Loading...
2013, 09-27 Permit: SW-13001696 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001696 Permit Issued Date: 09/27/2013 Expiration Date: 09/27/2014 Project Description: SEWER CONNECTION Project Name: W PONDEROSA Primary Contact ACME EXCVT & SEWER BORING CO Phone: (509)228-0691 Applicant: ACME EXCVT & SEWER BORING CO Address: 6808 S. LINKE RD. GREENACRES, WA 99016 Phone: (509)228-0691 Email: SITE INFORMATION: Site Address: Parcel Number: 10206 E 44TH AVE 44051.9024 Owner: MORTIMER, J W Address: 10206 E 44TH AVE SPOKANE, WA 99206-9264 Phone: Assessor's Description: 05-24-44 PIN OF GOVT LTS 2 & 6 DAF: BEG Email: AT NW COR LT 2 TH SOODEG05MINW ALG W LN OF GOVT LTS 2 & 6 640.90FT TH S89DEG57MINE 565.40FT TO TRUE POB TH CONT S89DEG57MINE 135.23FT TH NOODEG Inspection Area: : (509)-477-3675 Water District: Spokane County Water Fire District: Fire District 8 District #3 Zoning: Lend Area: 2.42 Acre(s) CONTRACTOR INFORMATION ACMEEES963LD, Exp. 06/04/2014 ACME EXCVT & SEWER BORING CO 6808 S. LINKE RD. GREENACRES, WA 99016 (509)228-0691 DETAILS' Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS' Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 09/27/2013 09:47:41 Project Coordinator: Dawn Dampier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001696 Permit Issued Date: 09/27/2013 Expiration Date: 09/27/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/27/2013 09:47:41 Project Coordinator. Dawn Dampier