16-091.16 Meridian Construction: City Hall It,— Oct l . ( (p l , SPOKANE VALLEY CITY HALL ,i �,, Architects West Inc. • hi + , Architecture • Landscape Architecture CHANGE ORDER-016 Issue Date: 8/2/2017 I xpr ct.roorP than gr(at arehiter tore PROJECT OWNER CONTRACTOR DISTRIBUTION X Spokane Valley City Hall City of Spokane Valley Meridian Construction Doug Powell X 10210 E.Sprague 11707 E.Sprague Ave. 12310 E Mirabeau Parkway Mark D'Agostino X Spokane Valley,WA 99206 Suite 106 Suite 100 Steve Roth X Spokane Valley,WA 99206 Spokane Valley,WA 99216 Jim Paras X CONTRACT FOR: GENERAL CONSTRUCTION Todd Ottmar X CONTRACT DATE: 5-20-2016 You are hereby directed to make the following changes in the contract: REFERENCE DESCRIPTION AMOUNT COP-075 (CCD-016) Furring in 8111 Fire Riser Room $2,324.71 COP-079R1 (CCD-019) Column Relocation $5,772.47 COP-086R1 (CCD-025) Power for TV Cameras $2,568.67 COP-098 (CCD-038) Heat Trace Cabling $9,903.56 COP-103 (CCD-037) Power to Storefront Doors $2,678.01 COP-114 (PR-036) Power Outlet Adjustments $1,635.62 COP-116 • RFI-135—Finish top edge of window sill in lobby $1,786.28 • RFI-136—Curb ramp Truncated Domes,7 locations(No Cost) • RFI-137—Add one can light to chamber COP-118 (CCD-045) Remove and Replace Sprague Approach $5,765.99 COP-119 Added North Plater Tree $1,095.53 COP-123 Power to Irrigation Controller $3,912.63 COP-124 Change Upper Cabinets from 12"to 15"Depth $2,738.82 COP-128 (PR-037) Delete Concrete Stain ($1,623.00) COP-129 (PR-038) Second Floor Reception Divider • $655.12 COP-139 Re-configure pre-cast cornice at grid K-5 $771.25 TOTAL $39,985.66 The Original Contract Sum was: $9,742,700.00 Net Change by Previously Authorized Change Orders: $191,800.07 The Contract Sum prior to this Change Order was: $9,934,500.07 { The Contract Slim will be increased by this Change Order in the amount of: $39,985.66 The new Contract Sum including this Change Order will be: $9,974,485.73 The Contract time will be undhanged/Changed by: 0 days The Date of Substantial Completion as of the date of this Change Order therefore is: 8/31/2017 ARCHITECT CONTRACTOR OWNER REPRESENTATIVE Architects West,Inc. Meridian Cohstruction City of Spokane Valley 210 E.Lakeside Ave. 12310 E.Mirabeau Parkway,Ste 100 11707 E.Sprague Ave.,Suite 106 Coeur d'Alene,ID 83814 Spokane Valley,WA 99216 Spokane Valley,WA 99206 SIGNATURE: SIGNATURE: SIGNATURE: ' %Alia jik.CaAtiotA,..., l' i( ! DATE: 8/2/2017 DATE: V•71R- DATE: (29/1 7 1509—SPOKANE VALLEY CITY HALL CHANGE ORDER-016 —8/2/2017 Page l of 1 210 East Lakeside Avenue I Coeur d'Alene,Idaho 83814 I ph 208-667-9402 I fx 208-667-6103 I www.archltectswest.com , 1 � `£ Architects est Ir,c. SPOKANE VALLEY CITY HALL /d a Archpectorei • LandscapeArchipcture CHANGE ORDER-016 REV-1 4' .", Issue Date: 9/1/2017 r Xpert more that l*vat irchitecture. PROJECT OWNER CONTRACTOR DISTRIBUTION X Spokane Valley City Hall City of Spokane Valley Meridian Construction Doug Powell X 10210 E.Sprague 11707 E.Sprague Ave. 12310 E Mirabeau Parkway Mark D'Agostino X Spokane Valley,WA 99206 Suite 106 Suite 100 Steve Roth X Spokane Valley,WA 99206 Spokane Valley,WA 99216 Jim Paras X CONTRACT FOR: GENERAL CONSTRUCTION Todd Ottmar X CONTRACT DATE: 5-20-2016 You are hereby directed to make the following changes in the contract: REFERENCE DESCRIPTION AMOUNT COP-075 (CCD-016) Furring in 8111 Fire Riser Room $2,324.71 COP-086R1 (CCD-025) Power for TV Cameras $2,568.67 COP-103 (CCD-037) Power to Storefront Doors $2,678.01 TOTAL $7,571.39 The Original Contract Sum was: $9,742,700.00 Net Change by Previously Authorized Change Orders: $191,800.07 The Contract Sum prior to this Change Order was: $9,934,500.07 , The Contract Sum will be increased by this Change Order in the amount of: $7,571.29 The new Contract Sum including this Change Order will be: $9,942,071.36 ' The Contract time will be unchanged/Changed by: 5 days The Date of Substantial Completion as of the date of this Change Order therefore is: 9/5/2017 ARCHITECT CONTRACTOR OWNER REPRESENTATIVE Architects West,Inc. Meridian Construction City of Spokane Valley 210 E.Lakeside Ave, 12310 E.Mirabeau Parkway,Ste 100 11707 E.Sprague Ave.,Suite 106 Coeur d'Alene,ID 83814 Spokane Valley,WA 99216 Spokane Valley,WA 99206 SIGNATURE: SIGNATURE• ` SIGNATURE: i/s MOILL C t/t _ rrar- MOIA -...•••••... DATE: 9/1/2017 DATE: a( DATE: '� ► `V/ /1 1509—SPOKANE VALLEY CITY HALL CHANGE ORDER-016—REV-1 —9/1/2017 Page 1 of 1 210 East Lakeside Avenue I Coeur d'Alene,Idaho 83814 I ph 208-667-9402 I fx 208-667-6103 I www.architectswest.com