Loading...
2008, 06-30 Permit App: 08002437 DeckProject Number: 08002437 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/30/2008 Page I of 2 Project information: Permit Use: NEW DECK Contact: BATES. RICHARD F & ANDREA L Address: 10215 E 48TH AVE C - S - Z: SPOKANE, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 228-9426 Group Name: Project Name: Site Information: Plat Key: 002080 Name: PONDEROSA ACRES OIST District: Sout Parcel Number: 44051.0301 Block: Lot: SiteAddress: 10215 E 48TH AVE Owner: Name: BATES. RICHARD F & ANDREA L Address: 10215 E 48TH AVE SPOKANE, WA 99206 Location:: CSV Zoning: A/R Water District: Arterial/Road Overlay Hold: ❑ Area: 98,652 Sq Ft Width: 162 Depth: 810 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Septic Sys Review Originally Released: 6/30/2008 By: tmelbourn Originally Released: 6/30/2008 By: LHALSEY Landuse/Zoning/HE Conditions Permits: leased:By: Originally Released: 6/26/2008 By: mpalaniuk Operator: JD Printed By: jmm Print Date: 6/30/2008 Project Number: 08002437 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/30/2008 Page 2 of 2 Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation DECK OPEN R-3 VB 380 $5,700.00 380 $5,700.00 Totals: 380 $5,700.00 380 $5,700.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $125.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW <7999 SQ FT 1 SELECT $50.10 Notes: Permit Total Fees: $179.85 Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $179.85 $179.85 $0.00 $179.85 $179.85 $179.85 $0.00 $179.85 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and fords the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 6/30/2008 Spokane (Staff Use Only) PERMIT NUMBER: 17-1437 PERMIT FEE: CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 perrnacer ter2spokanevallex:org RESIDENTIAL CONSTRUCTION PERMIT APPLICATION 0 NEW CRUCTION 0 ADDITION/REMODEL 0 ACCESSORY BUILDING DECK OTHER SITE ADDRESS: 10215 E 48Th AVENUE SPOKANE VALLEY, WA, 99206 ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME: ANDREA & RICK BATES ADDRESS: 10215 E 48TH AVENUE CITY: SPOKANE VALLEY PHONE:509-228-9426 CONTACT NAME: STATE:WA FAx:206-600-5527 ZIP:99206 cELL:509-251-1372 PHONE: FAX: CELL: CONTRACTOR NAME: MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: DIG FOOTINGS FOR DECK FOUNDATION BUILD FRAMING WITH PRESSURE TREATED LUMBER ADD DECKING, MAIN LEVEL IS 20" ABOVE GRADE, 2ND LANDING IS 52" ABOVE GRADE BUILD STAIRS BETWEEN NEW DECK AND EXISTING DECK (105" HIGH), ADD RAILING TO STAIRS AND LANDING PROPOSED USE: RECREATIONAL RECEIVED E3Y CITY OF SPOKANE VALLEY JUN 25 2008 PERMIT 61N FI -k Effective October 28, 2007 BY: ge 1 of 2 C:\Documents and Settings\Rick\My Documents\Spokane house projects\Deck\Residential Constructermi p�Sl.doc Height to Peak:NA Main Floor SQ FT:NA Garage SQ FT:NA No. of Bedrooms:NA ****YOU MUST COMPLETE THE FOLLOWING**** MARK N A IF NOT APPLI ABLE No. of Stories:NA Dimensions:205(20' Upper Floor SQ FT:NA Deck/Covered Patio SQ FT:380 Q (% Construction Type:NA TOTAL COST OF PROJECT: $2000 Unfinished Basement SQ FT:NA Impervious Surface Area: NA Heat Source:NA Total Habitable Space:NA Finished Basement SQ FT:NA 30% Slopes on Property:NA Sewer or Septic:NA DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of iSpokane VanformationImaypbe equiredtta o ber pemit or approval for any d and subsequently ation of federal, state or local approved before this application can ancodes or ordinances. 6) Plans or additional be processed. Date: ' > - 0 3 Signature --7 Method of payment: 0 Cash 0 Check Bankcard #: 0 Visa 0 Mastercard EXP: VIN#: Authorized Signature: Page 2 of 2 Effective October 28, 2007 C:\Documents and Settings\Rick\My Documents\Spokane house projects\Deck\Residential Construction Permit App.1. oc (0 i5 (5° r � iri dp ir„.19 3.195 PLANNING DEPT. AP ROV BY: e ,/► DATE: (,lz4' /w 5 9t, 12 Lev' .V L. ,2i (ficI2-0 oz � 1%->-'51.'--3 Re, oc- ter (O5 Leggy Ave- wife - 0� CA -A-1 21 C. Spokane jUalley For City Use Only PLUS Project Numbetn5bCn74-7 l Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org As of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is � 4 \CA The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. • Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK - BUILDING FILE REV 9/07 Bates residence deck project - Framing 10215 E 48th Ave, Spokane Valley, WA 99206 6/24/2008 page 2 I Scale: 3/16" = 1'-0" assumptions: - sandy soil will support 2000 lbs/sq foot - 24" round footing will support 6200 lbs - 20" round footing will support 4300 lbs - 12" round footing will support 1500 lbs design load = 60 lbs/ sq foot red area = 85 sq feet (5100 lbs) yellow area = 30 sq feet (1800 lbs) green area = 26 sq feet (1560 lbs) decking is 4/4x6 IPE joist spacing is 16" O.C. decking span @45 degrees is 22.6" spanning specs for 4/4x6 is 28" @ 60psf double 2x10 beams pressure treated wood 2x8 joists pressure treated wood O 24" footing 20" footing 12" footing max deck height = 105" existing 4x6 — — beam max deck • height = 20" 9 CO fig 5.-7.. 20'-O 8'.6" re r 1/, 6'-101/4" landing 5'-O" max deck height = 52" $'-9" existing 4x4 post existing slab existing deck «` Bates residence deck project - elevation 10215 E 48th Ave, Spokane Valley, WA 99206 6/24/2008 page 4 I Scale: 1/4"=1'-0" existing deck 4 - 2x10 stringers bolted to existing 4x8 Joist and notched over 4x6 beam blacking 8 metal strapping added where needed pI' �past and footing added metal rail system with glass panels to stiffen stringers 8 and metal beaters distribute load metal "L" brackets attach stringers to beam metal "L" brackets attach stair treads to outside stringers ' � I•I\ metal "1" brackets attach strip ers to g decking T 6" step 1-707/8" a A as • existing slab double 2x10 flush beam double 2x10 Hush beam "BigFoot" concrete footing system /20.0In.j 0(1 J Bates residence deck project - overview 10215 E 48th Ave, Spokane Valley, WA 99206 6/24/2008 page 1 Scale: 3/16" = 1'-0" 4/4x6 IPE deck boards run on diagonal lower deck = 340 sq feet landing = 40 sq feet stairs = 65 sq feet total = 445 sq feet 5'-r" 0 0 existing deck attached to house hates residence deck project - Framing 10215 E 48th Ave, Spokane Valley, WA 99206 6/24/2008 page 2 I Scale: 3/16" = 11-0" assumptions: - sandy soil will support 2000 lbs/sq foot - 24" round footing will support 6200 lbs - 20" round footing will support 4300 lbs - 12" round footing will support 1500 lbs design load = 60 lbs/ sq foot red area = 85 sq feet (5100 lbs) yellow area = 30 sq feet (1800 lbs) green area = 26 sq feet (1560 lbs) decking is 4/4x6 IPE joist spacing is 16" O.C. decking span ©45 degrees is 22.6" spanning specs for 4/4x6 is 28" © 60psf double 2x10 beams pressure treated wood 2x8 joists pressure treated wood • 24" footing 0 20" footing 12" footing max deck height = 105" existing 4x6 beam max deck height = 20" v d0 8 6' It max deck height = 52" $'-9" -- existing 4x4 post ip existing slab 9 m existing deck Bates residence deck project -footings detail 110215 E 48th Ave, Spokane Valley, WA 99206 6/24/2008 -- _-- . — --- -- page 3 l Scale: 1" = 1'-0" double 2x10 beam 2x8 joist joist hanger N 2x8 joist 6x6 post 10" sonotube 24.0In. 24" round footing grade 2x8 joist joist hanger N top double 2x10 flush beam double 2x10 flush beam 6x6 post 20" round footing PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS SVOkan REVIEWED FOR CCD COMPLIANCE SPOKANE VALLEY BU DIN DIVISION t to !3e! 6