Loading...
2017, 10-06 NOA for ALT-2017-0002P SUPERIOR COURT of WASHINGTON for SPOKANE COUNTY In the Matter of REVISED Notice of Application for Final Binding Site Plan Alteration City of Spokane Valley File No: ALT -2017-0002 STATE of WASHINGTON County of Spokane AFFIDAVIT of PUBLICATION NO. LEGAL NOTICE MICHAEL HUFFMAN being first duly sworn on oath deposes and says that he is the EDITOR of the Spokane Valley News Herald, a weekly newspaper. That said newspaper is a legal newspaper and it is now and has been for more than six months prior to the date of publication hereinafter referred to, published in the English language continually as a weekly newspaper in Spokane County, Washington, and it is now and during all of said time was printed in an office maintained at the aforesaid place of publication of said newspaper, which said newspaper had been approved as a legal newspaper by order of the Superior Court of the State of Washington in and for Spokane County. That the following is a true copy of a Legal Notice as it was published in regular issues commencing on the 29th day of September, 2017, and ending on the 29th day of September, 2017, all dates inclusive, and that such newspaper was regularly distributed to its subscribers during all of said period: REVISED Notice of Application for Final Binding Site Plan Alteration City of Spokane Valley Date of notice: September. 29, 2017 File No: ALT -2017-0002 Proposal: Final Binding Site Plan alteration of BSP -03-03 to revise the Riparian Man- agement Buffer Zone and Shoreline Buffer consistent with the City of Spokane Valley's current Shoreline Master Program and. Critical Areas Regulations and modify the- associated heassociated dedication language; modify the dedication language restricting buildings within the 100' transmission line easement; correct and clarify the existing drainage easements; and other minor corrections. Applicant: Pinecroft, LLC, 12310 E Mira - beau Parkway, Suite 150, Spokane Valley, WA 99216 Property Owner: Pinecroft, LLC, 12310 E Mirabeau Parkway, Suite 150, Spokane Valley, WA99216 Application Date: September 10, 2017 Determination 01 Completeness: September 19, 2017 Decision -Making Authority: >`k,ptA E /t V4 sr. \55\0 N E, •. )" i NO-TARY • pj,UC ? o City of Spokane Valley ; k_ Written Comments: Agencies, tribes, and .5 c3 Ca v the public are encouraged to review and cps 05.16-1 . provide written comments on the proposal/ f y, •......... •�\` 0� project and its probable environmental 0 �` t' impacts. All comments received by October 1// 6, 2017 which is fourteen (14) calendar days 15 \\ of the date of this notice will be considered 111 I 1 { 1 \ prior to making a decision on this project. Further, any person may request a copy of the decision for the proposal once made. Parcel Number/Site Address/General Location: Parcel number 45033.5008, 45033.0000, 450330809, 45033.0810, 450330611, 45033.0815,45033.0816, and 45033.0817; addressed as 12809 through 13009 E Mirabeau Parkway and 13109 E Pinecroft Way, (note: not all parcels are addressed); located approximately al the NE intersection of E Pinecroft Way and Mi- rabeau Parkway; further located in the SW 'A of Section 3, Township 25 North, Range 44 East, Willamette Meridian, Spokane County, Washington. Comprehensive Plan: Mixed Use (MU) Existing Zoning: Mixed Use (MU) Other Permits: City of Spokane Valley Engineering approval and City of Spokane Valley final plat approval Required Studies: None requiredat time of this notice of application. Environmental Review: The Planning Division has reviewed the proposal/project and has determined that the,projectis categorically exempt pursuant to WAC 197-11-800 and Section 21.20.040 of the City of Spokane Valley Municipal Code (SVMC) from environmental review under the provisions of the Stale Environmental Policy Act (SEPA). Applicable Development Regulations: SVMC Title 21 Environmental Controls, SVMC Chapter 21.50 Shoreline Regula- tions, SVMC Title 20 (Subdivisions), SVMC Title 19 (Zoning Regulations), Spokane Valley Street Standards, the Regional Stormwater Manual, the Sewer Construc- tion Ordinance, and the Spokane Regional Health District regulations are the primary development regulations applicable to the site. Public Hearing: Pursuant to SVMC'Sec- llon 20.50.020, the City of Spokane Valley shall be the decision -maker on a proposal. Therefore, the proposal is not subject to a future public hearing. Comment Period Ends: October 6, 2017 @ 5:00 pm. Staff Contact: Lori Barlow, AICP, Senior Planner 10210 E. Sprague Ave., Spokane Valley, WA 99206; (509) 720-5335 or by email at LBarlow@spokanevalley.org. Carrie Koudelka, CMC Spokane Valley Deputy City Clerk PUBLISH: 9-29-2017 S 4 BSC( e ED and k'0to before me his 29th day of September, 2017 State of Washington County of Spokane I certify that I know or have satisfactory evidence that Michael Huffman is the person who appeared before me, and said person acknowledged that he signed this instrument and acknowledged it to be his free and voluntary act for the uses and purposes mentioned in the instrument. Jol ne Rae Wentz Title: otary Public My appointment expires: 05-16-2019