2013, 09-27 Permit: SW-13001696 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001696 Permit Issued Date: 09/27/2013
Expiration Date: 09/27/2014
Project Description: SEWER CONNECTION
Project Name: W PONDEROSA
Primary Contact ACME EXCVT & SEWER BORING CO
Phone: (509)228-0691
Applicant: ACME EXCVT & SEWER BORING CO
Address: 6808 S. LINKE RD.
GREENACRES, WA 99016
Phone: (509)228-0691
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
10206 E 44TH AVE
44051.9024
Owner: MORTIMER, J W
Address: 10206 E 44TH AVE
SPOKANE, WA 99206-9264
Phone:
Assessor's Description: 05-24-44 PIN OF GOVT LTS 2 & 6 DAF: BEG Email:
AT NW COR LT 2 TH SOODEG05MINW ALG W LN
OF GOVT LTS 2 & 6 640.90FT TH
S89DEG57MINE 565.40FT TO TRUE POB TH
CONT S89DEG57MINE 135.23FT TH NOODEG
Inspection Area: : (509)-477-3675
Water District: Spokane County Water Fire District: Fire District 8
District #3
Zoning: Lend Area: 2.42 Acre(s)
CONTRACTOR INFORMATION
ACMEEES963LD, Exp. 06/04/2014
ACME EXCVT & SEWER BORING CO
6808 S. LINKE RD. GREENACRES, WA 99016
(509)228-0691
DETAILS'
Class
SEWER
Type
Quantity Unit Charge Value
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS'
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 09/27/2013 09:47:41 Project Coordinator: Dawn Dampier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001696 Permit Issued Date: 09/27/2013
Expiration Date: 09/27/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 09/27/2013 09:47:41 Project Coordinator. Dawn Dampier