Loading...
2004, 12-07 Permit: 04009293 Gas PipingSpokane . 'Valley BUILDING DIVISION 11707 E Sprague Avenue Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 10215 E 48TH AVE Parcel Number: 45144.2340 Subdivision: Block: Lot: Zoning: UR -1 Urban Residential -1 Owner. BATES, RICK Address: 10215 E 48TH AVE SPOKANE, WA 99206 Building Inspector. Water Dist: Project Number 04009293 Inv: 1 Issue Date: 12/07/2004 Permit Use: 1 GAS PIPING -UNDERGROUND Applicant: HIIRLIMAN HEATING 515 S DISHMAN RD SPOKANE WA 999206 Contact: HURLIMAN HEATING 515 S DISHMAN RD SPOKANE WA 999206 Phone: (509)891-5110 Phone: (509)891-5110 Setbacks - Front: LeR: Right: Rear. Group Name: Project Name: Permits Mechanical Permit Contractor: HURUMAN HEATING & ASC INC License #: HURLIHA051D4 GAS PIPING FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. $1.00 PROCESSING FEE Total Permit Fee: $35.00 536.00 Payment Summary 'Dotal Fees $36.00 AmountPaid AmountOwinp $36.00 $0.00 Processed By: DOMPIER, DAWN Printed By: MIKE TURBAK Tran Date 12/072004 Page 1 of 1 Receipt# 6062 Payment Amt $36.00 PERMIT NOTICE A Spokane Wiley Development Permit belongs to the land owner. The permit applicant, by definition. Is the property owner or an authorized agent of the properly owner. It is the responsibility of the permit owner that the use riessnrIbelon the front of this penult complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the permit owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, Including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions fes solely with the pernittee-neither the City of Spokane Wiley nor its authorized representatives assume any responsibility for te verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly lthe structure may require its relocation at the owner s/pernitlee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. SUB SLAB/RADON SYSTEM/ PLUMBING - after rough -In with appropriate test and before covering. MECHANICAL - rough -In of piping (with test), before covering, metal chimneys before concealment, and final. PLUMBING - ROUGH IN -when supply and drain piping have been Installed, before concealment and with appropriate test. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. INSULATION - prior to the installation of drywall. FINAL- when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection Includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permiL Items such as the Installation of fire hydrants, fire department access, on site drainage (208' swales), road Improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final Inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall. concrete, etc. must be Inspected prior to cover. Check with the Building department for 'special Inspections in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require perrnits and Inspections from more than one agency. • Building, plumbing (Includes Interior reversals for sewer) and • Road cuts for utilities or driveways, City of Spokane Wiley Mechanical, City af Spokane Valley Building Division Public Works 869-5373 or State Department of Transportation 688-0054 324-6000 • Permits and inspections for electrical wiring, State Department • Permits and Inspections for sewer connection, Spokane County of Labor and Industries 324-2640 Utilities Division 477-3604 • Permits and inspections for on-site septic systems, Spokane • Fire Sprinkler and alarm system> and private access road Regional Health District 324-1560 Inspection, Spokane Valley Fire District 928-1700 State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call before you dig at least 2 working days in advance. 456-8000. FLOODPLAIN DEVELOPMENT. All Development within a designated Floodplain located in the City of Spokane Valley jurisdiction shall comply with Article III of the Spokane Valley Uniform Development Code. PERMIT FEES, EXPIRATION AND REFUNDS All City of Spokane Vafley permit fees shall be established by a City of Spokane Valley Resolution and may be found in Appendix B. Schedule C of the Spokane Valley Uniform Development Code. Copies of these documents can be obtained on the CiVs website (www.spokanevalley.org) or within the City of Spokane Valley's Permit Center. All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit Issuance, regardless of whether the work is finished. If a permit pa expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 10D% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee pald may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. REFERENCED CODES AND APPEALS All referenced construction codes are available for review at the City of Spokane Valley Permit Center. Compliance with construction codes is mandated in the City of Spokane Valley. Any questions, disagreements or disputes generated as a result of city staff decisions shall be directed to the City Building Official. If the issue remains unresolved, further appeal shall be in compliance with the City of Spokane Valley Unifomr Development Code Section 1.20.39.B.