2009, 10-19 Permit App: 09003333 Pole BldgProject Number: 09003333 l nv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/19/2009 Page 1 of 2
Project Information:
Permit Use: 30 X 40 POLE BLDG W/ 12 X 40 CARPORT Contact: BUNKER STEEL BLDGS INC
Address: 1028 W ROSEWOOD AVE
C - S - Z: SPOKANE WA 99208
Setbacks: Front Left: Right: Rear: Phone: (509) 468-8182
Group Name:
Site Information: Project Name:
Plat Key: 002085 Name: PONDEROSA ACRES 0311D ADD District: Sout
Parcel Number: 44051.0807 Block:
SiteAddress: 10202 E 48TH AVE
Location:: CSV
Lot:
Owner: Name: MORRIS, JOHN & PAMELA
Address: 10202 E 48TH AVE
SPOKANE, WA 99206-9281
Zoning: R-1 SF Res Estate District
Water District: 100 SPO CO WATER DIST/OA Hold: 0
Area: 43,559 Sq Ft Width: 133 Depth: 326 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Septic Sys Review
Originally Released: 10/15/2009 By: tmelbourn
Originally Released: 10/16/2009 By: pwarne
Landuse/Zoning/HE Conditions
Permits:
Originally Released: 10/15/2009 By: mpalaniuk
Operator: JD Printed By: JD Print Date: 10/19/2009
Project Number: 09003333 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/19/2009 Page 2 of 2
Contractor: BUNKER STEEL BUILDINGS
Address: 1028 W ROSEWOOD
SPOKANE, WA
Description Grp Type Notes
CARPORT OP R-3 VB
POLEBDLG U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
W§BCC SURCHARGE
Building Permit
Firm: BUNKER STEEL BUILDINGS
Phone: (509) 468-8182
This Application: Total Project:
Sq Ft Valuation So Ft Valuation
480 $7,200.00 480 $7,200.00
1,200 $22,800.00 1,200 $22,800.00
Totals: 1,680 $30,000.00 1,680 $30,000.00
Units Unit Desc Fee Amount
1 SELECT $441.75
1 SELECT $110.44
1 SELECT $4.50
Permit Total Fees:
$556.69
Notes:
Payment Summary:
Pe nit Tvve Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $556.69 $556.69 $115.49 $441.20
$556.69 $556.69 $115.49 $441.20
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD
Print Date: 10/19/2009
'TA Permit Center
`okane 11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
.000ValleyN (509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction
Permit Application
PERMIT NUMBER:
PERMI"I' FEE:
New Construction (�v Accesso Bldg
Addition/Remodel
Deck Other:
SITE ADDRESS: ( O ZO )"" E l ti
ASSESSORS PARCEL NO: / j` t D S 1• O 7 LEGAL DESCRIPTION:
BO{ iding;Owner:
3d u SSION :' 1 X y J
Name:
Name: J,, L� iflAo rr-3
Address: to)3 t,.v ( Sr.
2"" FLOC, SQ. FTG:
Address: 5 ME
01
Phone: 4.1 t;l;," .1 9 „�,. Fax: 968 .. a
City;
State:
Zip:
Phone: CkZ Q _ -7 S' '1
Fax:
# OF BEDROOMS:
Name: .._;��t�
Phone: 4'1 S -
Describe the scope of work in detail:
Contractor t�3 t,,,, S4(314,5s X.N‹
3d u SSION :' 1 X y J
Name:
TOTAL HABITABLE SPACE:
Address: to)3 t,.v ( Sr.
2"" FLOC, SQ. FTG:
City: t4,4+e State: ft. Zip: cri
01
Phone: 4.1 t;l;," .1 9 „�,. Fax: 968 .. a
FINISHED BASEMENT,
SQ. FTG: ----.---
Contractor Lic No: r,4., tog r •3513 E i /c: '
DECK/COV. PATIO SQ. FTG:
City Business Lic. No: tc)0 2 ifs' 1 30 5
PROPER
Cost of Project: $
a3,695 --
0_3o x 40" 'i Ev`�I.sc) 43' 0 Pe 3
Proposed Use: 0,-1 lc 1403
**************The following MUST be complete: (write N/A if not **********************
applicable )
HEIGHT TO PEAK: l�
3d u SSION :' 1 X y J
# OF STORIES: )
TOTAL HABITABLE SPACE:
IN
MAFLOOR TO SQ.
FTG:
2"" FLOC, SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
—
FINISHED BASEMENT,
SQ. FTG: ----.---
GARAGE SQ, F`TG:
/ - DO P.4 - /%40
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPER
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER R SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that:
dwelling is/will be served by potable water. 2) Ownership of this City of
signatory is the property owner or has permission to represent the proper
in full compliance with the City of Spokane Valley Development Code
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is
local laws, codes or ordinances. 6) Plans or additional information may lot
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash ❑ Check ❑ Mastercard
Bankcard #: Expires:
Authorized Signature:
) Ai/6) y
9P(/),.‘
1-7-'�r'fFi,► Ti tit
Effective 10-28
Page 1 of 1
http://www.spokanevalley.org/uploads/Community Develonment/Documents/Forms/Ruildino/Residential Rnilriino Pprmit Ann int,
ling, the
3) The
be done
City of
state or
d before
TER
rte_
�Ualley'
For City Use Only
PLUS Project Number_ei r 2,
Project Address
t b7
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is \-0 c
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
D Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
D Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
3oik4. MQc.c-N 5
�oz�Z L+8
tkci
L4L-ist o
PLANNING DEPT. APPROVED
BY: jaraL,;(--
DATE: /0//6/2009
01,
`q n
i
j X53'
RECEIVED
CSV PERMIT CENTER
OCT 1 if 2009
roject #...
ame _��-
:bnittal ;�