2009, 02-13 Permit: 09000241 Pole Bldg1
i
• aT:.
Spokane
BUILDING DIVISION
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Site Information Project Information
Site Address: 10210 E 48TH AVE
Parcel Number: 44051.0808
Subdivision:
Block: Lot:
Zoning: R-1 SF Res Estate District
Owner: JACKSON, RUSTY E & DEBRA L
Address: 10210 E 48TH AVE
SPOKANE, WA 99206
Building Inspector: SOUTH
Water Dist: SPO CO WATER DIST#3B
Project Number: 09000241 Inv: 1 Issue Date: 02/13/2009
Permit Use: 30 X 40 POLE BLDG
Applicant: STEEL STRUCTURES OF AMERICA
PO BOX 895
POST FALLS ID 83877 Phone: (208) 777-8597
Contact: STEEL STRUCTURES OF AMERICA
PO BOX 895
POST FALLS ID 83877 Phone: (208) 777-8597
Setbacks - Front: Left: Right:
Group Name:
Project Name:
Rear:
Permits
Buildirrr Perinit
Contractor: STEEL STRUCTURES AMERICA INC
POLE BDLG U -I VB 1,200
Total Value: $22,800.00
FOR BUILDING INSPECTIONS CALL (509) 688-0054.
License #: STEELSA044BD
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
$363.25
$90.81
$4.50
Total Permit Fee: $458.56
Payment Summary
Total Fees AmountPaid AmountOwing
S458.56 $458.56 $0.00
Tran Date
02/13/2009
Receipt #
17223
Payment Amt
S458.56
1
Notes / Conditions of Approval
All residential driveways and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks, or
other equivalent hard surface material.
This permit is granted based on the structure not being used for storage of on -street vehicles. Should the use of the structure be
used for that purpose, the driveway will need to be paved and approved by the City of Spokane Valley.
Processed By: DAVIS. JENNA
Printed By: PATRICIA PRINCE Page 1 of 1
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where Inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the Dwner's/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering, and final.
MECHANICAL - rough -in of piping, before covering. metal chimneys before concealment, and final.
FRAMING - after all framing, bradng and blocking is in place, rough electrical, plumbing and mechanical systems are complete. and prior to
concealing.
FINAL -when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this Inspection includes review of site Improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants. fire department access,
on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting. etc. installed and prior to occupancy,
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above. any plumbing or mechanical systems or material which would be concealed by framing, drywall. concrete, etc. must
be inspected prior to cover. Check with the Building department for "special Inspections" In conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Pemsls end inspecllpns for elec5CG wlrtng, Stale Department of Labor
And lndu,Ines 324.2640
Pewits end inspections Icy on-site septic systems, Spokane Reglnvl
Health O sIncl 924-1560
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 588-0195 or State Dept of Transportation
324-6000
Perms and lmpedions for Sewer Connection, Spokane county Utilities Divining
477-3604
Eve spanker and alarm systems and pnvala access road inspections, Spokane valley
Fire Department 892-4122
Stale law RCW 19.122 requires Mat pilar to any excavation !he 'CALL BEFORE YOU DIG' center must be noticed. Call before you dig al least 2 working days In advance. 456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a penult, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit Issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish Me original permit.
All refund requests must be made In writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent
Date nC Ir 3 loci
Staff Approval Date