Loading...
2013, 01-28 Permit: SW-13000039 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -13000039 Permit Issued Date: 01/28/2013 Expiration Date: 01/29/2013 Project Description: Project Name: Permit Type: SEWER CONNECTION VALLEYVIEW SEWER Primary Contact: H & R COMPLETE Applicant: H & R COMPLETE Address: Phone: Email: PO BOX 749 NEWMAN LAKE-, WA 99025 509-218-8336 SITE INFORMATION• Site Address: Parcel Number: Subdivision: Assessors Description Inspection Area: Zoning: 6518 E 17TH AVE 35252.0303 VALLEY VIEW HILLS FIRST ADDITION VALLEY VU HILL 1ST L3B3 Water District: Spokane County Water District #3 Owner: Address: Phone: Email: AZZINNARD, KATHLEEN A 6518 E 17TH AVE SPOKANE, WA 99037 Fire District: Fire District 8 Land Area: 14000 Square Feet CONTRACTOR INFORMATION' General Contractor HRCOMI'97200 H & R COMPLETE PO BOX 749 NEWMAN LAKE-, WA 99025 509-218-8336 DETAII S: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAII • Processing - Utilities UIIIites Permit 1 $125.00 $125.00 Total Fee: $125.00 $26.32 $125.00 $151.32 CONDITIONS. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 01/28/2013 08:50:40 Printed by: IIS APPPOOLSSmarlGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -13000039 01/28/2013 Expiration Date: 01/29/2013 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 01/2812013 08:50:40 Printed by: 115 APPPOOL1SmartGovProdApp