a$ a -w h.MelMvnem STANDARD BUILDING SECTION STANDARD POST FRAME BUILDING PLANS LILI1LLN LUMBLN COMPANY 620 EAST HOLLAND SPOKA1F WA SE71R DRAWN SY DATC WAMBEKE -24-08 APPROVED SCALE IBC-02.40WA NTS REV, BUILDING SPECIFICATIONS: GENERAL — ALL BUILDING CONSTRUCTION SHALL CONFORM TO THE 2012 THE INTERNATIONAL BUILDING CODE (IBC 2012) AND ALL STATE & LOCAL BUILDING CODES. THESE SPECIFICATIONS AND PLANS ARE INTENDED FOR USE IN 40 PSF LIVE LOAD, 110 MPH WIND SPEED, EXPOSURE B AND SEISMIC DESIGN CATEGORY C. DESIGN LOADS — ROOF LIVE LOAD = 40 PSF ROOF DEAD LOAD = 5 PSF* CEILING LIVE LOAD = 0 PSF CEILING DEAD LOAD = 1 PSF * ROOF DL ALLOWS FOR A MAXIMUM OF 3" THICKNESS OF FIBERGLASS INSULATION. + MAXIMUM SOIL BEARING PRESSURE = 2,000 PSF MAXIMUM SOIL BEARING PRESSURE 15 BASED ON SAND, SILTY SAND, CLAYEY SAND. SILTY GRAVEL AND CLAYEY GRAVEL SOILS OR BETTER BASED ON IBC TABLE 1806.2. LESSER SOIL CONDITIONS WILL REQUIRE REVIEW AND FOOTING SIZE ADJUSTMENT BY THE ENGINEER. CONCRETE — MINIMUM 28 DAY COMPRESSIVE STRENGTH F'a = 2,000 psl, 4 SACK MIX FOR FOOTINGS. CAST IN PLACE CONCRETE CONSTRUCTION SHALL CONFORM TO ACI 318-11. WOOD — STRUCTURAL LUMBER SHALL CONFORM TO DF—L #2 OR BETTER BY WWPA GRADING RULES. MAXIMUM MOISTURE CONTENT SHALL BE 19% BY WEIGHT. NAILING SHALL CONFORM TO TABLE 2304.9,1 FASTENING SCHEDULE & OTHER APPROPRIATE SECTIONS OF CHAPTER 23 OF THE IBC. ALL NAILS INTO PRESERVATIVE TREATED WOOD SHALL BE HOT—DIPPED ZINC COATED GALVANIZED STEEL, SILICONE BRONZE, COPPER OR STAINLESS STEEL. CCA TREATED DIMENSION LUMBER SHALL CONFORM TO THE REQUIREMENTS OF AWPA STANDARDS C-16, C-22, C-23, C-24 & C-28. POSTS FOR BUILDINGS SHALL BE AS NOTED ON THE PLANS. POSTS SHALL BE TAGGED FOR AND CONFORM TO AWPA CATEGORY UC4B FOR BELOW GRADE USE. ALL POST MATERIALS SHALL BE HEM—FIR #2 OR BETTER, FULL DIMENSION AND GRADED BY WWPA GRADING RULES. HARDWARE SHALL BE SIMPSON OR APPROVED EQUAL. ALL BOLTS SHALL CONFORM TO ASTM A307. METAL PANELS MAY BE DELTA RIB STYLE, GALVANIZED OR PAINTED, 29 GAUGE THICKNESS, ASTM A653 STRUCTURAL QUALITY (SO), FY = 80.0 ksl. ROOF PANELS SHALL BE FASTENED TO PURLINS WITH PLATED, GASKETED 1 1/2" LONG METAL TO W000 FASTENERS. WALL PANELS SHALL BE FASTENED TO GIRTS WITH PLATED. GASKETED 1" OR LONGER METAL TO WOOD FASTENERS. PANELS SHALL BE INSTALLED AND FASTENED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. ALTERNATE ROOFING & SIDING APPLICATIONS — BUILDING ROOF MAY BE SHEETED WITH 15/32" 0.S.B. BOARD, 1/2" C—DX PLYWOOD OR OTHER APA RATED SHEETING, NAILED 0 6" 0. C. W/ 8d OR 10d NAILS. FINISH COVERING FOR SHEETED ROOF MAY BE COMPOSITION ROOFING OVER 30# FELT, OR 29 GAUGE METAL ROOFING OVER 15# FELT. BUILDING MAY BE SIDED WITH 7/16' 0.S.B. BOARD, 1/2" C—DX PLYWOOD, 15/32" T-111 PLYWOOD SIDING OR HARDI—PLANK. LAP SIDING MAY BE INSTALLED OVER BUILDING WRAP MID WALL SHEETING. SHEETING SHALL BE FASTENED TO GIRTS WITH 8d, NAILS O 6" 0. C., OR 1 1/2" LONG X 16 GA. STEEL STAPLES 0 6" 0. C. 0 PANEL EDGES & INTERMEDIATE FRAMING. SOIL COMPACTION — ALL BACKFILLED SOIL BENEATH FOOTINGS SHALL BE COMPACTED WITH A VIBRATORY COMPACTOR TO 95% OF THE PROCTOR DENSITY AS DETERMINED BY ASTM A1557, METHOD D. TRUSSES SHALL BE DESIGNED BY AND BEAR THE SEAL OF AN ENGINEER REGISTERED TO PRACTICE IN THE STATE OF WASHINGTON. TRUSS LOADING: TOP CHORD LIVE LOAD = 40 PSF TOP CHORD DEAD LOAD = 5 PSF BOTTOM CHORD DEAD LOAD = I PSF WAMBEKE ENGINEERING ENGINEERING Daniel Wanbeke. P. E. SMY(eE"iINA.149SyE]e TO 309-143il06 E+y. 509-ee0{300 eve* OnrtelwtW, 2012 IBC SPECIFICATIONS FOR TYPICAL POST FRAME BUILDINGS LILGLER LUMBER COMPANY 620 EAST HOLLAND WA 99218 DRAWNDYDATE WAMBEKE-08-10 0 APPROVED SCALE IBC03— 40WA NTS NTS NOTES FOR FOOTING DETAIL TREATED POSTS AS SIZED PER SCHEDULE VIBRATE OR ROD CONCRETE FULL BEARING ©B UNDISTURBED SOIL SI GRADE A Wrin TO OBTAIN H ti CLEARANCE FOOTING DETAIL N,TS. °T° DEPTH WAMBEKE ENGINEq,IN{G�y�� Demist Wombeke, P. F. 6eN.ar,e WI'A9429 Tali 649-4494166 fuv 509Y48i14 ps UPMMNmmn STANDARD FOOTING DETAILS STANDARD POST FRAME BUILDING PLANS LIEGLLN LUMBER COMPANY 620 EAST HOLLAND SPOKAfF WA 99218 DRAWN ST DATE WAMBEKE —24-08 APPROVED SCALE IBC04 NTS REV. POST/FOOTING SCHEDULE 40' SPANS, 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING "H" W X D "B" DIA. "T" REQUIRED VOLUME, YD3 10'-0" 8'-0" 6" X 6" 30" 3'-O" NO 0.55 10'-0" 10'-0" 6" X 6" 30" 3'- _ - _O 0 _.._ 12'-0"n. 2" X 6" 30" 3'-0" NO 0.55 10'-0" 14'-0" 6" X 6" W/2" X 6" 30" 3'-0" NO 0.55 10'-0" 16'-0" 6" X 8" W-72" X 6" 30" 3'-0" NO 0.55 _ 10'-0" 18'-O" 6" X 8" W12" X 6" 32" 3'-0" NO 0.62 10-0"A 20'-0" 6" X 10 32" 3'-O"NO 0.62 10-0" ~ W 22'-0" 6" X 10" W/2'" X 6" 32 3'-0" NO 0.62 10'-0" 24'-0" 6" X 12" W/2" X 6" 32" 3'-3" NO 0.68 12-0" 8'-0" 6" X 6" 33" 3'-0" NO 0.66 12-0" 10'-0" 6" X 6" W/2" X 6" 33" 3'-0" NO 0.66 12-0" 12'-0" 6" X 8" 33" 3'-0" NO 0.66 12-0" 14'-0" 6" X 8" ° 33" 3'-O" NO 0.66 12-0" 16'4" 6" X 8" W/2" X 6" 33" 3'-0" NO 0.66 12-0" 18'-0" 6" X 10" 33" 3'-0" NO 0.66 12'-0" 20'-0" 6" X 10" W/2" X 6" 33" 3'-0" NO 0.66 12-0" 22'-0" 6" X 12" 34" 3'-2" NO 0.74 12-0" 24'-0" 6" X 12" W/2" X 6" 34" 3'-6" NO 0.82 NOTE: 1. THE NEXT LARGER SIZE POST MAY BE SUBSTITUTED FOR POSTS WITH 2" X 6" LAMINATIONS. 2. ENDWALL POSTS SHALL BE 6" X 6" ROUGH CUT HEM -FIR #2 TREATED POSTS UP TO 15'-0" WALL HEIGHT. ABOVE 15'-O" WALL HEIGHT, ENDWALL POSTS SHALL BE 6" X 8" ROUGH CUT HEM -FIR #2 POSTS. 3. FOOTINGS FOR ENDWALL POSTS SHALL BE A MINIMUM OF 20"95 X 3'-O" DEEP FOR WALL HEIGHTS TO 15'-0". ABOVE 15'-0" WALL HEIGHT, FOOTINGS SHALL BE 24"0 X 3'-4" DEEP. 4, ARQYE FOOTING DESIGNS. ARE FOR POST FRAME B111LDINGS. WITH CONCRETE FLOORS (CONSTRAINED POSTS). IF BUILDINGS WILL. NOT CONCRETE FLOORS, INCREASE FOOTING DIAMETER X 2" & FOOTING DEPTH X 4". Wd,'` WAMBEKE Dunlel ENGINEERING Wamb n"°°`ga w�-Y'�eke.rte. eosaexx 4L ° ' �' �� POST & FOOTING SIZES 38' TO 42' SPANS - 40 PSF L.L. . STANDA D POST FRAME BUILDING PLANS 9°(1 LILGLLK LUMHLN COMPANY -" 620 EAST HOLLAND a .Ak 41018s SPOKAt�1 F. WA 99718 i1'Sf U MBEKE a[v, #C.1 O %NAL „��a SCALEIBC05-40.40WA I1L�-24-08 NTS DETAIL 1 - TRUSS COLUMN CONNECTION, PURLIN SUPPORT Kis NOTES FOR CCNNFFTION DFTA11 ©MANUFACTURED TRUSS TOP CHORDS TRUSS DESIGN BY TRUSS MANUFACTURER ©PURLIN SUPPORT STRUT 2' K 6' X FULL DEPTH OF TOP CHORD PLUS PURLIN. NAIL PURLINS W/(3) 16d NAILS ©NAIL STRUT TO TOP CHORD W/(3) 16d NAILS EACH SIDE. (DMANUFACTURED TRUSS - NAIL TO EACH SIDE OF POST WITH 4 - 16d NAILS ON TOP NAILING BLOCK ©WOOD POST, SEE POST/FOOTING SCHEDULE. ©4 - IDd NAILS 03) 4D iD SOLID BLOCKING AT CONNECTION POINTS. TYP. PURLIN, SEE FLOOR PLAN FOR SIZE 2' X 6' OR 2' X 8' EAVE GIRT KNEE BRACE, IF ROOM. SEE POST SCHEDULE AND DETAIL 2 S2' X 6' )( H4' OR 2' X 8' X 24' BLOCK 1 - 3/4' 0 MACHINE BOLT THRU TRUSS T. CHORD 1 - 3/4' 0 MACHINE BOLT THRU KNEE BRACE 1 - 3/4' 0 MACHINE BOLT THRU BOLTING BLOCK - 3/4' 0 M. BOLT ¢ BOLTING BLOCK - 24' 6 30' 3 - 3/4' 0 M. BOLT 2 BOLTING BLOCK - 36' 6 40' 4 - 3/4' 0 M, BOLT ¢ BOLTING BLOCK - 50' 5 - 3/4' 0 M. BOLT 2 BOLTING BLOCK - 60' ® 4 - 16d NAILS pURLIN CONNECTION METHODS' A). PURLINS MAY BE HUNG OFF THE TRUSS TOP CHORD FACES V/ STD. SIMPSON JOIST HANGERS OR EQUAL. B). PURLINS MAY BE BUTTED AND NAILED W/(2) l6d NAILS INTO EACH PURLIN. C), PURLINS MAY BE LAPPED ANDNAILED W/(3) 16dNAILS. ON CONNECTION METHODS 'B' AND 'C', TOENAIL BACK SIDE OF PURLIN W/() 16d NAIL INTO EACH TOP CHORD MEMBER WAMBEKE ENGINEERING Daniel Wombeke. P. E. :'.'m:,I0, 31`S 3` 1N 509-40- 61% rvt. 599-40-00: ,-n+, OnnbatRiancon TRUSS - COLUMN CONNECTION PURLIN CONNECTION METHODS STANDARD PST FRAM EUILDING PLANS LIE(LLH LUMBLR 6 MPANY 620 EAST HOLLAND CPOKA F. WA 99718 DATE WAMBEKE -24-08 APPROVED SCALE NTS 10006 TYPICAL SIDE ELEVATION WAMBEKE ENGINEERING Daniel Wontan`,,:,` d eke. P, E. P e`a TRU 9R9-449iR1P rev Y9-4104YO2 .W elcanDetkRADDINCPM TYPICAL SIDE ELEVATION STANDARD POST FRAME BUILDING PLANS LFEULLN LUMHJN COMPANY 620 EAST HOLLAND SPOKAN F. WA 99918 DRAWN SY RARE WANBEKE 2-24-08 APPROVER SCALE NTS IBCOBA IPEV r OVERHEAD DOOR OPENING SLIDING DOOR OPENING /�\/�\//\/ / \/\/% /\/ / /\/\\///%/ TYPICAL SIDE ELEVATION NOTES FOR SIDE ELEVATION Si 2' X 8° HEADER 0 2" X 10° HEADER FOR 10' & 12' SLIDING DOORS 2' X 8' HEADER FOR 8^ & SMALLER SLIDING DOORS WAMBEKE ENGINEERING Danle{ Wanbeke, P, E. WAritirtsSMT TAO 109-I43-6lec ha in -44.- Sae e- .I e• exelnen[en TYPICAL SIDE ELEVATION STANDARD POST FRAME BUILDING PLANS 'LIEGLER LUMBER COMPANY 620 EAST HOLLAND SPOKA F WA 9921R WAMBEKE—24-08 DAWN Sr DATE I APPROVED SCALE NTS IBC08 4 12 3068 MANDOOR OPTION OPTIONAL FRONT ELEVATION OPENING NOTES FOR OPTIONAL FRONT ELEVATIONS 0 GABLE END TRUSS DESIGN BY TRUSS MANUFACTURER S2 2' X 10' HEADER UP TO 12' 0' DOORS 2° X 12° HEADER UP TO 20' 0° DOORS 13 2' X 6' HEADER S4 4' X 6' DOOR POST - 8' THRU 14' WALL HEIGHT W/ 2' X 6' FACER. 6' X 6' DOOR POST 16' & 18' WALL HEIGHT W/ 2' X 8' FACER. 0 2' X 4' WINDOW JAMB WAMBEKE ENGINEERING Daniel Wombeke, P. E. �oeem 41ma Te aW-I 3-6fe6 Fe. art44e-stoa rhpe J.✓AMn, n ca FRONT ELEVATION PASS DOOR OPTION TYPICAL POST FRAME BUILDINGS LIEGELII LUMBER COMPANY 620 EAST HOLLAND 4POKA1F WA 94219 DRAWN BYTE WAMBEKE —D24-08 APPROVED SCALE NTS IBC12 I II SL, TYPICAL TRUSS BOTTOM CHORD BRACING NOTES FOR TRUSS BOTTOM CHORD BRACING fi GABLE END TRUSS s© DOUBLE INTERIOR TRUSSES S3 GABLE END POST SL, 2' X 4' BOTTOM CHORD BRACING 2 10' 0' O.C. SS 2' X 3' BLOCK WITH 4 - IOd NAILS TO BOTTOM CHORD BRACE cHFATHING RFQUTtMFNTS THE FOLLOWING MINIMUM ROOF DIAPHRAGM REQUIREMENTS ARE NEEDED + ROOF STEEL, 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALENT ▪ FIELD SCREWS! 4110 x 1 1/2' AT 9. O.C. (NEXT TO HIGH RIB - EACH PURLIN) • EAVE AND RIDGE PURLIN SCREWS! 4114 X1 1/2' AT BOTH SIDES OF EACH MAJOR RIB THE FOLLOWING MINIMUM ENDWALL DIAPHRAGM REQUIRMENTS ARE NEEDED! It EMDVALL STEEL! 29 GAUGE GRAND -RIB Ilt, 36' WIDTH OR EQUIVALENT ▪ FIELD SCREWS 4110 n1 1/2' a 9. O.C, (NEXT TO HIGH RIB) + BASE GIRT, END TRUSS, AND DOOR HEADER SCREWS! 4114 x 1 1/2' E BOTH SIDES OF EACH MAJOR RIB, DIAPHRAGM SCREWS DIAPHRAGM ENDVIVE LLRDOOSCREWS E EADERSNDWALL IDGE PURLINs ON ABLEAENDE GTRUSRT SC TOP CHORD,ROOF NIZTPL11DRa00SCREWS1 TYPICAL SCREW PATTERN, EXCEPT AS STEEL SHEETING SCREW PATTERNS N,T.S WAMBEKE ENGINEERING Daniel WanbekP, P. E, umfOna!gIfi'ag* Tal. ]0344]-6186 Tan SO9J41-[!O ELAM tlnnbMadmcen TRUSS BOTTOM CHORD BRACING & WALL SHEETING TYPICAL POST FRAME BUILDINGS LILGLLk LUMHEN COMPANY 620 EAST HOLLAND SPOKANF WA 99218 DRAWN +Y EATS VAMBEKE724-08 APPROVED SCALE IBCI4 NTS REM T N 1' - 16d NAILS 6', 8" OR 10" POST NAILING PATTERN FOR POST LAMINATIONS NOTE: 2" X 6" LAMINATE MUST BE A TREATED MEMBER AND MUST EXTEND TO THE BOTTOM OF THE FOOTING, LAMINATE MAY BE SPLICED ABOVE MID HEIGHT OF COLUMN 8 - 16d NAILS V N TREATED POST 2' X 4' BACKER REQ'D @ 48' O.C. FOR BAYS LARGER THAN 11' - 16d GALV, NAILS EACH GIRT X 6' FLAT GIRT@ 24' 0, C. FDR 8', 10' & 11' BAYS TYPICAL GIRT CONNECTION GABLE END TRUSS 2' X 6' X 18' BOLTING BLOCK 2' X 6' X 18' BOLTING BLOCK 8 - 16d NAILS CORNER POST DETAIL 3 8 16d NAILS TYP, GABLE END TRUSS CONNECTION USE BOLTING BLOCKS BELOW ALL CORNER COLUMN GIRTS WAMBEKE ENGINEERING Daniel Vanbekr,•P, E. io"xw sx'9 A TW e09-4435 mai +09-l4& .-011 dineiberlg w,[ GIRT CONNECTIONS, GABLE END TRUSS CONNECTION & POST LAMINATION DETAILS STANDARD POST FRAME BUILDING PLANS LIEGLLR LUMBER COMPANY 620 EAST HOLLAND SPOKAIgF. WA 99218 DRAW BY DATE WAMBEKE -24-0B AP ?RINE]) SCALE NTS IBC15 sittire ALTERNATE TRUSS WFB BRACING SYSTEM INTERIOR OR GAR' F FNf) TRUSSES_ Od NAILS @ 6' O.C. ' X 6' OR 2' X 8' L—BRACE Od NAILS @ 6' O.C. X 4' L—BRACE TRUSS WEB MEMBER ' TRUSS WEB MEMBER SECTION R -B SECTION R -R AT INTERIOR TRUSSES AT GABLE END TRUSS NOTE! TRUSS DIAGRAMS WILL OFTEN REQUIRE WEB MEMBER BRACING, WHICH IS SHOWN ON TRUSS DRAWINGS ASCSI THE METHOD OF TRUSS WEB BRACING SHOWN ABOVE REPLACES' 1' X 4' OR 2' X 4' WEB MEMBER BRACING. FOLLOW THESE INSTRUCTIONS FOR ALL WEB MEMBER BRACING TO REPLACE 'RAT—RUN' WEB WAMBEKE ENGINEEFUNG Bnnlel Wnmbeke, P E. mar gstfl 1 ia4 !C9113-6106 rpm. 909-140-6501 a -,a y!V^MN,Mancen TRUSS WEB MEMBER BRACING ALTERNATIVE TYPICAL POST FRAME BUILDINGS LIEULLR LUMBER COMPANY 620 EAST HOLLAND SPOKAN F. WA 99218 DRAWN er DATE WAMBEKE —24-08 APPROVED SCALE NTS IBCI6 Co /'I, »lt r'0 :I 1 NOTE: THIS BUILDING DOES NOT REQUIRE KNEE BRACES DETAIL 1 — TRUSS COLUMN CONNECTION, PURLIN SUPPORT AT EAVE OVERHANG KTs. NOTES FOR CONNECTION DFTAII ®MANUFACTURED TRUSS TOP CHORDS TRUSS DESIGN BY TRUSS MANUFACTURER PURLIN SUPPORT STRUT 2' X 6' X FULL DEPTH OF TOP CHORD PLUS PURLIN NAIL PURLINS 14/(3) I6d NAILS NAIL STRUT TO TOP CHORD W/(3) 16d NAILS EACH SIDE. ® MANUFACTURED TRUSS - BOLT TO POST WITH 3/4'0 MACHINE HOLT ON TOP OF NAILING BLOCK ®WOOD POST, SEE PLAN VIEW ®4 - 10d NAILS geSOLID BLOCKING AT CONNECTION POINTS TYP. PURLIN, 2' X 9' DF -1. 112 B 12' 0. C. ID 2' X 0' SAVE GIRT 0 KNEE BRACES NOT REQUIRED S2' X 6' X 24' BLOCK 1 - 3/4' 0 MACHINE BOLT THRU 1 - 3/4' 0 MACHINE BOLT THRU I - 3/4' 0 MACHINE BOLT THRU 3 - 3/44' 0 M. BOLT 2 BOLTING 4 - 3/4' 0 N. BOLT B BOLTING 5 - 3/4' 0 M. BOLT H BOLTING 0 4 - 16d NAILS 3/4.0 MACHINE BOLT PURLIN CONNECTION METHODS, A), PURLINS MAY BE HUNG OFF THE TRUSS TOP CHORD FACES W/ STD. SIMPSON JOIST HANGERS OR EQUAL, H). PURLINS MAY DE BUTTED AND NAILED W/(2) 1641 NAILS INTO EACH PURLIN. G. PURLINS MAY BE LAPPED ANDNAILED W/(3) 16dNAILS. ON CONNECTION METHODS 'B' AND 'C', TOENAIL BACK SIDE OF PURLIN W/(1) 16d NAIL INTO EACH TOP CHORD MEMBER TRUSS T. CHORD KNEE BRACE BOLTING BLOCK BLOCK - 24' L 30' BLOCK - 36' U 40' BLOCK - 30' BLOCK - 60' WAMBEKE ENGINEERINGm� u.5 Oanlet Wambeke. P. E, boNv.e`)(q 94eC 09-411-6185 Fox O9- e2 'Seim HA G FO POST FRAME BUILDINGS LILULLH LUML3LH LUMPANY 620 EAST HOLLAND SPOKA F WA 9991R v AWN BY OATC WAMBEKE -24-0E APPROVED SCALE 3n6' • 19-0• EAVE.OVERHANG 8', 10' OR 12' POST SPACING 8', 10' OR 12' POST SPACING WALL SECTION SPECIFICATION NOTES FOR COMMERCIAL WALL FRAMING SI S2 S3 S4 METAL ROOFING OVER METAL BUILDING INSULATION 2' X6'OR2' X 8' PURLINS@ • MANUF._AC (RED TRUSSES is 2' X *> 2' X 8' BLOCKING NAIL BLOCKING TO POSTS W/ 2'X'6'OR2'X8'GIRTS @ POST`S; AND BLOCKING WA <3) METAL SIDING. PRESSURE TREATED 2' )i 6' PRESSURE TREATED 2' X: 4' B 24' O.C. TWEEN GIRTS. )6d NAILS. :TLC. TOENAIL TO I:14AILS. SE GIRT WALL FRAMING PLAN 4' THICK CONCRETE SLAB. CONCRETE POST FOOTING PRESSURE TREATED POST 2' X 6' OR 2' X 8' STAGGERED BLOCKING @ MIDSPAN DF GIRTS. END NAIL TO GIRTS W/ (2) 16d NAILS. 2 X 6 OR 2 X 8 WINDOW SILL 2 X 6 OR 2 X 8 BLOCKING BELOW EACH SIDE OF WINDOW 2 X 6 CEILING JOISTS - INSTALL. WITH JOIST HANGERS - OPTIONAL NOTES: I. BUILDING SPECIFICATIONS ON BASIC POST FRAME BUILDING PLANS APPLY TO THIS ADDENDUM. 2. 2' X 8' GIRTS MAY BE SUBSTITUTED FOR 2' X 6' GIRTS TO OBTAIN THE DESIRED WALL THICKNESS, BUT ARE NOT REQUIRED FOR STRUCTURAL INTEGRITY. WAMBEKE ENGINEERING Daniel Wanbeke, P. E. 25913 cost 61st 9223 p3Eos 61 99223 Tel 509-443-6106 fora 509-448-6582 a not d.onbekeensnwn COMMERCIAL WALL FRAMING ADDENDUM TO STANDARD POST FRAME BUILDING PLANS ZIEGLER LUMBER COMPANY 620 E. HOLLAND SPOKANE, WASHINGTON 99218 DRAWN BY DATE DNAV1116 NU: ZIEGLER.000O AMBE01 2004 SCALE: NT. 5.- TetLI. 1 fi- 1 NEv. 0 SS II II 11 II _ I S4 0 II D IIIIIW 1 I II 11 I I� I I 1 1 I` : �m ,. ,�, WALL SECTION SPECIFICATION NOTES FOR COMMERCIAL WALL FRAMING SI S2 S3 S4 METAL ROOFING OVER METAL BUILDING INSULATION 2' X6'OR2' X 8' PURLINS@ • MANUF._AC (RED TRUSSES is 2' X *> 2' X 8' BLOCKING NAIL BLOCKING TO POSTS W/ 2'X'6'OR2'X8'GIRTS @ POST`S; AND BLOCKING WA <3) METAL SIDING. PRESSURE TREATED 2' )i 6' PRESSURE TREATED 2' X: 4' B 24' O.C. TWEEN GIRTS. )6d NAILS. :TLC. TOENAIL TO I:14AILS. SE GIRT WALL FRAMING PLAN 4' THICK CONCRETE SLAB. CONCRETE POST FOOTING PRESSURE TREATED POST 2' X 6' OR 2' X 8' STAGGERED BLOCKING @ MIDSPAN DF GIRTS. END NAIL TO GIRTS W/ (2) 16d NAILS. 2 X 6 OR 2 X 8 WINDOW SILL 2 X 6 OR 2 X 8 BLOCKING BELOW EACH SIDE OF WINDOW 2 X 6 CEILING JOISTS - INSTALL. WITH JOIST HANGERS - OPTIONAL NOTES: I. BUILDING SPECIFICATIONS ON BASIC POST FRAME BUILDING PLANS APPLY TO THIS ADDENDUM. 2. 2' X 8' GIRTS MAY BE SUBSTITUTED FOR 2' X 6' GIRTS TO OBTAIN THE DESIRED WALL THICKNESS, BUT ARE NOT REQUIRED FOR STRUCTURAL INTEGRITY. WAMBEKE ENGINEERING Daniel Wanbeke, P. E. 25913 cost 61st 9223 p3Eos 61 99223 Tel 509-443-6106 fora 509-448-6582 a not d.onbekeensnwn COMMERCIAL WALL FRAMING ADDENDUM TO STANDARD POST FRAME BUILDING PLANS ZIEGLER LUMBER COMPANY 620 E. HOLLAND SPOKANE, WASHINGTON 99218 DRAWN BY DATE DNAV1116 NU: ZIEGLER.000O AMBE01 2004 SCALE: NT. 5.- TetLI. 1 fi- 1 NEv. FILE