2002, 07-17 Permit: 02005831 GarageJ
SPOKANE COUNTY DIVISION OF BUILDING
AND CODE ENFORCEMENT
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information
Project Information
Site Address: 10008 E 17TH LN
SPOKANE, WA 00000
Parcel Number: 45291.1910
Subdivision: DISHMAN COMMONS
Block: 3 Lot: 1OB
Zoning: UR -1 Urban Residential -12
Owner: NORTHWEST REGIONAL FACILJTATO
Address: 525 E MISSION AVE
SPOKANE WA 99202
Building Inspector: DAN HOWARD
Water Dist: SPO CO WATER DIST#3A
Building Permit
Project Number: 02005831 Inv: 1 Issue Date: 7/17/02
Permit Use: DETACHED GARAGE - EAST 1/2 (11 X 20)
Applicant: NORTHWEST REGIONAL FACILITATOR
525E MISSION AVE
SPOKANE WA 99202 Phone: (509) 484-6733
Contact: NORTHWEST REGIONAL FACILITATOR
525 E MISSION AVE
SPOKANE WA 99202 Phone: (509) 484-6733
Setbacks - Front: Left: Right: 0 Rear: 5
Permits
Group Name:
Project Name:
Contractor: NORTHWEST REGIONAL FACILITATO
License #: NORTHRF087J1
New Building GARAGE
Dini: 11 X 20 1 Story
Sq Ft: 220
Grp: U-1 Type: VN
FOR BUILDING INSPECTIONS CALL (509) 477-3675.
Total Value:
U-1 VN 220
$2,640.00
RESIDENTIAL VALUATION
STATE SURCHARGE
RESIDENTIAL SURCHARGE
Total Permit Fee:
S75.50
$4.50
$16.61
$96.61
Payment Summary
Total Fees AmountPaid AmountOwing
$96.61 596.61 SO 00
Tran Date Receipt #
7/17/02 5332
Processed By: SHATTO, JULIE
Printed By: WENDEL, GLORIA Page 1 of 1
Payment Amt
596.61
PERMIT
1-731
NOTICE
It is the responsibility of the appllcanVpermlttee, not Spokane County, to see to it that the use described on the front of this permit complies with
applicable codes and requirements and that required Inspections are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections am required may necessitate removal of certain parts of the construction at the
applicant's/parmittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are In place and prior to placement of concrete—WI structures, including manufactured homes.
NOTE: This Inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-
way. Curb lines and fence lines are not necessarily Indicative of property lines. In some residential areas, the County can own as much as 20 feet of
dght-of-way between your property and the actual improved streetcurb. The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
ownels/permittee's expense.
2. FOUNDATION - when farms and reinforcement are In place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking Is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -In, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final Inspection.
NOTE: In addition to inspection of the structure, this Inspection Includes review of site Improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permlL Items such as the Installation of fire hydrants, fire department access, on-site
drainage ("208 swales"), road Improvements, parking, and landscaping are common requirements of a penniVsite plan which must be com-
pleted prior to final approval of a building or Issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed
Inspection record card must be available an site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, ar, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for "special Inspections" In conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and tire inspections, Division
of Building and Code Enforcement
477-3676
• Construction in a flood plain, Division of Engineering & Roads
477-3600
• Electrical wiring, State Department of Labor and Industries
324-2640
• On-site waste disposal system, Spokane Regional Health District
324-1560
• Road cuts for utilities or driveways, Division of Engineering 8
Roads - 48-HOUR NOTICE REQUIRED
477-9600
or State Department of Transportation
456-3000
• Sewer connection, Division of Utilities
477-3604
or City Public Works Department
625-6300
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation If the work authorized by the permit Is not commenced or is stopped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a
minimum an Inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions.
All refund requests must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the date of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or In conducting Inspections pertaining to It, or find erroneous information in the permit, please
bring it to our attention Immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and Code Enforcement at the below address.
Spokane County Division of Building & Code Enforcement
\
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133