2001, 03-30 Permit: 01001973 Garager SPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
(509) 477-3675
SITE INFORMATION
PROJECT INFORMATION
Site Address: 9910 E 17TH LN
SPOKANE, WA 00000
Parcel Number 45291.9121
Subdivision: DISHMAN COMMONS
Block: Lot: 13B
Zoning: UR -1 Urban Residential -12
Owner: NORTHWEST REGIONAL FACILITATO
Address: 525 E MISSION AVE
SPOKANE, WA 99202-1824
Inspector: DAN HOWARD
Water Dist:
Project Number: 01001973 Inv: 1 Issue Date:
Permit Use: DETACHED GARAGE (EAST 1/2)11 X 20
3/30/01
Applicant: NORTHWEST REGIONAL FACILITATOR
525 E MISSION AVE
SPOKANE, WA 99202-1824 Phone: (509) 484-6733
Contact:. NORTHWEST REGIONAL FACILITATOR
525 E MISSION AVE
SPOKANE, WA 99202-1824 Phone: (509) 484-6733
Setbacks - Front: EXIS Left: 0 Right: 34 Rear: 5
Group Name:
Project Name:
PERMIT(S)
Building Permit
New Building
Dhn: 11 X 20 1 Story
Sq Ft: 220
Grp: U-1 Type: VN
Contractor: NORTHWEST REGIONAL FACILITATO
License #: NORTHRFOS7J1
GARAGE
Total Value:
U-1 VN 220
$2,640.00
RESIDENTIAL VALUATION
STATE SURCHARGE
RESIDENTIAL SURCHARGE
$75.50
$4.50
$16.61
Total Permit Fee: $96.61
PAYMENT SUMMARY Page 1 of 1
NOTES
PERMIT
Processed By: CUMMINGS, KATHY
Printed By: WENDEL, GLORIA
Tran Date Receipt # Payment Amt
3/30/01 1909 $96.61
Total Fees AmountPaid AmountOwing
$96.61 $96.61 $0.00
FILE
4 � J
NOTICE
It is the responsibility of the appllcant/permlttee, not Spokane County, to see to It that the use described on the front of this permit complies with
applicable codes and requirements and that required Inspections are requested. Failure to request required Inspections and obtain the necessary
approvals prior to progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construcffon at the
applicant's/permit-lea's or properly owner's expense. At a minimum, the following Inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are id'place and' prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the structure'ssetbacks from property lines. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from properly lines, while setbacks for yards abutting streets are measured from
the properly line or the center One of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-
way. Curb lines and fence lines are not necessarily Indicative of property lines. In some residential areas, the County can own as much as 20 feet of
right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions Iles solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verity their location prior to locating your structure. Failure to properly locate the structure may require Its relocation at the
ownees/permittee's expense.
2. FOUNDATION - when forms and reinforcement are In place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking Is In place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. AU permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the Installation of fire hydrants, fire department access, on-site
drainage ("208 swales"), road Improvements, parking, and landscaping are common requirements of a permit/site plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - Final Inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed
Inspection record card must be available on site.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be
inspected prior to cover. Check with the department for °special inspections' In conjunction with commercial projects.
CALL 477-3675 FOR INSPECTIONS.
TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE.
YOUR INSPECTOR IS
UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES:
• Road cuts for utilities or driveways, Division of Engineering & Roads • Sewer connection, Division of Utilities
477-3600 477-3604
or State Department of Transportation or City Public Works Department
456-3000 625-6300
• On-site waste disposal system, Spokane Regional Health District • Electrical wiring, State Department of Labor and Industries
324-1560 324-2640
• Construction in a flood plain, Division of Engineering & Roads
4774600
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or Is stopped
for a period of 180 days, unless a written request for an extension of the permit Is received and approved by the Building Official prior to expiration. At
a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one
year of the date of expiration for one-half the original fee, subject to certain limitations—please call us If you have any questions.
All refund requests must be made In writing by the applicant/permlttee (shown on the reverse) no later than 180 days after the date of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
It you think we've made an error In processing this permit or In conducting inspections pertaining -to it, or find -erroneous Information in the permit,
please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be
directed to the Division of Building and Code Enforcement at the address found on the face of this permit.
•
I certify that I am the owner or am authorized by the owner to make thls application and that I have examined this permit/application, state that the
Information contained in it and submitted by me or my agent to compile said permit/application Is true and correct, and authorize Spokane County
to proceed wtlh processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions Included herein and
agree to comply with same. All provisions of laws and ordinances goveming this type of work will be complied with whether specified herein or not
I understand that the Issuance of this pt mlt/appll •°n and any subsequent inspection approvals or Certificates of Occupancy shall not be
construed to give authority to violate a cancel revisions of any state or local law regulating construction •r agreement concerning this
properly, or as a warranty of conion 5 ce with ..rovislon . f -ny tate or local' laws regulating construction.
SIGNATURE OF
APPLICANT/PERMITTEE i /j, APPLICATION 5
`OR AUTHORIZED AGENT / �� I .- _/� DATE
0 D