Loading...
2009, 02-13 Permit App: 09000241 Pole BldgProject Number: 09000241 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Date: 2/13/2009 Page 1 of 2 Peruut Use: 30 X 40 POLE BLDG Contact: STEEL STRUCTURES OF AMERICA Address: PO BOX 895 C - S - Z: POST FALLS ID 53877 Setbacks: Front Left: Right: Rear: Phone: (208) 777-8597 Group Name: Site Information: Project Name: Plat Key: Name: Range District: Sout Parcel Number: 44051.0808 Block: Lot: SiteAddress: 10210 E 48T12 AVE Owner: Name: JACKSON, RUSTY E & DEBRA L Address: 10210 E 48TH AVE Location:: CSV SPOKANE, WA 99206 Zoning: R-1 SF Res Estate District Water District: 101 SPO CO WATER DIST#3B Hold: ❑ Area: 43,559 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Septic Sys Review Originally Released: 2/6/2009 By: TMELBOU Released By:.s, r„ Originally Released: 2/13/2009 By: Ihalsey Landuse/Zoning/HE Conditions See Conditions Originally Released: 2/5/2009 By: mbasinger Permits: Operator: .D Printed By: jmm Print Date: 2/13/2009 Project Number: 09000241 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/13/2009 Contractor: STEEL STRUCTURES AMERICA Address: PO BOX 895 POST FALLS, ID 83854 Description Grp Type POLE BDLG U -t VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Notes Building Permit Finn: Phone Page 2 of 2 STEEL STRUCTURES AMERICA I (800) 833-9997 This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 1,200 $22,800.00 1,200 $22,800.00 Totals: 1,200 $22,800.00 1,200 $22,800.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $36325 $90.81 $4.50 $458.56 Notes: All residential driveways and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks, or other equivalent hard surface material. This permit is granted based on the structure not being used for storage of on -street vehicles. Should the use of the structure be used for that purpose, the driveway will need to be paved and approved by the City of Spokane Valley. Payment Summary: Permit Time Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $458.56 $458.56 $0.00 $458.56 $458.56 $458.56 $0.00 $458.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that an provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 2/13/2009 Permit Center Nlakane 11707 E Sprague Ave, Suite 106 40000 Valley Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 Community Development www.spokanevallev.org.com Residential Construction Permit Application PERMIT NUMBER: g - Zc,G/ PERMIT FEE: New Construction o Addition/Remodel o Other: 4ccessory Bldg ❑ Deck SITE ADDRESS I Lam? F , citc3 - ASSESSORS PARCEL NO / -OD1, LEGAL DESCRIPTION: Building owner Named -b-i_r s: PMP v -i C Name: 2_,,,..k —vactscs1 Ci:-4—i /:, ZiP: ( 7 7 Address: J / E . L--) 42_, cit*this4. dci Zip: FINISHED BASEMENT SQ. FTG: Phone: c Fax: # OF BEDROOMS:ONS rucr•I �Ineco -Con fgctPerson Name: tNon►n,Q. Al Phone:l n-ec 959-7 Describe the scope of work in detail: ^, t .Contractor Named -b-i_r s: PMP v -i C Address jam_ () - t&(9 Ci:-4—i /:, ZiP: ( 7 7 Pho> -8 -7997Fa 67-8g7G LEAreEtsAnqqAftxp. Date: r / t/ '19/ City Business Lic No: Cost of Project: l S Q� **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: X / # OF STORIES: r TO IALHABITABLE SPACE: Prr MAIN FLOOR TO SQ. FTG: 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: / c CDC) n /� DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS:ONS rucr•I �Ineco RUCTION TYPE: (-IC1SZy41i_\ HEAT SOURCE: NA- S WER QR SEPTIC? ev-.( U The permitee verifies, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can •r, ed. Signature Date Method of Payment: (Faxed permit applications will only be accepted with major bankcard) 0 Cash 0 Check ❑ Mastercard 0 VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 8/25/2005 46)OS REQ ti►�� By CITY OFSPOKANE VALLEY FEB 05 2009 PERMIT NTER BY Spokane .,,.'Valley 11707 E Sbrague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1001 • Fax: 509.921.1008 $ cityhall@spokanevaney.org Residential Plan Submittal Minimums Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor / information, signature, and date. ta' Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. /Show the height of any proposed buildings or accessory structures. VFloor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and ' arage on plans) Show each level of existing house and square footagejf any additions. / tY All braced wall panel types: show locationsland details of installation, including engineered design. ,t " Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. N-titt Smoke detector locations c 22" X 30" attic access location l OK 18° X 24" crawl space access: IS{ One-hour separation detail: between house and garage Floor framing details: Joist type, size, spacing and installation details 11" Roof framing plan and details Furnace and hot water heater location. 1 II header locations:type, size, and connections • • Foundation plan •14.< Insulation information For City Use Only PLUS Project Number OclQ Cr" LLQ I Project Address Spokane jUalley 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is r� 1 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 THYSSENKRUPP ELEVATO 5095331811 C; —I ••••••). a Palma Aaa6014 STE014Tma r. 4/8 Atli; I 44 076( 24 2Ho Irv) %.11 • PLANNING DEPT. APPROVED •BY: irkti DATE: 1/5(0'?