Loading...
BROADWAY E 19011 ADMIRALTY SAILBOATS SAILBOAT SALES il I F y _ ' ~ . . . BROADWAY E 19011 DATE FINAL ENGINEER' S REVIEW SHEET BLDG. PERMIT #-or -FILE B95073 _95 Related File # 7 ~ Date to Review 05/10/95 Time 10:00 # PRE-APPLICANTION Date to AA & DR Time Date Received 04-27-95 Project Name ADMIRA.LTY SAILBOATS SAILBOAT SALES No. Lots No. Acres Range - Township - Section SITE ADDRESS BROADWAY E 19011 PARCEL # 551740*0'410 Applicant's Name BILL MOORE Phone # 926-1150 Address 15912 N RAINBOW DR Work # 467-0023 Dates Conditions mailed Contract person Phone 3 FLOOD ZONE No W S School c o n`. ~O~~j Engineer / Surveyor's / Architect's Name Planning Contract Person Phone # 456-2205 Date Submitted Description Initials ~I ! 4g / 13 /9SAGREEMENT TO PAY FEES OR PR,IORITY FEE COMPLETED & COPY TO ACCOUNTII~ FINAL PLAT FEES COMPLETED & 5QP_X-TC~ACCOUNTING 9 j NOTICE TO PUBLIC # 1 3Q 6 C9N&LET„ED--"OR NEEDS TO BE SIGNED DESIGN DEVIATION SUBMITTED . ALTERATION TO PLAT - BLOCKS -LOTS BOND RELEASED - ROAD & DRAINAGE IMPROVEMENTS HEAR[N6 EXAM APPROVED DENIED- APPEALED BBC / PROJECT APPROVED DENIED BOND QUANTITIES FOR DRAINAGE ITEM CALCULATED STAMPED MYLARS TO PERMIT TECHNICAN (SYL/SUZANNE) STAMPED 208 LOT PLANS TO ADMINISTRATIVE ASSISTANT (SANDY) C01-. ~ ,4 A010.f~Lr ~ta-1, d~+vf'dU.~ . ~.~t~-s-~~o?~ !l - ~a • • - ~ ~ece-~ C~*~.~L gvZ^' f3r4 ~ fiJ A ~ c c3u•~' L "'~1 ~ 040 7Z8,.~ a~- ~j k t I PROJECT NUMBER= 95002716( APPLICATION,' 'DA08/24/95 PAGE= 01 THIS IS NOT A PERMIT PENALTIES WILL BE ASSESSED FOR COMMENCING WORK WITHOUT A PERMIT SITE STREET= 19011 E BROADWAY AVE PARCEL#= 55175.0410 ADDRESS= GREENACRES WA 99016 PERMIT USE= SAILBOAT SALES PLAT#= 000000 PLAT NAME= UNKNOWN BLOCK= LOT= ZONE= B-3 DIST#= G % AREA= F/A= A WIDTH= DEPTH= R/W= # OF BLDGS= # DWELLINGS= WATER DIST = CONSOLIDATED IRRG #1 OWNER= MOORE, BILL PHONE= 509 467 0023 STREET= 15912 N RAINBOW DR • ADDRESS= SPOKANE WA 99206 CONTACT NAME= LONNIE STEVENS PHONE NUMBER= 509 535 9016 BUILDING SETBACKS: FRONT= 94 LEFT= UNK RIGHT= 10 REAR= UNK REVIEW INFORMATION *****************,t*********** DEPARTMENT . REVIEW REQUIREMENT , BUILDING REVIEW COORDINATOR - J LARSON COMMENTS: BUILDING PLAN REVIEW REQUIRED COMMENTS: • BUILDING SEWER PERMIT PENDING COMMENTS: BUILDING ZONING/SITE REVIEW COMMENTS : : . . . . t~ ENGINEER APPROACH/FLOOD PLAIN/DRAINAGE COMMENTS: ENGINEER SITE DRAINAGE TO BE REVIEWED g 9~ COMMENT S : ew , e • 9S ' FIRE DISTR EIRE FLOW TO BE REVIEWED . i ► , PROJECT NUMBER= 95002716 APPLICATION DATE= 08/24/95 PAGE= 02 COMMENTS: WA ST DEPT STATE HIGHWAY IMPACT/ACCESS COMMENTS: BUILDING PERMIT CONTRACTOR= TOWN & COUNTRY BUILDERS INC PHONE= 509 535 9016 STREET= 5918 E TRENT AVE ADDRESS= SPOKANE WA 99212 NEW= X REMODEL= ADDITION= CHANGE OF USE= DWELL UNITS= OCCUP. LD= BLDG HGT= 14 STORIES= 1 BLDG W X D= 60 X 100 SQ FT= 6000 SPRINKLER= N REQ PARKING= 12 #HANDICAP= 1 CRITICAL MAT= N DESCRIPTION GROUP TYPE SQ FT VALUATION OFFICE B-2 VN 308 14879.48 WAREHOUSE S-2 VN 5692 111221.68 ITEM DESCRIPTION QUANTITY FEE AMOUNT COMMERCIAL VALUATION Y 734.00 PLAN REVIEW FEE Y 477.10 STATE SURCHARGE Y 4.50 ENGINEERS REVIEW Y 50.00 COMMERCIAL SURCHARGE Y 218.00 ZOCD-BUSINESS ZONE; 124 Y 270.00 ZOCD-COMM SQFT-S-lOK; 128 Y 110.00 ,t*yt~~~yt*yt~****~*~*****~~**yt~~r** PAYMENT SUMMARY *****t*~r~***yt*~r~r**yt~~******~r , PAYMENT DATE RECEIPT# PAYMENT AMOUNT 08/23/95 00007838 907.10 TOTAL DUE= 956.50 TOTAL PAID= 907.10 -PERMIT TYPE FEE AMOUNT' AMOUNT'PAID AMOUNT OWING - - BUILDING PERMIT 1863.60 907.10 956.50 . - 1863.60 907.10 956.50 . ; PROCESSED BY: BURRIS, ROBIN - ~•h P.RINTED BY: JOHN LARSON , ' _ - , THANK YOU iS , ' ) ii , nTD . . ~u ' a I~ r- ~ REPOKT OF 5/10/95 QkE-APPLICATION CONFERENCE 19011 E BROADWAY - SAILBOAT SALES ~ NAMF. ~ ADDRESS ~ CITY ~ STA'IE ~ ZIP ~ PHONE ~ CONTAGT OWNER lBILL MOORE 115912 N RAINBOW ~ SPOKANE ~ WA ~ 99208 ~ 467-0023 ~ X ~ STATIE ENVIRONMENTAL POLICY ACT (SEPA) Thc proposal was rcviawcd by tl►c Divieian of Buildinge for compliance with thc Stitc Eaviroameatal PoGcy Act. A threeWd determiantion ia nd rcquird based au WAC 197-11-800(1)(G). PROJFCT OVERVIEW Pole building for storage/sales and office for sail boatsales. The project will include a display yard adjacent to the freeway. Only the office and restrooms are to be heated. SUMMARY OF PROPOSED occu- LAND USE PANT CONST FIBE 61mtARCEL ZONE ACI1ON6 1YPE dU1LDING USE SQ.FT. GROUP TYPE F[AW WA71Et PURVEYOR / PHONE ~ ~ 55175.0410 ~3 ZE-i39-76C ~ Oftioe 600600~ Muhipk ~ VN 1500 Consolldaoed IrriRadon Diatricx 019 (924-3635) I IZE139A-76C I I Sabs I ~ I I DISCUSSION TOPICS (CLARIFICATIONS, ADDITIONS, AND CORRECTIONS TO WRITTEN COMMENTS) ZOr1ING (456-3675) CONTACT: LORNE LAKSHAS. * Written comments were prepared & a copy given to the applicant. ° * Note on site plan that storage and refuse will be stored inside the building. * All major public entrances to buildings shall be landscaped with Type III landscaping. * Legal description describes property left after freeway was built; could segregate back based on the original lot; will require Cerbficate of Exemption. a I u ENGINEERING & ROADS (456-3600) CONTACT: KATHERINE MILLER. * Written comments were prepared & a copy given to the applicant. * WA State Dept of Transportation appears to be agency of jurisdiction and should have their own signature block on this permit. * Each property along Broadway is recluired to pay for the roadway restoration. HEALTH DISTRICT (324-1560) CONTACT: DARYL WAY * Ready to sign off with the understanding that connecdon is made to public sewer. * A11 construcaon debris must be taken to a licensed disposal facility; no on-site burning or burial will be authorized. FIRE DISTRICT NO. 1(928-2462) CONTACT: PAUL CHASE * Knox box required. * Division of Buildings to verify hydrant requirements. DIVISION OF BUII.DINGS (456-3675) CONTACT: KEN JEFFREY. * Written comments were prepared & a copy given to the applicant. * For information on the Americans with Disabilities Act, call 1-800435-7232. * One hour wall required on east side of property. * Effective 411/94 all commercial projects shall demonstrate compliance with the Non-Residential Energy Code. * Two euits will be required from this structure WA STATE DEPARTMENT OF TRANSPORTATION (324-6199) GREG FIGG. * Will need a letter stadng number of vehicle trips per day. Provide copy to County Engineers. SEE REVERSE FOR PERM/T RELEASE REQUIREMENTS ✓ . a, . PERMIT RELEASE REQUrREMENTS Please submlt seven (7) seu of rtvrsed sfte, drainage, and landscapc plans plus three (3) compku seu njconstruction drawfngs to the Deparpttent ojBulldings for acbrowldgernent and distribution m a!! thr appropriate agencfes. !n order jor ali agencies to expeditiously process your project, it !s important that subnuuals includt ctll necessary drawtngs and documenss to insure that review ojyour projeet is contpleted in the ltast mnounl oJri►nt. Documants should include: building address and kgal descripdon ojproperty. Spokane County's Project Review Coordinator will be John Larson at the Div. of Buildings 1456-36751. )ZONINO JENOINEERS I HEAI.TH I FIRH I BUILDIN(3S I UT1UTlES , . . ~ . . . . . x ~ y~~}:•:•.•::•:•:•'.Y:: : i i .:.r}'•1~~.L'~ •~Y: ~W '.•.,LY:: 1y tiY::.; :Y:. ' Y.•::.Y ~L{~y jj {j 1~1'J........ h V. ~ . fJ f.'fJ': f : ! ~ n . :.Y.~V ~ f :.1:•••:•::ti'ff } Y~}~'Y . f.•:~ ~('j~'J~' • • • ..~i'i ~L'} f:'1 ~ f}r::~ ti•J: i . 'l • 'f•.?: 'V~~•. :`.\ti:.\ ~ • l'~'~'. •.\•::`~T~•.•~{..^.T• • . •.:••~.f....~ ....~...~~.•:i: `.•J: .1:: ~1 IJJ `"TAll. ':l.:'l'l •Yf:l~ ~ . . .......~:•:.~.:::•.:~:::~•::::::,~.~:.;::::.;;`:::r~.....:..,.......~ ....~....r..~~r:: , . . . . . 1 lBuildinR heiRht in atories & feet ~ X 2lCurbino acound landscaping ~ X 3 ~ Dimension tcavel lanea ~ X 4 ~Exterior li h+a g/directian of illumination X S i Fence location, heiRht, & type ~ X 6(Landsca i~n . of parking lot + X 7 125' Txpe II IandscaQing adiaeent to I-90 ~ X 811S' TXpe III landsca in adjacent to Braadway ~ X 9 ILandscaping (location, apeciea, eize) ~ X 10 (Parcel boundary dimensions end legal descrivtion ~ X l l lBuilding coverage calcul8tion ~ X 12 IParicing & tcaffic ciroulation plan ~ 13 IPericing siells (number, striping, dimension, directional arrows) ~ X 14 IPaving ~ X 15 ISetbacks ~ X J 16 Si na e(iocsGon, height, & squere footagc) ~ X I 17 S uare footage &c type of use of ro osed bldg ~ X 18 Traffic control devices ~ X 19 lDrainage plen (sweles, drywells, calculations) ~ I X 20 1 Driveways & all eoad appcnechea x 21 fHandicaUerkinf sialls & acceaswa,ys (into & within bld~`/f X ~ ?;ir 'i' ri ~y~!{ Qy.~y 1~►yt~`~~ ~ y~.h.~ . x: ' ' } +S:i2C:Y• '2: i~~ r~,', ' y~ y L, vn• ~~ry y LY.Y}~VG• f' y~ ry f y'• ' . J. . v r>~'• ' 1y`' 4ti ~"Y' , ti.$''+.•i:•:• i~rh t~:: : ~i:G:~; rx : i ri:~ .{X~:•.~~~~~ •iZ~~ii+t:~J!4h,Q~'i'~~:2'7Gii~7~ti:~-vf:~~h _ h h ~.:7. q~ .Yr '~}j ~~r$.. ~r:♦ r~::~,r}k~}~ r . r ~ • ' h tiyJ .;•s }':•l^y~', lr f LYl J.~S Y:. L~ T~titi~ ~ \t ti. •~_r~._ Y .:.:.Y: h1f.ti 11 ~ti'J..:.....•.•~: ~~'~:"••5.: • 1.~..{ {`FS . 1WW 22 (Certificate of Exempdon ~ X 23 icri ation syatem pleas ~ X 24 Nursery esiimate ~ X 25 1 Pcomissory letter for landscape requirements ~ X 26 A,c~eemertt to paY fees & minimum rsquirements list X 27 Approach permit foc aceeas to county roads X 28 (Recorded property deed }t 29 IRID Agreement for fuwre inad improvements X 30 ICritical Materials list X X ~ 31 lScwer permit I X 32 IConnection Ageement I X 33 lLock (Knox) box entry systcm form X 34 lSpecial NREC Plan Reviewer/Inspector X ~ rc4~agtk r • ••:p~t:•~. ` ~ • t :;,.1ti~ ; •x•: u~c~ ~ tr• r::a:<t.•:: ~t~ca c;'w:: t~:::•::.•>:.,+: •c• •::;t,+:.~ r.~r.;•: : { . ,~~i`; ; . r.... ~~i:c~:•t :.a. ~v.~4. '~y 2~~ ti• . ~ : • ti; . . t • . . . . . _ . , ~ti?~ti} :.Lti .ti,+7Cw.: i~•.:•.yrr{.;•.~.~.• r:~...~xti, v!.•.~•?~;{::~:.}r:~ ' • i:ti~ • . . , ~ . ..r. ..:::::ri::~:. ~.lA'1~. .r~ ~~~~~'W.WW~~:~•i •1Ti~Yi:..}..xl' ~..:.r~...;y.:..ti.{.}: •.~.:::..t::•:: ~ $~:{ry'}••~}>irY.:•Yri 35 ~BArrier-Frae Requirements (WAC 51-20) X ~ 36 lDesign specificationa of proposed building ~ 37 ~EJectrical details X ( 38 ~ Enecsy details/calculations ~ 39 ~Heating, ventilation & air conditioninR drawings X ( 40 IPlumbing details 7{ ~ 41 lScparetion wall details x ~ 42 lStructural drawings with wet stamvs & calculations ~ ~eel,114 Sibnitu ,6f `o rdinator Signeture of Plen Reviewer Project No: 95002716 . Page 1 OFFICE OF TSE COIINTY ENGIN£ER SPOKANE COIINZ'Y, WASHINGTON Project:Admiralty Sailboats Date:May 10, 1995 Address:E. 19011 Broadway Ref No.B95073 Parcel No:55172.0410 Review Pre App The County Engineering Department has completed a review of the above referenced project. The following information must be provided in order for us to proceed with our review. A) For any new impervious surface area a drainage plan for the site shall be prepared in compliance with Spokane County "Guidelines for Stormwater Management". At . a minimum the plan must ~contain: 1. Drainage calculations for stormwater volumes generated on site. 2. Calculations for total impervious surfaces contained within the site. 3. Finished grade elevations for structures to be constructed on site. 4. Finished grade elevations at the top and bottom of the 208 swale. 5. A typical cross section of the 208 swale. 6. Calculations to justify the number and type of drywells proposed. 7. Elevation of drywell inlets where applicable. 8. Copy of the proposed landscape plan. B) The subject property is affected by the "Findings and Order" and the "Conditions of Approval" for the following . land use action: Spokane County Zone Change No.ZE-139A-76 C) The following improvements within adjacent Right of Way are required prior to the release of a building permit: 1. You must submit road and drainage plans for street improvements. These must be prepared by an engineer. Plans must be prepared for the following streets: a. Broadway, 'Iypical Roadway Section 1 local access. NOTE: An RID agreement for the realignment of Broadway will be accepted. All required construction (sidewalk/curbing/pavement) within the Public Road Right of Way is to be completed prior to the release of a building permit or a financial guaranty in an amount estimated by the County Engineer to cover the cost of construction or improvements shall be filed with the County Engineer. Required plans are to be submitted prior to estimating the amount of the f inancial guaranty or permit release. « f , . Page 2 2. As an alternative to the required road improvements the County will accept an RID/CRP agreement "Notice to Public No. 6" on the property. . 3. Each applicant along Broadway is required to pay for the roadway restoration. The amount will be based on linear feet of frontage along Broadway. For the 54.39 feet indicated on the preliminary site plan the amount will be $250. If the frontage length changes the amount will also reflect the change. 4. Please submit a copy of a recorded property deed from the Auditors off ice for the subject property. Upon receipt of the deed our staff will prepare the right of way deed and/or the RID/CRP agreement. 5. Approach permits must be obtained, after a site plan has been approved, and before the issuance of a building permit, f rom the County Engineering Department for any new or improved driveway approaches to the following streets: a.Broadway , D) Insufficient information was submitted with the proposal. We are unable to proceed with our review. We will need the following before we can proceed: 1. Site Plan. 2. Drainage plan as specif ied. 3. Other information: a. A parking and traffic circulation plan shall be submitted and approved by the Spokane County Engineer. The design, location and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving as required by the County Planning Ordinance, will be required for any portion of the project which is to be occupied or traveled by vehicles. It is illegal to back out onto the Right of Way. b. The Washington State Department of Transportation appears to be agency of jurisdiction on this . project and should therefore have their own signature block on the permit. E} Utility Condition: Permittee is responsible for arranging for all necessary utility adjustments or relocation as required for completion of the improvement. F) The owner of the property or the authorized representative must complete and sign Spokane County Engineers "Agreement to Pay Fees". This document must be returned to the County Engineers Off ice. Plan review will not be completed until this document is executed. This document is attached to these comments. Please return the completed Agreement to your contact person at the Engineers Department. G) See comments on the attached minimum requirements checklist. Please return the checklist to your contact person at . County Division of Buildings. .a. j , Page 3 The applicant or their representative is responsible for including each item that is marked "Required By This Project" in their submittal in accordance with the checklist descriptions. Each item submitted that is to meet the checklist shall be checked off by the applicant or their representative. Submittals which do not conform to the above requirements will be returned for further items with no review being accomplished. This will prolong the review process. If changes occur in the requirements for the project because of further conversations with Spokane County representatives, please attach a note explaining the agreed upon change in requirements. When the applicants' submittal is finally approved, the Engineers department will release their portion of the Building Permit. Your contact person at the County Engineering Department is Katherine Miller, 456-3600. Page 1 OFFICE OF THE COUNTY IINGINEER SPOKANE COUNTY, WASHINGTON Project:Admiralty Sailboats Date:May 10, 1995 Address:E. 19011 Broadway Ref No.B95073 Parcel No:5517_g-.0410 Review Pre App The County Engineering Department has completed a review of the above referenced project. The following information must be provided in order for us to proceed with our review. A) For any new impervious surface area a drainage plan for the site shall be prepared in compliance with Spokane County "Guidelines for Stormwater Management". At . a minimum the plan must contain: 1. Drainage calculations for stormwater volumes generated on site. 2. Calculations for total impervious surfaces contained within the site. 3. Finished grade elevations for structures to be constructed on site. 4. Finished grade elevations at the top and bottom of the 208 swale. 5. A typical cross section of the 208 swale. 6. Calculations to justify the number and type of drywells proposed. 7. Elevation of drywell inlets where applicable. 8. Copy of the proposed landscape plan. B) The subject property is affected by the "Findings and Order" and the "Conditions of Approval" for the following , land use action: Spokane County Zone Change No.ZE-139A-76 C) The following improvements within adj acent Right of Way are required prior to the release of a building permit: 1. You must submit road and drainage plans for street improvements. These must be prepared by an engineer. Plans must be prepared for the following streets: a. Broadway, Typical Roadway Section 1 local access. NOTE: An RID agreement for the realignment of Broadway will be accepted. . All required construction (sidewalk/curbing/pavement) within the Public Road Right of Way is to be completed prior to the release of a building permit or a financial guaranty in an amount estimated by the County Engineer to cover the cost of construction or improvements shall be filed with the County Engineer. Required plans are to be submitted prior to estimating the amount of the financial guaranty or permit release. , • Page 2 2. As an alternative to the required road improvements the County will accept an RID/CRP agreement "Notice to Public No. 6" on the property. 3. Each applicant along Broadway is required to pay for the roadway restoration. The amount will be based on linear feet of f rontage along Broadway. For the 54.39 feet indicated on the preliminary site plan the amount will be $250. If the frontage length changes the amount will also reflect the change. 4. Please submit a copy of a recorded property deed from the Auditors office for the subject property. Upon receipt of the deed our staff will prepare the right of way deed and/or the RID/CRP agreement. 5. Approach permits must be obtained, after a site plan has been approved, and before the issuance of a building permit, from the County Engineering Department for any new or improved driveway approaches to the following streets: a.Broadway . D) Insufficient information was submitted with the proposal. We are unable to proceed with our review. We will need the following before we can proceed: 1. Site Plan. 2. Drainage plan as specified. 3. Other information: a. A parking and traffic circulation plan shall be submitted and-approved by the Spokane County Engineer. The design, location and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving as required by the County Planning Ordinance, will be required for any portion of the project which is to be occupied or traveled by vehicles. It is illegal to back out onto the Right of Way. b. The Washington State Department of Transportation appears to be agency of jurisdiction on this . project and should therefore have their own signature block on the permit. E) Utility Condition: Permittee is responsible for arranging for all necessary utility adjustments or relocation as required for completion of the improvement. F) The owner of the property or the authorized representative must complete and sign Spokane County Engineers "Agreement to Pay Fees". This document must be returned to the County Engineers Office. Plan review will not be completed until this document is executed. This document is attached to these comments. Please return the completed Agreement to your contact person at the Engineers Department. G) See comments on the attached minimum requirements checklist. Please return the checklist to your contact person at , County Division of Buildings. Page 3 The applicant or their representative is responsible for including each item that is marked "Required By This Project" in their submittal in accordance with the checklist descriptions. Each item submitted that is to meet the checklist shall be checked off by the applicant or their representative. Submittals which do not conform to the above requirements will be returned for further items with no review being accomplished. This will prolong the review process. If changes occur in the requirements for the project because of further conversations with Spokane County representatives, please attach a note explaining the agreed upon change in requirements. When the applicants' submittal is finally approved, the Engineers department will release their portion of the Building Permit. Your contact person at the County Engineering Department is Katherine Miller, 456-3600. n • r + , . . ~ • ~ } . ~ TRANSAMERICA , ^ THIS EWE&R6VI6E6 F94ECORDER's usE: ~ , .TITLE INSURANCE COMPANY • ' ~ . . . . REeu Es ~ • _ . -jj~St Aji1EA1CAt~ TITIE ; • • 5 8 42 ~'1' JJ ~ F11E0 FOR RECORO AT qEOUEST OF ~UN I 1 • . 4 • ` wiLu..t a ~ ~ . • ~ SPOKANE. C(.t!4*1 1. M!,-.H. ; 9506154bOl WNEN RECOROE~ RETURH TO t YoL. 17 3 v PACE ~ v~ y~ I H.m. . V ~ . A nea,............... N ....2.LA...U)Rivems i tY • ; . • , , cily. st.t.. zip.........~PQkane.~.... wA 9.~ 2 0 6 - A Statutory Warranty Deed . . THE CRAN'I'OR S DONWOOD, • ZNC.', a _ Washington corporation, ~ . ~ ~ ~ _ ~ • _ 5 lorendinoonsiderationof Ten Dollars and other valuable consideration, , ;nhandpaid,oonvcyenndwatrantm to WILLIAM L. MOORE and KATHLYN L. MOORE, husband and wife, ~ } ~ s t onte-half and CARL E. RAFELLO and MARY LOU R11FELL0, husband and wife one-C~. la (oiwng aeeercnbed ien) eatete, eituatcd in the County of Spokane ~Steteof Washington: Lot 5, lying South of Primary State Highway No. 2, Spokane to Greenacres, Block 3, CORBYN ADDITION TO GREENACRES, according to prat recorded in ~ Volume "S" of Plats, page 30, in Spokane County, washington; EXCEPT those portions of said Lots 2,3,4 and 5 conveyed by Burlington r Northern Inc. to the State of Washington by Quit Claim Deed dated June C, . 4, 1976, undez No. 7609160303, and EXCEPT those portions of Lots 2,3,4, S and 8 conveyed by the Great Northern Railway Company to the State of ' washington for highway purposes by Quit Cl.aim Deed dated October 10, 1957, E: recorded as No. 4938718 and described as "Freeway Right of Way" and ~ "Frontage Service Road Riqht of Way" only. SUBJECT TO: • -a` 1. Restrictions and easements of record includinq any covenants common to the area, including any relinquishments as per recording No. 4938718. 2. Last half of 1995 general taxes which will be due on or before • October 30, 1995. 3. Last half of 1995 Assessment of Conso2idated Irriqation District No. 19 and future assessments of district. Daled 19............. 9~UU0D71iJ.Q , . Excise e~ Pa'~-C Sale Amt. Pd. DONWOOD, INC. /JO• DO . . . ~......Spok 7 County 7r ~ • ~ ~ . ....0~. y Y.. ulj~ . . ..c~ . J ST/1TIi 01- W/1SIIINGTON STA'I'E (11' WACHINGTON COUNTY l)l: COUNTY clF S o anP ! g 1 eertify tAa I teK.w cK have sat'r+(acynrr evkkne thst ~enify ~hal 1 Iti iac vii.factnry eviJcnce t r~~~ L • , . ia lht ia the fervinte) wM appearcd PeG t nrc. stal aaiil r-crsrm(sl Ktew•wieilFnl tlut fhtla!►dthry! >iRn. retxw+fa) wFm aMured hefott me. and "id petvm(c) etllhis insirumrnl. txi twh w~ t Iht/she/l ~y 1 w (w~e~1sinFr rr'rrd 1+vtictivtc Ihc irtvrui n ; KtnrwledEal Ifui (he/~heAhev) utneE Ihn inarurt+ed srd ]~~~1:. UVIVWVIJ oc►no.vlaiRal 'a io hs (his/her/iheii) frae and velunury aet Gx nnd ark0.r+~vkt~}!}~~Iht fa Il~c frec ~nJ wduMary hY 4if Ik uaa an1 pwrposcx menlk+ncd w ed+e irntrvmcnd. wcfi puny !m Ihe usa :nJ VurI%+xx rt+cntwvnul in dipc iriclrvmero. ~ • 4& ^ 6 CO Q V A ~/7 uwtcyj 6~~ ISE11. ~tA STAMM / ~ 151:AL OA STAMPI S't"'~"'t BLIL',' ~ L 1111W ' • n ' :`~i :1`'~ - ~ ~ • • . Mr .pprsw.~wi t.p:.a = W : ar mvii"Nn^~ . u r. . C'11 ~ • 1. . ~1'•'.,s~n.q v'. . ~9 1P8•10 . d•4>•, ^0~ o . ,LZ . ~5~.~. • ~`C~;~i , Form 3159•4 u~.. ~•~R • ••~.~t~R.r~ei~d ~~~'1~~"' r ~ . c. . . M1 PERMIT DOCUMENT TRANSM TTAL Spokane Couniy Divisian of Buildings - 1026 W Broadway Ave. Spokane, WA. 99260 Project Address: Project ~;!5 - 2.7 t Business Name: CONTACT: Phone: Mailing Address: COORDINATOR: Jo\Aq Phone: DOCUMENTS CIRCULATED Fire Description Bulldlng Zonlrtg Enylneers Heatth Dlstti_A_ lJtlltdes SCAPCA (NQ•'p~- AGtZo-aWN i 4b2 PCc ~ C~ -34c'- ri's \x V-kP C2L1(GrV- ivvAnE¢a ALS x X t~llU~ - ° x Fn `blF,U7tv- X St ; e 1 fJ¢at NAGr I L&W-YS[.APE X ~ k x x . °~C 2.-~G-tl.t ~ ►~c.v} ►N , ~C • Received By Date of Transmittal: Circulated by: RECTIVED ► ; AUG 2 41995 i . ; ; Sa09A;if COURiTY ENGIkEER i , • ~ . ~ ~ ~ ~ . •'n..~' ~'w~r ,i ~ , , ~ . • • l~ ~ ' ' ~ ~ ' •~:~i. ' ~ ' ~ i i , , . , . ~ ~ ~ ~ ' . ' ' ' • , , , . • . ' P 1083 . ~ . ADMIRALTY SAILBOATS OF SPOKANE A DIVISION OF B 8 K CORP. , • WK, (509) 926-1150 19-701613250 , 19011 E. BROADWAY AVE, la%vc4 19 ; • . • GREENACRES, WA 99016 J 1 • ~ OF ~04/~ C-~`G~`A~ ~ I ~~~0• J'U O I i ' ~ ORDER ~ . . _ ~r . ~ . , Ge~ /`t' DOI.LARS . ~ • IIIi WASHINGTON MUTUAL SAVINGS BANK • • , , ^ Norlhpointe flnancial Center 060 . • 9604 NoAh Npwport Higbway $polcano, WA 99218 • ' • ' AfEA10 3 i~ 111303207le,Du" 108 3 . . 0 0 .060 4~~ q~~~ tum Mrta ~ , ~ • , 2119 . RECEIPT Dote 19 ~ ;L d w 3~ Received From ~ . , . . ~ Av c- 6r.ceN~ e~~5 Address Dollar ~ . . . . , - F ~ p ~7 or ' ' . ACCOUNI HOW PAID ' . ~ " . AMT,OF CASH I ACCOUNT ~0~a CHECK 0 1 , ' pM1, PAID ~ Dpy J BAUNCE MUNEY ORDER r DUF. . ~ ~ , . 8Kd08 RE01FOM11. I ' ~S P O K A N E C O C.JN T Y OFFfCE OF THE COUNIY ENGINEER • A DTVISiON OF THE PUBLIC WORKS DEPARTMENT Ronald C. Hormann, P.E., County Engineer Qennis M. Scott, P.E., Director November 19, 1993 Gordon Curry Gordon W. Curry & Realtors Co. E. 14313 Trent ' Spokane, WA 99216 Subject: Broadway Avenue (East of Barker) - Road File No. 443 Dear Mr. Curry: . You asked sometime ago about the County accepting Broadway, East of Barker Road, for full time maintenance and what requirements we had to accomplish that acceptance. First, we would require that the roadway ditches be graded and cleaned and shouiders graded, the pavement be crack sealed, then given a chip sea] coat. Second, we would ask the construction of a turn around at the East end of the ~ road or, as you have proposed, connection out to Sprague Avenue. Our estimate for the fix-up of Broadway Avenue, if the work were done by our crews is $12,000.00 at today's cost. You could arrange to do the work by private contractor(s), if you so desired, providing the proper permits are obtained from this office and inspection accomplished. Once the road is accepted, routine maintenance will be done by the County. Additional road improvements will be required as property along the road is developed, ie widening, curbing, drainage control sidewalk etc., together with provision for participation in a future overlay over the entire road to accommodate the traffic resulting from the commercial-industrial development. Very truly yours, Ronald C. Hormann, P.E. Spokane County Engineer . / ~ ~_Z . Verril S le Engineering Administrator . - i qq'71 W. 1026 Broadway Ave. Spokane, WA 99260-0170 (509) 456-3600 FAX (509) 456-4715 TDD: (509) 324-3166 . . . . . ' . . . . . . . . . . . - - . - , . , . N . . . . . • . - . : . . . .PPL . I C A , . T . -ST ~R C~~ . . . . . . . . ~ 1Q . . A. - U :~-TION--.-:. . . .PR~ _ . ~ . . . . . ~~PIZE':: . . . . ~ . . . . - . _ , . . . . . . . . . . . . . . . :L~.A.T~E . . . . ..l.p . D . . . . . . . , . . . 5 . : ~ . ~ - . . . ~ . . . . . . . . . . . . . . . T..... . . . . . . . . . . . . . . . . . . . • . . . . • . . . _ . . . ~ . . . . • . . . . . • ' - . . . . . . . . . . , . . . . . . : . . . - . . ~ . . . . . . . . . . . . • . IN . . • . - . ~,rF . . 1~7N Cx:: . . . . . . :L= , E~ R .~~BUL:: ..:.ENCrII~:S~~:. ~ A . . . - - . . . . . . . . . ~ . . ~ . . . . . . . . . . . . . . . . . . . . . - . . . . . . . , . . , : . . . . . . . . . . _ ::C~::: . ~ . .~A;~ ~ S FIRE DIST. . . ....'C~.7'~Y.,I'~rL.~.:..::.: ~ ~ ~ . . . , _ . . ' . :i:: • a . . . . . ...rr::...:........: . . _ : r.. . . . . . ' . . . . . ' ?i: . " - :i.. - . . •-::v• . .....~M1............ .:......i::.. :..v . . - .--.r. .r.. - . ADDRESS: I ~a 11 . , ~ O WNER: 0/*// PHONE : Y6 ,74o'c2 3 ADDRESS: / 5-~P/2 Al BUSINESS NAME: ,~~~`,,li~P,~/~~ S,v~'~do~~- dr~ s~•~~E' ~ CONTACT: jgi' I `'laaoee PHONE: ADDRESS: - LEGAL DESCRIPTION: i PARCEL NUMBER: 5 S l`-1 21 ~ aLi 10 DETAILED PROJECT DESCRIPTION:- 5,41,1za'o-I ~S',~/ 5 VALUE: ~ _ - ~ ,p . - .]i:. . : _ 1.rr : i:'T:p.': .:Yi:~?v`:i.:5?'~ :'}3~. _rZ::S?': • • , . . .................r.::::....;~... ......:?..ri ' . • , _:.{:............:..5. ..:.:..~•"'v j.:~i$r :..~§.;3. . .r.:7 : . . . . . . :................_.~........r.._....... :.r}.:.:. ..::::::::::::::'r::~~ : :..:r:::,..... }i:i:.i5. • .~'r: . - . . . - . ' ..........~...,;...-......_..~•'::,}•.a.,~:..:....;..;..M1..:........n.L.::~.:........... +tr~~~. ;:::::i i:~:':•i::r}'1{i~`.:: vy: ' : . . ;...::.y: r.•r..i:i}i:..,-:::.....'v: ' , . . "'...........:.............t....:.:... .....:_.....:..........t...,..l..... . . ....:.........I.a;..r:;.......;._~:~..~~.:..;......:..;.:.y..;.:..~..r:~~l.:...:1.;:....;...::~:i~~1''~♦ •~.f:~:.•~:.}i}..:i.f::::-l~.}}}}i:: . :.............1:::::..:........._..... .:..a.:......• ..~...:i..........:. ' . _ . . Y.... 1.~ . ..\L~ . . :....................~.~~t....~.'-:•.1.~':.~..::.:...~..~ :.1.....4..~ :....1.::.....~~.~. ~.;.,.t.~..}.:_:...tiV~•~•t~t~l.~.L.....~..1::... . ::::::tr: OMMEN~.S . . . . . . C , . . . . • ~ - • :f: :'T7: :6 . :i:` -~X - ~ ~ . ~ - - . :i :a . . . .........r 4... . ~ :.......r.. :i.c:::;:;:::: - - • ' - • . . . . . . . ...::ici~c~= . . . , .~-t:= . . . . , . ; . . . ' r....:. . . • . . : . . . .;.::r:::: :i::ix • . . - . . ....::~::cc:i:::c . ;.......,.......:..........-•n . . . : `;c:•.•:t~: . i:.. :.:.x . .--••::r . ~:h'.i•~ .,y.. :it' , . . . . . , . . . . . : . .s .7:5.3"!tS',1~:~t"E•r~'5~:~~ii'~,•~, L•~.. ~ , . . :Y..i:~:...- . . . .t.. ~r••.ia::. . . - , . ~ ,y..,y~,w.a~. . • . ...#.........................k.............::::.......:-{:...............................................--•..................................... . . . ?:~:::::-:::'s,:::-::.:•:.::: . . ~ y........... . . ~ • - <r. x.:. . : ~ , . ..i i:::.:::::::: . . . . . _ - • . . . ' . . . . . ......r.........ti: .......:.....,.,~5•::....;...... . ::~::::>::r~s.'::::::i:;.:~i:.•: . . . . . . • , . . . . :.s::::: ' `:•x - ....;,.:+t .a. : . .....:.fi}•: .>s:5: ~ : . . . . . . . - .k`•f.. : ~.f::•::..::: : ,EVIEW COORI~ . . . . . . . . . . . • : : : s:::. : . ;....,:•'::s • , - . . . . . . . IN .A.TO~ ~ . . . .-:.r.... . . ~ . . . . . _ .t.. . . . . . . . . ' ~i' . ::x::::::::;>: . v...... . ::t:::-......:::: r. . .:...............:::.s.............. :::i . . . • ' • t::::::::::::::" :.;:::v::. . •.i.[.'>:::..' :nr..:..... • .'I " _ - • ' • , , r'i?::::::_•t}~r::-..::.._..ri.r:. . . . , . -BY.... . .:........:::::::::":J'AT~::;::-~ . CZRCULATED.. . - . . . . . . . . . . . . . . - ~4::::::::: . . ..r-~ . . c PROJECT NUMBER= 95002716 PRE-APPI,ICATION INFO DAT._. -)4/27/95 PAGE= 01 THIS IS NOT A PERMIT PENALTIES WILL BE ASSESSED FOR COMMENCING WORK WITHOUT A PERMIT SITE STREET= 19011 E BROADWAY AVE PARCEL#= 55172.0410 ADDRESS= GREENACRES WA 99016 PERMIT USE= 5/10/95 @ 10:00 - SAILBOAT SALES . PLAT#= 000000 PLAT NAME= UNKNOWN BLOCK= LOT= ZONE= B-3 DIST#= G AREA= F/A= A WIDTH= DEPTH= R/W= # OF BLDGS= # DWELLINGS= WATER DIST = CONSOLIDATED IRRG #1 OWNER= MOOR, BILL PHONE= 509 467 0023 STREET= 15912 N RAINBOW DR ADDRESS= SPOKANE WA 99206 CONTACT NAME= BILL MOORE PHONE NUMBER= 509 926 1150 BUILDING SETBACKS: FRONT= 94 LEFT= UNK RIGHT= 10 REAR= UNK REVIEW INFORMATION DEPARTMENT REVIEW REQUIREMENT BUILDING REVIEW COORDINATOR - J LARSON _ COMMENTS:''"' ' PRE-APPLICATION CONTRACTOR= PHONE= - STREET= ADDRESS= * PROJECT NOTE: TOPIC = CONTACTS DEPT = BUILDING * COORDINATOR: JOHN LARSON PLAN REVIEW: SR INSPECTOR: - PROCESSED BY: BURRIS, ROBIN PRINTED BY: BURRIS, ROBIN THANK YOU • ~ ~ ~ , . ~ ; I \ 1 ~ • ' • ~ J I Nh ~ . ~ ~ . , . ~ , , . ~ . , ~ i . ~ ~ r . ~ I , i . , , i I .i . . • . ~ , i ' • i • BUiLUING PERM1T C! IEclct_IS"1" ~ _ ~ ►~f~~=A1~~ . ~ -~j~~~■-~,-~~~yL~- . . - . - . - - ~~tiNd - . , . • . . ~v . . . ~ ~ . ^.4.. ~ . J ~ . ~ : . ~ . . ~ . . ~ . ~ . ~ I ~ . ~ . ~ I caMPlETE9__-~ _ ' ~ • :,r. • ~ • ~I r., i~, . . . }•~:i. '.C ' • ~ v•~.~ ti. ::.ili:~~~~ i.~ii~ • ✓ . ~ ~ • • : y • LJ:...Y. ~ • ' : . . ~ J.. ~ ..~_.....;_..~.~r. :1:. ..l.'. . 'y~a~i~~►~~~.LJ~1..4~~~ ~~\L~~ .\.~u~ ~ . 1.--. :uiu►ai- ~ .e__"._....-..".._ ~.._"W_.. . . . . A~~EF-IUP-Nfi'fio PAY r- €F-9~ RIG1 IT OF WAY nEPAffMENr - . _ _ _ _ . , . . . a~~ ~ _..EA~€~€N-i-s.._. - . : . . . . _ ~C . . . . . _ . _ . - ~iw~ ~ . . : - . . . . . . . . . . . . _ _ . . . _ . ~~~id . _ _ . ~~.EC3~1L I~ESC~tIC'~rlO~! CI:IECI~-~---.... , . . _ ~ LETTER rROM nECIPnOC%1L USE AGREEMEN7V-- ~ AF'PROACFI'pERMIT - . . . ~ _ . . . . - - . - _ - . . - - C.vvs,~._./'._.._ ~~~~'.c~~7_~~.~~~''~`."~,,~~~'~•~]'~.: E~ , . . - . . I'i E~;. _-X-:... SCALE-----..---------~--------~...---~-~----s.._....___._.. . ._.._..X---~---- BENCf IMAnf— _...__.X RoAd X Ft/W DImEH8f0HS . . . _ . . . . . . . X . . . . . _ Pi~OP~nTY LIN~B_._..... . _ . _ . . . . . . . ........X SET=ASidE s~iiowri o►t.piains_..-. . ~ . . . . . . . GRADES ~tttltl _...X - STA~JIF' . . ~ X I'AVING(sut face cltscriptioii) . . . . . X . . _ ~ TnAt=FiC CInCULATIOM PU1tJ X LAKb~CAI'ff F'L.AN (268 COh1~l.iC~1-j . . . . . . . X . . . . diYwefl%LidIInieUSplasli block Uelail... . . . . . . . , . . x.. . . ' ~ - . . . . . r:' - . . ------~~~1NA~~.._.~-~--- Roofcons{ruction 1 rVAC on -ff vot - . . . . . . . . X . . ~ . . . - Swa1e voiurTie calcuialions ~X ~ Swe e Cross Secllon X f'te beveloped Conc1111nl-i--"-"-*'----- _ . X ~'ost [)evelopec~ Cohditio1i X. . , SppCIAL SoFL TEstS* _._e._ - , UitCl~i CAL~1~.A~Io~Js . - - . _ G1~1~E~ CA~.CULA~iO~S ~ . . , , . ~ nETENTIaN/UET€N1~IoN cA~cs l0I50/100 YEAR STORM----------_..._.._. f F2-55 AhIALYSIS . . . . . . . . . _ . _ -~---..W-~- . . . . . . . . . . . . . . - '_~T.~'~~r~".~~ ' _ ~ . _ . . _ . . . ...~'...~f::~._~.... J.~ s"'".._.~_~._.-_.__ y L . . : . - - . . . ~ • ~ , . . . _ . . . . - : . . . . . ~ . . . . : . . : . . . . . • . ' . ' ~~J.♦ ~14~~ ~ ~ ~ ~ ~~.~~L~r ~~~_W 1~~►~Lj• .r....~~. NOfIFI.ArtOW - . . . . Stanciimark ~ 8c8le . . - - . GUllet GC81dCS (>0.80 _ _ . . . - cross'S ope 0.0°Io4V5°io~__.~--.--_. ~ - drdinege f2eport -C7rainaEo on Plans .cuNe aata Pdvement section Tepets/1og slripe ~ . - -.-~~---y . ~ - . y... . _ . . . - . _ Etigineers Slamp _ . . . _ _ . . . . . . _ _ . _ . . . . . . Quantllies%8ona eslimale Hond DYar_- ~ ~VVhers Si~nelure ~ ~ - _ . . . . . . . . . . . . . . . _ . _ . . . . _ . . . - . ~o~nty Stamp ~ ~ ~ ] S I7 U K .N E C O U N'~:' Y OFFICE OF TFIE COUNTI' ENGINEFR • A DIVISION QF TI TE PUBLiC WORKS DEPARTMENT Ronald C. Harmann, I'.E., County Engineer Dennis M. Scott, P.E., Director AGREEMENT TO PAY FEES ENGINEER'S AGREEMEIVT NUMBER q C50 73 This agreement between Spokane County and Gl/i~ ~ e m 1-7002 kname di person) whose interest in the project is Ol,vl1/E'R , ti.e. owner, agent, e(c.) is entered into this day of 19 19 ~'5-. This agreement is applicable to the project known as: ~ .,v 4.r.¢ofs c~~ pro~ec ac res"s oi e number)That the individuals and parties named herein as having an interest in the above described property or project agree to the following: 1. Reimburse Spokane County for project review and inspection fees as specified in Chapter 9. t4 of the Spokane County Code. The fees will be based on actual salary costs incurred by Spokane County for project reviews and / or inspections plus a ten percent administrative charge, and will be billed monthly as accrued. Any billing amounts due, including any expenses incurred in the collection of an overdue account, must be paid prior to the County's acceptance of the project for filing. If a project is approved and/or filed with a balance still owing, the unpaid balance shall be paid within 30 days of the invoice date. 2. The undersigned agrees that these fees are due and payable upon receipt of the billing as specified above. 3. Any invoices not paid within 30 days of the invoice date will be considered delinquent. If any outstanding balance on the account for this project is not paid within 30 days of ' the invoice date, no further reviews of the project documents will be conducted until the entire account balance is paid. Any balance on the account for this project not paid within 65 days of the invoice date may result in legal action or the initiation of other collection procedures, including referral to a collection agency. Tlie Sponsor will be liable for any and all expenses incurred by the County for the collection of overdue accounts. 4. The monthly billing should be sent to the attention of: NAME: Z. 1-1002 -e ADDRESS: 10, CITY, STATE: eiv 4 r.,S /*l~i4 ZIP CODE: PHONE 'ot2 ic 11S4 I understand that failure to pay these fees may result in delay in completion or approval of the project or other possible sanctions. C) If this fee agreement is completed by someone other than the Sponsor (i.e., the project owner or a principal in the firm sponsoring the project), such as the Engineer designing the project, then written authorization from the Sponsor specifically authorizing the Agent to execute tivs Fee Agreement is attached to this Fee A reement. SIGNATURE By: (PRINT NAME) RETURN YELLOW COPY TO SPOKANE COUNTY ENGINEERS k\p\tlagreemen.fee 2!1/95 1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 456-3600 FAX: (509) 324-3478 '1'DD: (509) 324-3166 ' . ADMIRALTY SAILBUnrS SPO 509 926 1150 P.03 • , . • • too'00~ 1 S~' V K J1 N L V V Orrtce of Tt tE CourltY F.NONPFa • A b1v1SlON OF Ti iH ['U8L1C: WvRKS MPARTMP.Nt Ran.i1c1 C. 1IhrmAtin, I'.E., County Engtneett Mnnts M. 3cott, P.P_., Dlttctof ' AGKCEMENT TU pAY FEE5 - :tNECR's AcxEEM~:Nr tvvMBEx 1 S D ~ TWs ogreement between Spokane Couttty mtd . ise interest ln Itie ptoJect is , t~~ . . itered into this day of rQ - , 19 s. Thts Agreement is appllcable to tht project wh A3: lprojeci . riutnoefj Tliat tiieIridtvtduals aiid parttes named hereln to having an interest In the above described pfopetty vt ptvJect !r to the t'oliowtng: 1. Reimburse Spoknne County fo[ ptoject teview and tiiaPectton fees ts specified In Clteptef 9.14 of tlie Spokane Cotiiity Codt. The fecs vultl be bascd vn actual salaty costs incuttr.d by Spokane Coutity for project revtews gnd / or inspectivns p1us a ten peccent adrninistritlve charge, atid will be billed monthly as aectued. Any bitling ttmounts dtle, Irictuding any ezpen.~es lncurred itt tfie collection of gn ovetdue accvunt, must be paid hrior to tlte Cotiiity's acceptance of the project for t11lng. Tf s project Is approvca gndldt . iled willi A Wtancc stlit owing, the unpald balanct shalt be paid wtthtn 30 days of the lnvoice date. 2. 'I'he tindersigheci agrecs that ttieae fees At# dtte And payable upon teceipt of tlie bllling As . sPecified above. 3. Atiy involces not palci witli3ti 30 days vf tlie invoice date will be considered delinquent. lf Any otitstanding balance on the gccouttt for this ptoJect is not pald wlthin 30 daya of . i1te invoice date, no further review3 of tlie project documents will be conducted unttl the tntire account baiincc is paid. Any balanct on thr account for this proJect not patd a►ithin CS days of tlie invoice date mAy reau[t In legal action or the initiation of othec collcction procedures, litcluding teferrAl to a colfection agettcy. The Sponqor wtll be liable for any atxl all expenses inctitred by the Covnty for the collectton of overdut ~ccowtts. d. 7'he montiily hillinR shoutd be stnt to tlie Atttntion of: . NAMB: AUURESS: cITY, sTnTE: 6keLo"6ee3- &44 Ztp CODE: ,~~D/B ptiONE N: I understand Iliat fallure to Pay these fees msy ttsult in delay In compictton ot approval vf ttie ptoject or btho-t ible sRiictiotis. 0 If tilis fee agreetntnt is completed by someone other than the Sponsot (I.e., the pro,ject owtaer or A prinCipai In the finn spontoting the project), such as the Engineer designlhg the project, thtn written authorltation frbm the Spohsoi tppcffically authdritfng tht . , Agmt to exetute thly Pet, Agrftmptif is gttached to this t'ee A c"ment. • . SIONATvaP, 13y: • ,or-~ ~''ia o ~ ~ . (pItINT NAMB) ~ -MIN YELLQW Gt)P oKAN~ c y~r~~RS : fRetetne111ee 21t/9S - ADMIRALTY SAILBOATS SPO 509 926 1150 P.03 , , • s u '1° C3 K N ~ • i, ~ V U 111-7 UFnCE OF TE iE COUKTY ENf;[NFF.R • A b1V1SlON OF TI [B I'U8L1G wORKS DEPAR'iMENT Roiiald G. }iormactn, P.E., Counly Engitieer Mnnis M. Scott, F.E., Director A►GREEMENT TO PAY FEM ENGIN~ER'S AGItEEMENT rrUMBER . This agteement between Spokane County and ~00/1 ~ ~ name o penon) whvse interest in llie prvject is Ql.vl/d°9 9 (i.e. awner. agenc, etc.) is entereci into this day of 4k~ s p4 ~ 19 q' S. T}iis agreement is applicable to the project lcnown as: <Sv pC eC a 9 Z& r.• tlame ot Ti c num r That the individuals and parties named hetein as having an interest in the above described property or project agree to the following: 1. Reimburse Spokane County for project review and inspection fees as specified in Cliapter 9.14 of the Spokane Coutity Code. The fees w'tl( be based on actual salaty eosts incurced by Spokane County for project reviews and / or inspections plus a ten percent administrative charge, and will be billed monthty as aecrued. Any billing amounts dtle, including any expenses incurrcd ln the coltection of an overdue account, must be paid prior to the Couiity's accepcance of the project for filing. If a project is approved and/or fited witli a balance still awing, the unpaid balaiice shall be paici within 30 days of the invoice date. 2. 't'lie undersigneci 1grecs that tliese fees are due and payable upon receipt of the billing as specified above. 3. Any invoices not paid witliin 30 days of the invoice date will Ue considered delinquent. [f any otitstanding balance on the account for this project is not paid within 30 days of ttie invoice date, na further reviews of the project documents witl be conducted untid the entire aeeount balance is paid. Any balance on the account for this project not paid within 65 days of ihe invoice date may result in legal action oc the initiation of ather collection proeediires, including referral to a coliection ageney. Tlle Sponsor wilY be liable for any and all expenses incurred by the County for the collection of overdue accouiits. 4. The monthly bitling should be sent to die attention of: N11ME: AUllRESS: C1TY, S'I`ATE: ztP coDE: PliONIE L/ {,,i I understand iliat failure to pa' kne fees may resuit` in delay in comple or approvat of tiie projecc ar other possible satictiotis. Q If this fee agreernent is completed by someone other than the Sponsor {i.e., the projece owqer or a principal in the firm sponsoring the project}, such as the Engineer designing the project, then written authorizatlon from Qhe Sponsor spccfficaily anthorizing the Agcnt Qo execute th.is k'ee Agreement is attached to this ree t~ reement. SIGNATURE By: • (PR1NT NAMB) RE1`UR.ri YELLOW COPY 10 SPUKANE COUNTY ENGINEERS kkp\Aagccemta.[ea 211195 1026VV. $roadway Avc. • Spokane, WA 99260-0170 •(509) 456,3600 PAX: (509) 324-3478 TUT); (509) 324-3I66 i v V=~ AP i' LI CANTS ~tAM r~i ir~~ o~`-c ~~RIA~ C~ ~ aLDG T Q C1 ~-~Z , a~ OTHER ~ ~/1AILING ADD~CS~ ~ s l~ . T S , r~ Y.~ PARCEL ~ ~ S I , O L,//(~ PH4~IE - HOMF $ ~ ~ - ~I`S~`d ttoaD vaME ~ w~r, 1 ~1 t~/ PxoNE - woRK ~ - ~ ~ 3 J ' Zlic Collowin~ documcnts arc necded before che Spokaae Counry Cngincc~s Dcpartment can Uegi.n processi~g your variancc or i~uuding ~p~licacion as approved. (509) 456-3600 .yGREEYIE~IT TO PAY FEES have beea coilected. ~ RECORDED COPY OF DEED, DEED OF'I'RUST, cvntract or coaveying instrumeut. ~ese may be abcained Erom che Caunry Auditor, 2nd ~Ioc~r of ~the Counhouse. _ I.EG~L DESCRIP'I'ION of your acc~ easemenc. - L.ISTING 4F YAlI~tES of individuais who wiil be signi.ng che documents. These individual aames- shouid aopear as che persva(s) legally sign their name. " _ C~i`~'T .~.SSESSOR'S iY1AP which depicts che loc~tioa oc vour ~roperry. OwNERSHIP 1~IICR0•RIIN. T~iese may be obcained from che County ~ssessors, lst floor, of che Caurthouse, Jetferson edcrance, 2nd daor on the left. ~ The nec~ssary documents will be prer~ared by che Engiueer"s Dep~artmen[, Righ[-af-Way Section, upon provision of che i.at"ormacioa aoced above. You will be nocified w~en ct~e documencs are ready for signature. 1'tie documents may be sent to vou, ~owever, IT SHO(JI.D BE N4TED 'I~.T A,LL SIG~A'I'URES t1~fUST BE NOT.~RSZED. T'ne Enginee~s Deoartmenc does have nocaries availabie if you choose to sign the documents at our o~fice. ~ Please ca[I w~en ready Ptease maii w~ea ready vocice co Public Q ~ Right-oF Way COMME?vT'S , : ~ ly Risl~t-af-`Vav ,-~.gent ~r,~~ _ ronvacd co yvu ~'rom _ f ~ ° , - ~~~0«~.192" , r , ~ c ~ 9's~- . 9508290280 YOI. 17 6 G PAGE 161. . , . :.WR a€a . ~ ~ " . RE 0 t3ESIi ~1C~06 G) C1'1 . log In date: _ - /'~i~• 9S Parcei # Road NameMe: itAl AV{. Atic 29 3 14 PN '95 P~rpose: %i~repared By: E. D~NANUE . o~ »711'OR ~L. Req 13y: (Land Dev),~ 'A..{ SPOKt,NE COUNTY WASN. ' • qEPUTY NO, f . NOTICL TO TIILi PUl3LIC . RID WAI`IER, AGREEMENT AND COVENANT: KNOW AI..L MEN BY 7'f-fESE PRESENTS, That ~William L. Moore and Kathlyn L. Moore, husband and wife; and Carl E. Rafello and 1 s Mary Lou Rafello,.husband and wife, being the owners of the following described lancls in consideration of Mutual Beiielits now or to be liereafter derived, ~ do for themselves, tileir heirs, grantees, assigns and successors in interest Iiereby request and authorize Spokane County to include ifi-e,below described property in a Road Improvement bistrict (IZID) and to stipport ttie formation of a Road.Improvement Iaistrict for improvement of the road(s) described below by requesting and authorizing Spokane County to Place their nanie an a petition for formalion of a Roacl Iiiiprovement District pursuant to RCW 36.88.050; or by'requesting and autliorizing Spokane County to cast tiieir ballot in favor of a RID being formed under llie resolution rnetliod ptirsLiant to RCW 36.88.030, ancl/or by not filing a protest against the formation of a RID being formed under the alternative resolutian metiiod provided for in RCW 36.88.065 ancl Cliapter 35.43 RCW. If a RID is proposed for improvement of the road(s) described below, said owners and sticcessors further agree: (1) . that the improvements or constnictioii contemplated within the proposed RID are feasible, and (2) that the benefits to be derived from the furmation of the RID by tlte property included tlierein, togetlier witii the amount of any County participation, exceed the cost ancl expense of formation of the RID, and (3) that the property witliin the : ptAposed RID is sufficiently developed; provicled, tliemselves, tlieir Iieirs, grantees, assigns and successors stialt retain : the rigfit, ss autliorized under RCW 36.88.090, to object to any assessment(s) on the property as a result of the improYem ents Ca!!ed far in cor;unciion witti the Foranalion of a 1?ID by either the pe!il'son or resolutior. mcthoc! under Chapter 36.88 RCW and to appeal to the superior court the decision of the Boarcl of County Commissioners coitfirming the fi»al assessmeiit roll; provided fiirther, it is recognized that actual assessments may Yary from assessment estimate so long as they do not exceed a figure equal to the increased tnie and fair value the improvement(s) add(s) to the property. It is furttier acknowledged and agreed that at sucli time as a RID is createcl or any cotinty road improvement project is authorized by Spokane County, the improveiiients required shall be at tlie sole expense of the owners of property within the ItID or served by the improvements without any monetary participation by Spokane County. ' . The RID waivec contained in this agreement shall expire after ten (10) years fi-om the clate of execution below: The above conditions and covenant apply to the following described property: AS-SESSnItS pARCE- M.: 55175.0410 . That portion of Lot 5, F31ock 3 of CORBIN ADDITION TO GREENACRES, as per plat thereof recorded in Volume "S" of Plats, Page 30, Spokane County, Washington, ~ ' lying,South of Primary State Highway No. 2. a - ' tT r 1`~ C) 6 P, 4cE 1 6;~ 7'his Agreetnent appties to tiie iriiproveinent of Broadway Avenue , Itf No. 443-E by grading, draiiiiiig, surfacing, curbiiig, paving, sidewalk construclion iiiclucling traffic control facilities ancl related work. . Tliese requirerneiits are ailci sliali rtin witli the land and sliall be binding upon tlte owiiers, tlleir Ileirs, successors or assigns. 1 e a ~ • ~'1 IN W1TN SS W~ , REO~~, Iiave Iiereunto set Itand(s) aricl seal(s) tl»s day of . r , 199 5 . H :~1j%~'d.~*-~-._ / By: Y . , William L. Moore Carl E. Rafel~l/- . , ~ ~ . Ay: BY: _ ~ Kathfyn L. Moore q7yu Rafello STATB OF WASHINGTnN ) COUNTY OF SPUKANC ) ss I certify that I know or Iiave satisfactory eviclence that William L. and Kathlvn L. Moore • (Ware) the persoti(s) wlio appearecl before tiie, anci saiJ'nerson(s) acknowlecl6ed tliat they signed tliis instnimetit, and acknowlecl6ed it as their free and voluntary act, for tl►e uses aii(i purposes mentioned in tlie 'tnstrutneiit. f Uated tliis clay of 199 5 . ~ . . . -~'~t•!o`~ .ti'!,~~.~~ ~ ( • ~ .k~ r • R~~:~ = , ~Z ~ ,~~c TH~~S ~lotary I ublicd / :;4• r~'~~:.;,....; ~ .A = :=a~s . In ar~ d for llie State of Washington, l o~. Ud ~C '.,,..F, ~ \ o • ~ resiJiiig at Spokane. r ~'s;~~f~'~•~• 1q:.•~My a~~~~ointn~ei~t expires 9s , . , ~.4p ~y . p. • ~ " STATE OF WASHING'TON ) COUNTY OF c, e ) ss I certify that I know or have satisCactory evidence ttiat Carl E. and Mary Lou Rafello . Ozdare) the persoii(s) wlio arpeared before tne, and said'- person(s) ackrlowledged tllat they signecl this instrurnent, and acknowledged it as their free and voluntary act, for the uses and purposes mentioned in the instrument. ~ , Dated this day o1 : • . j~- G~ = • ~~:~r.~ ~ m - ~'~v' : - . • ~ -t. - 0 ~ ~ l~: ~t•:~ ~ t ~~(Y`-~~ , 2 Q 4 , . t~ • O~ ~ • . a,•...... , Notary Piibl~c ' Nashington, In arid fqr tlie Stateo• . . • ~ . ! e , ~ - ~ resicling'at , ~ ~ A' •~-+iiient exnirP4 11- 7- t 90 . ~ . . ' - 17 ~ ~ 4 ~ ~ AVENVE ' ~ 1sz'' ++a~ ~ ~'+!'j r ~ . •~'Y'.; rt~ 9~. 1 ~ p,~,~' ••t f~ r, ti, , t ~OE,,`p , • - 1 ~ avENUE ' 1 ` - ~ . c.~ ` , • t~ J `''1 • ~ , a~ _ ,r'r t, j ~ ~ ;`►N~ ` 'r ~~..~',t~ ~ ' ~ v ~ '•~~j►~o .+r~~~';, ~ , ~'~f . , , p S 0 cr m ~ . 20 ~ r~: 9 ~ ~ . . . ~ • ~ i • ' * • - -s ~ 'r ~fr \ r ' , i ~ ~ rtt~; ~ . . . . " ~t • ~ F r S' ~ . ~I\ ' • . { , ~ ~ : j ~ • _ ` _ -t~lO. . ~ Q-w O • Y:.' ~ ` , - ` . Zi ~ r_ ~ `j_ , ~-,•Cs , ~ ~ H~an. ~ n pa } i.,t~, x' 'i: •Q' 'tj~y~P ~^.~~~t''+`'~;~,~<n~~~.;a'+r.~Sf ~~;~k~.s~,•= _ . , . -i~ ' pi tlv~S.1 fjaluaOi~oP-'7~ c7i~~cfl~ h7; . ~ =::.'~-s',.~r-:`.` )n: ~ Q , - . , 6 . .Ai: n . . ~ i , ~~~.'•2"tTt,.,~'• ~if~'"~••. . . ~ V " - ~ , ~ ~ ~e " • ` a•'~ _ V ~ . . . ~ . • a ~a ~ ~ ~Q ~ . ` ~ ~ ~ " ~C ~ _ • ~ ~ . ~ ~ ~.4CIV ~ ry 1A . . ~ , _1`~ • * ~ ' ~"~a''.~ t ' • ,.1. . ; ! . •,,SS~••~yr'~_ > ti.~.'Y'i''•~. 'c . . • ' _ cr~~ ~',x' ~ ~ ,r~ ~ . _ ; p;;; • , t,,'r~„~ , ►w ' ~ ~•p i.~ . ~ ~ ' . . . ' ~.~j~ ~ ~ ~ ~ ~ • ~ , . - + ~ . ~ ' ~ - _ 4 i ~s r'y ~ ~ ~ M r► ~ ~ - . . . ti. • . - ~~I ~ , . , . . • . ~ . . . - • ' r~ A ► s ~.s w~ , ~ . w ` ~ ~ - • - . . /L . . , . - ~ . , . ~ . ~ ' V . . Q 0 . 4 . - . s: ~ • ' " ~ • ~ . - . . `;M1;• ~ - ~ - - ~ I r~., _n fi ' r , ' • ' , , v Y• ' ` ;r ~ , . . . . ` . , ~ . . . ~ . ~ - ~ 0 . , . , ~ ~ • - , O , . . v / ^ . ~ • W t r~ -1 • • ~ 't~+ ' ' Q , a•' S 4~ • ' _ . i . I ~ • ~ 4.~ t • ~ E , • . . . 4 . ' ' ~ . ' `ii~* ~ . ~ . • ' . ~ ~ . ' . ' ° =:,"i+, •,~✓J . ,y ' • . •.a~ ~ i' lk. !416', ~ d a- ~ ' .T ~ a,~:- ~ . 1, - . . , ~ • ~ ~ ~ 1 cr I • ~ , ~ r. . • , n 4 ; - ,.r1( , ' ~ , P. • ' ' ~ , ' . ( : . - •~r p ~ - . . , 1T;• • • ~ ' ' • ~ '"e~ ~ ~ _ . " . ~ ~ • ' . ~ . i. ~i,,1' ~ . , . ' ~ ~ . . t Sr i - • • . .ri-. 0• ~ ' ' I I L ~i,,ti•e , t~ ~.'7 O `r . ~J • O ~ ~ - G • ' ; ~ ' :~ii;i.~ l . ' . ~ ~ N . : ~ I ~ : - . ~ P " : ~ . , . ~ ~ ~ ~ ~ . ; , -r , ' • . . ~ ~ ~ .1 . : ~ ~ . • . ; j • . t • F I , . . iy : ~ ~ ~ I ~ ~•t i r~'• ' VI 1 . n' 1 ~ . . ,-r. . ~ R~f '#.r. •~~~w.~~~+•. ~ ~ ' ~ + . ~ . ~ ~ ~ . . ^ '~.'t . tJr~ ~ • . • . ' . ~ 40 1. • . ` ~ ~f~ ~ 5 ~ y~ ` :a~y 4-j ' '`aa~:~~,L~.' . ~•i~ r~,~: ~ • ~ ~ 3 ~ ~ 1 'r+~ • ~ ` • Y je r• jw;^ ~ ..R~L" l ~J~ • ^R11 v ~ • ~ ' ~ff{•'l ~'k• f . •t'~:~~~wr O ' ' ' • ~1` ,y~~~;>j~ • ~ i ra~..~,^'i y~:1~ ~.i \ / t ~ . . . , . ? . ~y~ • C • ~3~'y~ . .i, aA ~ j 1;:w~ . ~ ' • ei - ~ ~ a 1: ~ ~ r . Y , ' ~~+~••fW$~.~~ ' . ~t~ ~ . . . . :;ijpr , , vr~ : 7~i~yre • G♦ ,`~.r' ..~y~~, ~ ~~l- ;~1'~ ey' . .tf~/1 _ • . ~ , i`y_~: ~ • • ~ ,~«.f~, .P,) • a~~✓'~~ ~ . r ➢r" ~ V ~ ~~n. '~Y, . fi i ~ ~ Q r~ ~ - ~ ~ , ~ e• , e • ` , ~ • . ~ '~~~x• w 1 ~t r f ' ~ ~ i : ♦ / 7~ ~s o ~ . ✓ V~ ~ ~ . . ,T ' `Y*~ ~ , . ~ ~ ~ , s • . V i~ 1 , ~ • ~ 0 ~ 6+~~ :•~:~a~ ~ ~ ~ ~....~j...+'~ .,..,....~w~.~...~...... ~+~~r+..~.~ ~r ~,J y~r.~...y~/ 1 ~ • ' _ . ~ r-~' C, . ~ ! '~7- ' W = ' ~ . _ _ V ~ ' ~ • - C ~ 23 r ' " • / ' ~ , 3 8' 94," , ~ . ~ ~ /'S gs- _ " L/ - 7 ~ ~ ~p ~ ~ ' ~0• Y.-- S ~ ~ ~ . • • ~ ~ 4 ' ,~r~ ~ / 3l• i ~ _ _ _ - , ~ ` ! p ~ ~ `A ' i_ _ • ~ ~ ~ ~ 4 ~ ~ 3 j r , 9 ~ • ' ~ 7 t, ~ - . ~ ~ ~ ' V ^ . ~ . 194 ~f~~~t C - ^ ~ 1 40'71' , - • ~ • ' , ~ ~ • . c c.• ~ . . , . • 1- . J - qCArE . j s , q • . ~ . . _ s- ~ O . 4 ~ , ~ ~ `f (a ° ~ - 1► ~ . ' 4 j'y D 1..- 2 CA TA L i e D UN.. Y ~ • . 1vv . o EEO . i ~.3 r G R ~ ~ . . t ~ 25_5? . VA • ► ~ ~ k. - Q . ~ • ' f~ I ~ 13g_~g~ ` . ~ - - _ ` r . • 7 22rgZC ~0 4i~ ss . • ' t ~ ~ y• .i3 ' 12 1~ , • 1 ~ r 7 _ r 91-~ C ~ . . . SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS OF FACT, CONCLUSIONS AND ORDER INTRODUCTION This matter has come before the Hearing Examiner Committee on December 16, 1994, continued from the December 15, 1994 regularly scheduled hearing. The members of the Committee present are: Verona Southern, Chair, and Toni Nersesian. PROPOSAL The sponsor, Donwood Inc., requests approval of a Change of Conditions, ZE-139A-76, to an existing Regional Business (B-3) zone to allow a revised site plan and those uses permitted in the Regional Business (B-3) zone. FINDINGS OF FACT AND CONCLUSIONS 1. The property is generally located south of and adjacent to Interstate-90, approximately 800 feet east of Barker Road, in the West 1/2 of Section 17, Township 25 North, Range 45 E.W.M., Spokane County, Washington. 2. The Committee adopts the Planning Department Report as a part of this record. 3. The existing land uses in the area include single family residences, a truck stop, commercial uses, administrative offices and vacant, undeveloped land. 4. The proposed use is compatible with existing uses in the area. 5. The Comprehensive Plan designates this site as Urban and within the Priority Sewer Service Area (PSSA). The Urban category is intended to provide the opportunity for development of a"ciry-like" environment. The Urban category will typically be developed with residential, neighborhood commercial and light industrial uses with the more intensive land uses located near heavily traveled streets with public services available. The Urban category is intended to be implementeri by the Neighborhood Commercial (B-1) zone, while the more intensive commercial classifications, Community Business (B-2) and Regional Business (B-3) zones, will implement the Major Commercial category of the Comprehensive Plan. 6. The existing Regional Business (B-3) zone does irnplement and conform to the Comprehensive Plan. 7. The Arterial Road Plan designates Broadway Avenue as a Local Access Street with a recommended right of way width of 60 feet. 8. The existing zoning of the property described in the application is Regional Business (B-3) previously established as Freeway Commercial (FC) zoning in ~i • \ ' ' . •1976 and redesignated to Regional Business (B-3) on January 1, 1991 pursuant to the Program to Implement the Spokane County Zoning Code. The proposal does conform to the requirements of the existing Regional Business (B-3) zone. 9. The provisions of RCW 43.21 C(The State Environmental Policy Act) have been complied with and a Detennination of Nonsignificance (DNS) was issued. The Committee, after independent review, hereby adopts the DNS. 10. The legal requirements for public notice have been fulfilled. 11. The owners of adjacent lands expressed neither approval nor d.isapproval of the proposed use. 12. The applicant testified at the public hearing that he would accept the Washington State Department of Transportation (WSDOT) trip generation estimate of 1,600 vehicle trips per day for the site, as presently approved for ZE-139-76. The applicant further testified that he opposed Planning Deparnnent Condition #7 requiring a 36 inch high decorative wall along Broadway Avenue and Condition #2 requiring a subsequent public hearing for specific site plan review. 13. The applicant has demonstrated that conditions have substantially changed since the original zoning of this area and accordingly, the proposed change of conditions is justified. Specifically, changed conditions include the adoption of the Spokane County Comprehensive Land Use Plan, Spokane County Zoning Code, and the availability of public services and facilities. 14. The proposed use will not be detrimental to the public health, safety, morals or welfare especially in light of the conditions recommended by the reviewing agencies. 15. The Washington State Department of Transportation (WSD01) submitted a letter at the public hearing which included an appeal of the Planning Department's Determination of Nonsignificance (DNS) based on traffic issues and potential traffic generated by the proposal. The appeal of the DNS was withdrawn following testi.mony by the Office of the Spokane County Engineer, Planning Department, and the applicanL - 16. The Committee additionally finds/concludes: a. The Committee finds that the site plan of record submitted by the applicant is very general in nattm and subsequent public hearings are necessary for site plan review to determine if future site development complies with all applicable regulations and to ensure that adequate review is made and mitigating measures imposed through a public hearing and conditions of approval. The Committee finds it reasonable to implement the condition of approval recommended by the Planning Department to require subsequent public hearings for site plan review. b. The Committee finds that the landscaping requirements recommended by Planning Department Condition No. 7 should be modified. The Committee finds that the landscaping required by the Spokane County Zoning Code, in , HEC Order for ZE-139A-76 Page 2 , , - . • •add.ition to the 15 feet wide strip of Type III landscaping along Broadway Avenue, are appropriate for the site. The Committee finds the recommended 36" high meandering decorative wall may not be compatible with future development and uses on the site, and therefore should not be required. CONDTTIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL 1. All Conditions imposed by the Hearing Examiner Committee shall be binding on the "Applicant," which term shall include the owner or owners of the property, heirs, assigns, and successors-in-interest, 2. The following Conditions of Approval apply to the real property described below: Lots 2, 3, 4, and S lying South of Primary State Highway No. 2, Spokane to Greenacres, and all of Lot 9, Block 3, CORBIN ADDTTION TO GREENACRES, according to plat recorded in Volume " S " of Plats, Page 30, in Spokane County, Washington. EXCEPT those portions of said Lots 2, 3, 4, and 5 conveyed by Burlington Northern Inc. to the State of Washington by Quit Claim Deed dated June 4, 1976, under Record.ing No. 7609160303, and F.XCEPT those portions of said Lots 2, 3, 4, and 5 conveyed by the Great Northern Railway Company to the State of Washington for highway purposes by Quit Claim Deed dated Qctober 10, 1957, Recording No. 493871B and described as "Freeway Right of Way" and "Frontage Service Road Right of Way" only. HEARING EXAMINER COMMITTEE 1. Planning Department Condition No. 7 is modified as follows: A fifteen foot wide strip of Type III Landscaping shall be installed along both sides of the sites' Broadway frontage. 2. County Engineer Condition No. 2 is modified as follows: Applicant shall dedicate right of way to equa160 feet on Hodges Road south from Broadway Avenue to Appleway for right of way purposes. 3. County Engineer Condition No. 18 is modified as follows: This change of condirions is based on an original approval of ZE-139-76. It would appear that the applicant has approval of a baseline trip generation of approximately 1,600 trips per day on the existing approval. Since this request is based on any use on approximately 200,000 square feet of building, Spokane County Engineering would require this applicant at time of building permit to demonstrate through trip generation analysis that trip generation was not greater than the original baseline of 1,600 trips. Once the threshold of 1,600 trips is broken the applicant shall provide a full traff'ic analysis including mitigating measures prior to any future building penmuts being issued. This analysis would be done under the SEPA review process, this requirement to be implemented by the Spokane County Building Official and reviewed also by the Department of Transportation. HEC Order for ZE-139A-76 Page 3 , ~ . . ' ' • • 1 l SPOKANE COUNTY PLANNING DEPARTMENT 1. The proposal shall comply with the Regional Business (B-3) and Aquifer Sensitive Area (ASA) Overlay zones, as amended. 2. A public hearing review by the Hearing Body is required prior to any site development. The detailed site plan presented at a subsequent hearing must address concerns raised at the public hearing and address conditions of approval imposed by this hearing body. 3. Approval is required by the Planning Director/designee of a specific lighting and signing plan for the described property prior to the release of any build.ing permits. 4. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Planning I?irector/designee shall be submitted with a performance bond for the project prior to release of building penmits. Landscaping shall be installed and maintained so that sight distance at access points is not obscured or impaired. 5. Direct light from any exterior area lighting fixture shall not extend over the property boundary. 6. Landscaped areas of at least 100 square feet shall be located no more than 100 feet apart along building fronts facing street right of ways. In addition, all major public entrances to buildings shall be landscaped. The landscaping described above shall be Type III. Modifications to this condition may be allowed if approved by the Planning Department. 7. A meandering decorative wall 36 inches in height shall be constructed along the site's Broadway Avenue frontage. A fifteen foot wide strip of Type III Landscaping shall also be installed along both sides of the sites' Broadway frontage. (Modified per Hearing Examiner Committee Condition No. 1). 8. Twenty (20) feet of Type I Landscaping is required along all property lines abutting a residential zone. 9. Free standing signs shall be limited to 250 square feet in surface area and 35 feet in height. Free standing signs along Broadway Avenue shall be located near access points. Signs along Interstate-90 shall be pennitted as per the sign standards of the Zoning Code, provided that any free standing sign adjacent to Interstate-90 shall be limited to 350 square feet and 40 feet in height. 10. The Planning Department shall prepare and record with the Spokane County Auditor a Title Notice noting that the property in question is subject to a variety of special cond.itions imposed as a result of approval of a land use action. This Title Notice shall serve as public notice of the conditions of approval affecting the property in question. The Tide Nodce should be recorded within the same time frame as allowed for an appeal and shall only be released, in full or in part, by the Planning Department. T'he Title Notice shall generally provide as follows: The parcel of property legally described as [ ] is the subject of HEC Order for ZE-139A-76 Page 4 , , . ! ' a land use action by a Spokane County Hearing Body or Administrative Official on [ imposing a variety of special development conditions. File No. [ ] is available for inspection and copying in t6e Spokane County Planning Department. 11. Any subdivision of the property shall conform to state and county subdivision regularions. 12. Prior to the issuance of building permit, the applicant shall demonstrate to the satisfaction of the Planning Department that the owner(s) or representative(s) did negotiate in good faith with the Spokane County Transit Authority for the possible pmvision of facilities that would enhance the provision of public transit 13. The applicant shall comply with all conditions of ZE-139-76, except those modified herein. SPOKANE COUNTY DIVISION OF ENGINEERING AND ROADS Prior to issuance of a building pennit or at the request of the County Engineer in conjunction with a County Road Project/Road Improvement District, whichever action comes first: 1. Applicant shall dedicate 60 feet from Broadway south to Sprague Avenue for right- of-way. . 2. The applicant shall dedicate an applicable radius on Broadway Avenue and Hodges Road. (Modiried per Hearing Examiner Committee Condition No. 2) Prior to release of a building pernut or use of the property as proposed: 3. Access permits for approaches to the county road system shall be obtained from the Spokane County Engineer. 4. The applicant shall subYnit for approval by the Spokane County Engineer road, _ drainage and access plans. 5. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on-site sewage system plan and surface water dispiosal plan for the entire project, or portion thereof, if the development is to be phased. 6. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane Counry Engineer. The design, location and arrangement of parldng stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 7. To construct the roadway improvements stated herein, the applicant may, with the approval of the County Engineer, join in and be willing to participate in any petition or resolurion which purpose is the formation of a Road Improvement District (RID) for said improvement, pursuant to RCW 36.88, as amended. Spokane County will not participate in the cost of these improvements. This is HEC Order for ZE-139A-76 Page 5 , . ' applicable to that portion of Broadway Avenue to be realigned to and including Barker Road. 8. As an alternative method of constructing the mad improvements stated herein, the applicant may, with the approval of the County Engineer, accomplish the road improvements stated herein by joirung and participating in a County Road Project (CRP) to the extent of the required improvemenL Spokane County will not participate in the cost of these improvements. This is applicable to that portion of Broadway Avenue to be realigned to and including Barker Road. 9. The construction of the road improvements stated herein shall be accomplished as approved by the Spokane County Engineer. 10. The County Engineer has designated Typical Roadway Section Number One, Local Access standard for the improvement of Hodges Road, which is adjacent to the proposed development. This will require the addition of approximately 40 feet of asphalt along the frontage of the development. The construction of curbing and sidewalk is also required. 11. The County Engineer has designated Typical Roadway Section Number One, Local Access standard for the improvement of Broadway Avenue, which is adjacent to the proposed development This will require the addition of varying amounts of asphalt along the frontage of the development. The construction of curbing and sidewalk is also required. • 12. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construction and other applicable County stand.ards and/or adopted resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 13. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners Resolution No. 80-1592 as amended and are applicable to this proposal. 14. No construction work shall be perfornaed within the existing or proposed public right-of-way until a pennit has been issued by the County Engineer. All work within the public road right-of-way is subject to inspection and approval by the County Engineer. ~ 15. All required construction within the existing or proposed public right-of-way is to be completed prior to the release of a building permit, or a bond in an amount estimated by the County Engineer to cover the cost of construction of improvements shall be filed with the County Engineer. 16. Applicant shall sign and record Spokane County Notice to the Public No. 6 which specifies the following: The owner(s) or successor(s) in interest agree to authorize the County to place their name(s) on a petition for the formation of a Road Improvement District (RID) by the petition method pursuant to Chapter 36.88 RCW, which petirion includes the owner(s) properry, and further not to object, by the signing of a ballot, the HEC Order for ZE-139A-76 Page 6 , , - fonnation of a RID by the resoluti.on method pursuant to Chapter 36.88 RCW, which resolution includes the owner(s) property. If an RID is formed by either the petirion or resolution method, as provided for in Chapter 36.88 RCW, the owner(s) or successor(s) further agree: (a) that the improvement or construction contemplated within the proposed RID is feasible; (b) that the benefits to be derived from the formation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense of foimation of the RID; and (c) that the property within the proposed RID is sufficiendy developed. Provided further that the owner(s) or successor(s) shall retain the right, as authorized under RCW 36.88.090, to object to any assessment on the prnperty as a result of the improvements called for in conjunction with the forimation of the RID by either petition or resolution method under Chapter 36.88 RCW. This requirement applies to that portion of Broadway Avenue to be realigned to and including Barker Road. 17. There may exist urilities, either underground or overhead, affecting the subject property, including property to be dedica*.ed or set aside for futune acquisition. Spokane County assumes no financial obligation for adjustments or relocation regarding these utilities. Applicant(s) should check with the applicable udlity pwvveyor and the Spokane County Engineer to detemune whether applicant(s) or the utility is responsible for adjustment or relocation costs and to make arrangements for any necessary work. 18. This change of conditions is based on an original approval of ZE-139-76. It would appear that the applicant has approval of a baseline trip generation of approximately 1,300 trips per day on the existing approval. Since this request is based on any use on approximately 200,000 square feet of building, Spokane County Engineering would require this applicant at time of building pernut to demonstrate through trip generation analysis that trip generation was not greater than the original baseline of 1,300 trips. Once the threshold of 1,300 trips is broken the applicant shall provide a full aaffic analysis including mitigating measures prior to any future building peimits being issued. This analysis would be done under the SEPA review process, this requirement to be implemented by the Spokane County Building Official and reviewed also by the Department of Transportation. (Modified per Hearing Examiner Committee Condition No. 3) 19. The applicant shall comply with all conditions of approval of the original ZE-139-76. 20. If the Broadway realignment is not completed through an RID the applicant should be aware that Broadway Avenue could be right in/right out only. HEC Order for ZE-139A-76 _e . Page 7 , ~ . SPOKANE COUNTY DIVISION OF UTILITIES 1. Any water service for this project shall be provided in accordance with the Coord.inated Water System Plan for Spokane County, as amended. 2. A covenant agreement shall be signed stating: The owner(s) or successor(s) in interest agree to authorize the County to place their name(s) on a petition for the formation of ULID by petition method pursuant to RCW 36.94, which petition includes the owner(s)' property; and further not to object by the signing of a protest petition against the formation of a ULID by resolution method pursuant to RCW Chapter 36.94 which includes the owner(s)' property. PROVIDED, this condition shall not prohibit the owner(s) or successor(s) from objecting to any assessment(s) on the property as a result of improvements called for in conjunction with the fotmation of a ULID by either petition or resolution under RCW Chapter 36.94. 3. A wet (live) sewer connection to the existing area wide Public Sewer System is to be constructed. Sewer connection permit is required. (See No. 5) 4. Applicant shall submit expressly to Spokane County Utilities Department "under separate cover" only those plan sheets showing sewer plans and specifications for: public sewer connection are to be reviewed and approved by the Utilities Department prior to issuance of pemut to connect 5. Security shall be deposited with the Utilities Department for construction of the public facilities. 6. The Board of County Commissioners is in the process of evaluating whether Public Sewer should be extended outside the 15 year construction boundary and the terms of connection/extension of public sewer if allowed. SPOKANE COUNTY HEALTH DISTRICT 1. Sewage disposal method shall be as authorized by the Director of Utiliries, Spokane County. , 2. Water service shall be coordinated through the Director of Utilities, Spokane County. 3. Water service shall be, by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Health. 4. A public sewer system will be made available for the project and individual service will be provided to each lot prior to sale. Use of individual on-site sewage disposal systems shall not be authorized. 5. Use of private wells and water systems is prohibited. SPOKANE COUNTY DIVISION OF BUILDINGS 1. The applicant shall contact the Division of Buildings at the earliest possible stage in order to be informed of code requirements administered/enforced as authorized by HEC Order for ZE-139A-76 Page 8 , , - ' the State Building Caie Act, Design/development concerns include: addressing; fire apparatus access roads; fire hydrantlflow; approved water systems; building accessibility; construction type; occupancy classification; exiting, exterior wall protection; and energy code regulations. (Note: The Division of Buildings reserves . the right to confirm the actual address at the time of building permit.) SPOKANE COUNTY AIR POLLUTION CONTROL AUTHORTTY 1. All air pollution regulations must be met. 2. Air pollution regulations require that dust emissions during demolition, construction and excavation projects be controlled. This may require use of water sprays, tarps, sprinklers or suspension of activity during certain weather conditions. Ha.ul roads should be treated, and emissions from the transfer of earthen material must be controlled, as well as emissions from all other construction-related activities. 3. SCAPCA strongly recommends that all traveled surfaces (i.e., ingress, egress, parldng areas, access roads) be paved and kept clean to rrLnimize dust emissions. 4. Measures must be taken to avoid the deposition of d.irt and mud from unpaved surfaces onto paved surfaces. If tracking or spills occur on paved surfaces, measures must be taken immediately to clean these surfaces. 5. Debris generated as a result of this project must be disposed of by means other than burning (i.e., construction waste, etc.). 6. All solid fuel burning devices (wood stoves, pellet stoves, etc...) must comply with local, state, and federal rules and regulations. 7. SCAPCA Regulation I, Article, V requires that a Notice of Construction and Application for Approval be submitted to and approved by our Agency prior to the construction, installation or establishment of air pollution source. This includes any fuel fired equipment rated at greater than 400,000 BTU/hour (boilers, hot water heaters, ovens etc...). It also includes paint booths, and other sources of air contaminants. 8. Chapter 173-491 WAC requires that all new gasoline dispensing facilities with total storage capacity of 10,000 gallons or more must install and use State I vapor recovery equipment Prior to the installation of the storage tanks and vapor control equipment a Notice of Construction must be filed with and approved by SCAPCA. HEC Order for ZE-139A-76 Page 9 , , . ORDER The Hearing Examiner Committee, pursuant to the above Findings of Fact and Conclusion, APPROVES the application of Donwood Inc. for the Change of Conditions to an existing Regional Business (B-3) zone to allow a revised site plan and those uses permitted in the Regional Business (B-3) zone as described in the application ZE-139A-76, and as modified. Motion by: Toni Ne~rssesian Seconded by: Verona Southern Vote: (2-0) UNANIlViOUS TO APPROVE TBE CHANGE OF CONDITIONS HEARING CONIlvffITEE HEREBY ATTEST TO T'HE ABOVE FINDINGS, ORDER AND VO ATTEST: For WALLIS D. HUBBARD Planning I?irector V4 /Z/ B JOHN W. PE EkS ON Senior Planner DATE : Pursuant to Spokane County regulations, any aggrieved party has the right to appeal this written decision to the Spokane County Board of County Commissioners within ten (10) calendar days of the signing of this order. Upon receipt of an appeal, a public hearing will be scheduled. If you desire to file such an appeal, you must submit a written appeal, preferably on forms designed for such purpose, to the Board of County Commissioners, West 1116 Broadway, Spokane, WA 99260, along with a$210 processing fee payable to the Spokane County Treasurer. If you have any questions, please call the Planning Department at (509) 456-2205. HEC Order for ZE-139A-76 Page io , , . ' . E . , _ _ . . ~ RECEIVED • NO. ss 0422 A P R 131995 BEFORE TFiE BOARD OF C4UNTY COMMISSIONERS Coudy Engineeria~ OF SPORANE COIINTY, ~PASHINGTON " ) IN THE MATTER OF ZE-139A-761 CHANGE OF CONDITIONS REQUEST ) FINDINGS OF FACT, CONCLIISIONS ' TO ALLOW A REVISED SITE PLAN ) AND DECISION . AND THE USES OF THE REGIONAL ) BUSINESS ZONE ) APPLICAIVT: DONWOOD, INC. ) : THIS MATTER, being the consideration by the Board of County Commissioners of Spokane County ("Board" ) of the de novo appeal of the Spokane County Hearing Examiner Committee deciaion of December 16, 1994 approving an application for change of conditions in Planning Department File No. ZE-139A-76, to allow a revised site plan and those uses allowed in the Regional Business zone on approximately 20 acres of land (hereinafter referred to as the "proposal and the Board having conducted a public hearing on the proposal on February 21, 1995, and having fully considered the testimony and documents submitted, and the public record files regarding the proposal; and the members of the Board having individually visited or being familiar with the site and vicinity in question; and the Board having rendered an oral decision on March 7, 1995, denying the appeal subject to the entry of written findings and decision, hereby entera the following f indings of fact, conclusions and decision: FINDINGS OF FACT AND CONCLUSIONS 1. The proposal is generally located south of and adjacent to Interstate 90, approximately 800 feet east of Barker Road, in the West 1/2 of Section 17, Township 25 North, Range 45 EWM, Spokane County, Washington. ' 2. The proposal requests a change of conditions, in Planning Department File No. ZE-139A-76, from the site development plan approved in Planning Department File No. ZE-139-76, to allow a revised site development plan and those uses allowed in the Regional Business (B-3) zone on approximately 20 acres of land. 3. The Hearing Examiner Committee held a public hearing on the proposal on December 16, 1994, after which the Committee entered written finding9 of fact, conclusions and decision unanimously approving the proposal with new conditions. 4. On December 19, 1994, Donwood Inc. filed a timely written appeal of the Hearing Examiner Committee's decision with the Board of County Commissioners, objecting to the conditions of approval imposed by the Hearing Examiner Committee on the proposal. 5. On February 21, 1995, the Board held a de novo public hearing on the proposal, with additional written comments submitted to the Board by February 28, 1995 accepted as part of the record. 6. On March 7, 1995, the Board entered an oral decision denying the appeal, subject to the entry of written decision and findings. 7. The legal requirements for the public hearing held by the Board have been met. FINDINGS, DECISION AND CONDITIONS OF APPROVAL - 1 . , S - , • • B. The Board adopts Planning Department File Nos. ZE-139-76 and ZE-139A-76 as part of the record, ZE-139A-76 being a 9upplemental file to the original rezone file of ZE-139-76. 9. The oral testimony presented to the Hearing Examiner Committee on the proposal was not submitted to the Board or considered as part of the record. The Committee's written decision was considered by the Board only as a recommendation. 10. The Board takes official notice of the provisions of the Spokane County Comprehensive Plan; the Spokane County Zoning Code; the Spokane County Zoning Ordinance; the Program to Implement the Spokane County Zoning Code, as adopted pursuant to Resolution No. 85 0900 and as thereafter amended; and the - Spokane County Code. 11. On June 16, 1977, the Board of County Commisaioners of Spokane County, in ZE-139-76, rezoned the 9ite (originally encompassing approximately 27 acres) under the Spokane County Zoning.Ordinance from the Agricultural zone to the Freeway Commerc•ial zone, for development of a truck stop, motel and cafe in accordance with the development and traffic control plan (date stamped March 7, 1977 by the Planning Department) approved and the conditions of approval adopted in the same action. 12. At the time action was taken in ZE-139-76, the Spokane County Zoning Ordinance provided that property could not be rezoned to the Freeway Commercial zone unless a specific development and traffic control plan was approved for the site, with a further requirement that the site be developed and used thereafter only in accordance with such approved plan. 13. In 1985, pursuant to Resolution No. 85 0900, the Board of County Commissioners adopted the Spokane County Zoning Code, as well as the "Program to Implement" such code after a five year transition period. . 14. Effective January 1, 1991, pursuant to the cross-over 9chedule included in the Program to Implement, the site was designated under the Regional Business (B-3) zone of the Zoning Code, the most nearly equivalent zone to the Freeway Commercial zone of the Zoning Ordinance. 15. Under the Program to Implement, the approved site plan and conditions of approval adopted in ZE-139-76 continued to bind and restrict development and use of the site after the 1991 crossover unless and until modified through. approval of an application for change of conditions or a rezone of the site. Donwood Inc. was on notice of such restrictions by the terms , of the Program to Implement, as the applicant at the time of the 1977 rezone of the site,-and by indication of the symbol 11139-76C" on the official County zoning map of the site. 16. The conditional rezoning of property is authorized under the County's police power and does not require entry of an agreement between the County and the landowner to be enforceable. The Program to Implement does not require execution of such an agreement for conditions imposed on property rezoned under the Zoning Ordinance to continue in effect after the 1991 crossover. 17. In June, 1994, in ZE-22-94, approximately five acre9 in the northeasterly portion of the site was rezoned at the request ' of Tranco Industries, Inc. for food product manufacturing, . retail sales and other uses allowed in the Regional Business and Light Industrial zones. 18. On October 5, 1994, Donwood Inc. submitted an application to change the conditions imposed in the 1977 rezone in order to FINDINGS, DECISION AND CONDITIONS OF APPROVAL - 2 . . allow general B-3 uses on the remainder of the site. The applicant proposed a revised site plan in place of the site plan approved in ZE-139-76. 19. Pursuant to section 14.504.040 of the Zoning Code and section 1.44.040 of the Spokane County Code, the applicant's-request for change of conditions required a public hearing by the hearing examiner committee, and by the board of county commissioners on appeal, before approval could be granted. 20. Under chapter 1.44 of the Spokane County Code, the hearing body is authorized to place conditions on the applicant's request for change of conditions to protect the public health, safety and:-welfare, and to mitigate environmental impacts, considering the standards of the underlying zone and other adopted plans and regulations. Pursuant to section 11.10.128 of the County Code (adopting WAC 197-11-535), the hearing conducted by the hearing body is open to consideration of the environmental impact of the proposal and available environmental documents. 21. The Program to Implement requires that changes to the aite plan or conditions approved in ZE-139-76 proposed after the 1991 cross-over must minimally comply with the development standards of the B- 3 zone and be only for uses allowed in the B-3 zone. 22. The Board finds erroneous Donwood Inc.'s contentions that the 1991 cross-over zoning entitled it to develop the site under the B-3 zone for any of the uses allowed in the B-3 zone, without regard to the site plan and conditions approved for the 1977 rezone, or alternatively under conditions no more stringent than could be required under the standards of the B- 3 zone. 23. The revised site plan submitted by the applicant is general in nature and does not illustrate proposed uses, landscaping, setbacks, parking spaces, building height or other relevant information that would indicate that the site, upon development, will comply with the development standards of the Regional Business zone and applicable plans and regulations. 24. Land uses within the surrounding area include single family residences on urban-sized and acreage lots, and some commercial uses, located to the south; small businesses along Barker Road and single family residences to the west; commercial uses along Appleway and some aingle family residences to the south; and the Interstate-90 freeway and office uses located north of the proposal. 1 25. The proposal is located within the Urban category of the . Comprehensive Plan. The Urban category is intended to provide the opportunity for development of a"city-like" environment, implemented by various residential zones, along with neighborhood commercial, light industrial, and public and recreational facilities. The more intensive commercial u9ee, including uses allowed under the Regional Business zone and those associated with the more intensive commercial classifications are intended to implement the Major Commercial category of the Comprehensive Plan. The Urban category provides that mining, major commercial users, heavy industrial uses and intensive farming would not be compatible within Urban areas. 26. While the proposal is inconsistent with the Urban category of the Comprehensive Plan, recent zoning and development trends indicate that the area is transitioning from urban residential to commercial and light industrial uses. The site appears appropriate for general B-3 uses, with site plan review FINDINGS, DECISION AND CONDITIONS OF APPROVAL - 3 • , . • necessary to establish appropriate mitigating conditions and conditions of approval. 27. A Determination of Nonsignificance (DNS) was issued by the Planning Department for the proposal. In reviewing the environmental checklist submitted by the applicant, the responsible official for the Planning Department noted that many impacta from the proposal, particularly traffic, could not be determined without detailed site plan review. Prior to issuance of the DNS, the applicant was put on notice by the Planning Department that a detailed aite plan and other conditions of approval would probably be required for the proj ect . 28. Within the DNS comment period, the Washington State Department of Transportation (WSDOT), by letter dated December 2, 1994, requested that the re9ponsible official withdraw the DNS issued for the proposal, based on probable significant adverse environmental impacts from the development of B-3 uses on traffic infrastructure and air' quality, and require the applicant to perform a traffic study. These concerns were amplified in another letter from WSDOT to the Planning Department dated December 15, 1994. 29. WSDOT, in its February 28, 1995 letter to the Board, indicated that the DNS need not be withdrawn and a Determination of Significance isgued if the conditions of approval imposed by the Hearing Examiner Committee on the proposal were maintained. These conditions included detailed review of site development plans through a public hearing procesa, the preparation of a full traffic analyeis and the attachment of mitigating measures through SEPA once the potential vehicle trip generation from development of the site reached 1,600 vehicle trips per day. 30. The requirements of a traffic study, additional SEPA,review, - and public hearing on further development plans for the site, upon reaching the threshold of 1,600 cumulative trips per day, are reasonable based on the impact analysis contained in correspondence from WSDOT and County Engineer regarding development of possible B-3 uses; the need to assure aafe, convenient and efficient vehicular travel and access in accordance with the objectives, goals and standard9 expressed in adopted County plans and regulations; the lack of a detailed site plan; and the location of single family residences south and west of the site. 31. The public hearing.process provides greater-flexibility and opportunity for receipt of comment from public agenciea and members of the public on which to base conditions of approval and mitigation measures. Administrative site plan review by the Planning Department is appropriate for proposed site development that cumulatively generates less than 1,600 vehicle trips per day. 32. The proposal, as conditioned, bears a substantial relation to the public health, safety and welfare. 33. The issuance of a DNS at this time is.appropriate for the proposal, as conditioned for phased environmental review. DECISION The Board hereby denies the appeal by Donwood, Inc. (with certain modifications) and approves the applicant's request for change of conditions request for general B-3 uses and a revised site plan, subject to the following conditions: FINDINGS, DECISION AND CONDITIONS OF APPROVAL - 4 • IN REFERENCE TO THE ATTACHED FINDINGS, CONCLUSIONS ArTD DECISION, THE BOARD OF COUNTY COMMISSIONERS ADOPTS THE FOLLOWING CONDITIONS OF APPROVAL ATTACHED HERETO: SPOKANE COUNTY PLANNING DEPARTMENT 1. The proposal shall comply with the Regional Business (B-3) and Aquifer Sensitive Area (ASA) Overlay zones, as amended. 2. Detailed site plan review is required prior to any development of the site, in the manner provided by aection 1.44.050 of the Spokane County Code, to address concerns raised at the public hearing o; the proposal and conditions of approval imposed by the Board of County Commissioners. This review shall be done administratively by the Planning Director/designee as development occurs; provided, that once proposed development of the site cumulatively has the potential of generating more than 1,600 vehicular trips per day review ahall be conducted by the Hearing Body through the public hearing process. 3. Approval is required by the Plann'ing Director/designee of a specific lighting and signing plan for the described property prior to the release of any building permita. 4. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Planning Director/designee shall be submitted with a performance bond for the project prior to release of building permits. Landscaping-shall be installed and maintained so that sight distance at access points is not obscured or impaired. 5. Direct light from any exterior area lighting fixture shall not extend over the property boundary. 6. Landscaped areas of at least 100 square feet shall be located no more than 100 feet apart along building front9 facing street right of ways. In addition, all major public eritrances to buildings shall be landscaped. The landscaping described above shall be Type III. Modifications to this condition may be allowed if approved by the Planning Department. 7. A f if teen f oot wide strip of Type III Landscaping shall be installed along both sides of the site's Broadway Avenue frontage. 8. Twenty (20) feet of Type I Landscaping is required along all property lines abutting a residential zone. 9. Free standing signs shall be limited to 250 square feet in surface area and,35 feet in height. Free standing signs along Broadway Avenue shall be located near acces9 points. Signs along Interstate-90 shall be permitted as per the sign standards of the Zoning Code, provided that any free standing sign adjacent to Interstate-90 shall be limited to 350 square feet and 40 feet in height. 10. The Planning Department shall prepare and record with the Spokane County Auditor a Title Notice noting that the property in question is subject to a variety of 9pecial conditions imposed as a result of approval of a land use action. This Title Notice shall serve as public notice of the conditions of approval affecting the property in question. The Title Notice should be recorded within the same time frame as allowed for ~ an appeal and shall only be released, in full or in part, by the Planning Department. The Title Notice shall generally provide as follows: The parcel of property legally described as [ ] ia the aubjeet of a land use FINDINGS, DECISION AND CONDITIONS OF APPROVAL - 5 • . ' • action by a Spokane County Hearing Body or Administrative Official on [ I, imposing a variety of special development conditiona. File No. [ ] is available for inspection and copying in the Spokane County Planning Department. 11. Any subdivision of the property shall conform to state and county subdivision regulations. 12. Prior to the issuance of building permit, the applicant shall demonstrate to the satisfaction of the Planning Department that the owner ( s) or representative (s) has negotiated in good f ai th wi th. the Spokane County Trans i t Authority to provide any facilities needed to enhance public tran9it. SPORAIJE COUNTY DIVISION OF ENGINEERING AIJD ROADS Prior to issuance of a building permit or at the request of the County Engineer in conjunction with a. County Road ProjectjRoad Improvement District, whichever action comes first: 1. The applicant shall dedicate 60 feet from Broadway south to Sprague Avenue for right-of-way. 2. The applicant shall dedicate right of way to equal 60 feet on Hodges Road south from Broadway Avenue to Appleway for right of way purposes. Prior to release of a building permit or use of the property as proposed: 3. Access permits for approaches to the county road system shall be obtained from the Spokane County Engineer. 4. The applicant shall submit road, drainage and access plans for approval by the Spokane County Engineer. 5. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on-site sewage system plan and surface water disposal plan for the entire project, or portion thereof if the development is to be phased. 6. A parking- plan and traf f ic circulation plan shall be submitted and approved by the Spokane County Engineer. The design, location and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer shall be required for any portion of the project which is to be occupied or traveled by vehicles. 7. To construct the roadway improvements stated herein, the applicant may, with the approval of the County Engineer, join in and participate in the formation of a Road Improvement District (RID) for such improvements by the petition or resolution methods authorized under chapter 36.88 RCW, as amended. Spokane County will not participate in the cost of these improvement9. Thi9 is applicable to that portion of Broadway Avenue to be realigned to and including Barker Road. e. As an alternative method of constructing the road improvements stated herein, the applicant may, with the approval of the ~ County Engineer, accomplish the road improvements stated herein by joining and participating in a.County Road Project (CRP) to the extent of the required improvement. Spokane County will not participate in the cost of -these improvements-. This is applicable to that portion of Broadway Avenue to be realigned to and including Barker Road. - FINDINGS, DECISION AND . CONDITIONS OF APPROVAL - 6 . ' • 9. The construction of the road improvements stated herein shall be accomplished a9 approved by the Spokane County Engineer. 10. The County Engineer has designated Typical Roadway Section Number One, Local Access standard for the improvement of Hodges Road, which is adjacent to the proposed development. This will require the addition of approximately 40* feet of aephalt along the frontage of the development. The construction of curbing and sidewalk is also required. 11. The County Engineer has designated Typical Roadway Section Number One, Local Acceas standard for the improvement of Broadway Avenue, which is adjacent to the proposed development.. This will require the addition of varying amounts of asphal t along the f rontage of the development. The construction of curbing and sidewalk is also required. 12. All required improvements shall conform to the current State of Washington Standard Specifications for Road and Bridge Construction and other applicable County etandards and/or adopted• resolutions pertaining to Road Standards and Stormwater Management in effect at the date of construction, unless otherwise approved by the County Engineer. 13. Roadway standards, typical roadway sections and drainage plan requirements are found in Spokane Board of County Commissioners Resolution No. 80-1592 as amended and are applicable to this proposal. 14. No construction work shall be performed within the existing or . proposed public right-of-way until a permit has been issued by the County Engineer. All work within the public road right-of-way is subject to inspection and approval by the County Engineer. 15. Al1 required construction within the existing or proposed public right - of -way is to be completed prior to the release of a building permit, or a bond in an amount estimated by the County Engineer to cover the cost of construction of improvements shall be filed with the County Engineer. 16. Applicant shall sign and record Spokane County Notice to the Public No. 6 which specifies the following: The owner ( s) or successor ( s) in interest agree to authorize the County to place their name (s) on a petition for the formation of a Road Improvement District (RID) by the petition method pursuant to Chapter 36.88 RCW, which petition includes the owner(s) property, and further not to object, by the signing of a ballot, the formation of a RID by the resolution method pursuant to Chapter 36.88 RCW, which resolution includes the owner(s) property. If an RID is formed by either the petition or resolution method, as provided for . in Chapter 36.88 RCW, the owner(s) or successor(s) further agree: (a) that the improvement or construction contemplated within the proposed RID is feasible; (b) that the benefits to be derived from the formation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense of formation - of the RID; and FINDINGS, DECIS ION AND CONDITIONS OF APPROVAL - 7 : (c) that the property within the proposed RID is sufficiently developed. Provided further, that the owner ( s) or successor ( 9) shall retain the right, as authorized under RC'W 36.88.090, 'to object to any assessment on the property as a result of the improvements called for in conjunction with the formation of the RID by either petition or resolution method under Chapter 36.88 RCW. This requirement applies to that portion of Broadway Avenue to be realigned to and , including Barker Road. 17. There may exiet utilities, either underground or overhead, affecting the subject property, including property to be dedicated or set aside for future acquisition. Spokane County assumes no financial obligation for adjustmente or relocation regarding these utilities. Applicant(s) 9hould check with the applicable utility purveyor and the Spokane County Engineer to determine whether applicant(s) or the utility is responsible for adjustment or relocation costs and to make arrangements for any nece9sary work. 18. The applicant at the time of building permit application or submittal of a detailed site plan for administrative review shall demonstrate through trip generation analysis that trip generation from site development will not cumulatively exceed 1,600 vehicular trips per day, which is the baseline number of trips estimated by the Washington State Department of Transportation that would be generated by the original proposal approved in ZE-139-76. Once the threshold-of 1,600 trips per day would be exceeded by proposed site development, the applicant shall provide a full traffic analysis, including mitigating measures, priorto any future building permits being iseued. This analysis is to be done under the SEPA review process, and implemented by either the Spokane County Building Official or the Planning Department -(as deemed appropriate by the Planning Department) and reviewed by the Washington State Department of Transportation and County Engineer. 19. If the Broadway realignment is not completed through an RID the applicant is hereby put on notice that Broadway Avenue access could be right in/right out only. SPORANE COUNTY DIVISION OF UTILITIES 1. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane ' County, as amended. 2. A covenant agreement shall be signed by the owner 9tating: The owner ( s) or successor ( s) in interest agree - to authorize the County to place their name ( s) on a petition for the formation of a ULID by the petition method pursuant to RCW 36.94, which petition includea the owner(s)' property; and further not to object by the signing of a protest petition against the formation of a ULID by reaolution* method ~ pursuant to RCW Chapter 36.94 which includes . the owner(s)' property. PROVIDED, thie condition shall not prohibit the owner(s) or successor(s) from objecting to any - assessment (s) on the property as a result of improvements called for in conjunction with FINDINGS, DECISION A1VD CONDITIONS OF APPROVAL - 8 • the formation of a ULID by either petition or resolution under RCW Chapter 36.94. 3. A wet (lYVe) sewer connection to the existing area wide Public Sewer System must be constructed. A sewer connection permit is required. (See No. 5) J 4. The applicant shall submit expressly to the Spokane County Division of Utilitie9 "under separate cover" only tho9e plan sheets showing sewer plans and 9pecifications for: public sewer connection are to be reviewed and approved by the Utilities Department prior to issuance of permit to connect. 5. Security shall be deposited with County Utilities for construction of the public facilities. 6. Note: the Board of County Commissioners is in the proceea of evaluating whether Public Sewer ahould be extended outside the 15 year construction boundary and the terms of connection/extension of public sewer if allowed. SPORANE COUNTY HEALTH DISTRICT 1. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. 2. Water service shall be coordinated through the Director of Utilities, Spokane County. 3. Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Health. , 4. A public sewer system shall be made available f or the proj ect and individual service shall be provided to each lot prior to aale. Use of individual on-site aewage di9posal sy9tems will not be authorized. 5. Use of private wells and water systems is prohibited. SPORANE COUNfiY DIVISION OF BUILDINGS 1. The applicant shall contact the Division of Buildings at the earliest possible stage in order to be informed of code -requirements administered/enforced as authorized by the State Building Code Act. Design/development concerns include: addressing; fire apparatus access roads; fire hydrant/flow; approved water systems; building accessibility; construction type; occupancy classification; exiting; exterior wall . protection; and energy code regulations. (Note: The Division of Buildings reserves the right to confirm the actual address at the time of building permit.) SPOKANE COUNTY AIR POLLUTION CONTROL AUTHORITY 1. All air pollution regulations must be met. 2. Air pollution regulations require that dust emissions during demolition, construction and excavation projects be controlled. This may require use of water sprays, tarpe, sprinklers or suspension of activity during certain weather . conditions. Haul roads should be treated, and emissions from the transfer of earthen material must be controlled, as well as emissians from all other construction-related activities. FINDINGS, DECISION AND CONDITIONS OF APPROVAL - 9 ' 3. SCAPCA strongly recommends that all traveled surfaces (i.e., ingress, egress,- parking areas, access roads) be paved and kept clean to minimize dust emissions. 4. Measures must be taken to avoid the deposition of dirt and mud from unpaved surfaces onto paved surfaces. If tracking or spills occur on paved surfaces, measures must be taken immediately to clean these surfaces. 5. Debris generated as a result of this proj ect muat be disposed of by means other than burning (i.e., construction waste, etc. ) . 6. Al1 solid fuel burning devices (wood stove9, pellet stoves, etc...) must comply with local, state, and federal rules and regulations. 7. SCAPCA Regulation I, Article, V requires that a Notice of Construction and Application for Approval be 9ubmitted to and approved by our Agency prior to the construction, installation or establishment of air pollution source. This includes any fuel fired equipment rated at greater than 400,000 BTU/hour (boilers, hot water heaters, ovens etc...). It also includes paint booths, and other sources of air contaminants. 8. Chapter 173-491 WAC requires that all new gasoline diapensing facilities with total etorage capacity of 10,000 gallons or more must install and use State I vapor recovery equipment. Prior to the installation of the etorage tanks and vapor control equipment a Notice of Construction must be filed with and approved by SCAPCA. ' BY THE ORDER OF THE BOARD-THIS /10 DAY OF APRIL, 1995. BOARD OF COUNTY COMMISSIONERS OF SPO COUNTY, WASHINGTON .E. Chil er Chairman 1 ~ P i i D. Harrie St e asson COO Vote of the Board of Spokane County Commissioners as follows: Commissioner D.E. Chilberg - aye Commissioner Phillip D. Harris- aye Commissioner Steven Hasson - aye ATTEST: WILLIAM E. DONAHUE . Clerk of e Board By : ~i , osanne ntagu Deputy C rk • , ..l.. w , . , . , . , . ' • Y ~ ~ ";sr' _ . . . ~ . , " i' 'M FINDINGS, DECISION AND • ' . ` CONDITIONS OF APPROVAL - 10 OFFICIAL NOTICE FOR DATE AND PLACE FOR COMMENCING AN APPEAL - NOTE: Pursuant to WAC 197-11-680(5), notice is hereby given by the Board of County Commissioners in conjunction with the approval of the above-referenced matter that: (1) Pursuant to Section 14.402.180 of the Spokane County Zoning Code, the time limit for commencing an appeal of the approval of the above-referenced matter is thirty (30) calendar days from the Board of County Commissioner's execution of the above Findings of Fact, Conclusions and Decision. (2) The time frame for appealing any SEPA issues with respect to the approval of the above-referenced matter is thirty (30) calendar days after the execution of the above Findings of Fact, Conclusions and Decision. A notice of intent to raise SEPA issue9 by judicial appeal i9 required and must be filed with Wallis D. Hubbard, Director ' of Planning, West 1026 Broadway, Spokane, WA 99260, within thirty (30)~calendar days after execution of the above Findings of Fact, Conclusions and Decision. (3) The appeal of either the approval of the above-referenced matter or any SEPA issues must be filed in the Spokane County Superior Court or a court of competent jurisdiction as provided by law. FINDINGS, DECISION AND ~ CONDITIONS OF APPROVAL - 11 . _ - ~ ~ . ~ ~ _ , , ` ~ - ~ - - . ~ - , ~~a+ r-. „/t~ ` . , -»+s'' -t 1 ~ .S'~M i a~~~ + ~ - ~ r„ -'`ti: - ~ ' ' ~=,~~„t. ' . ~ _ i'.' . : . '.E".~, A ~ . . r . a . w~- ~ - . ~ - • ~ F . R`. R " j . . ~ _ F . ~ v ' - ~ - ~ ' ,i~ t . ~ i ' ~ ~ ~ ~ ! ` ti . ~ ~ •~+i,~ ~ ; r{ ~ . ~ . . ; ~ : , ~ - ~ i ~ = i~ , ~ ~ ~ k ~