16-091.18 Meridian Construction: City Hall f ' SPOKANE VALLEY CITY HALL Architects West inc. /J i r/ ,, Archlteciur. •LaalacapeArchitecbtre CHANGE ORDER-018 REV-2 Issue Date: 11/1/2017 i-,,c,,r t k , ;1“1,4t,1^-rt-III.Ctti re PROJECT OWNER CONTRACTOR DISTRIBUTION X Spokane Valley City Hall City of Spokane Valley , Meridian Construction Doug Powell X 10210 E.Sprague 11707 E.Sprague Ave. 12310 E Mirabeau Parkway Mark D'Agostino X 1 Spokane Valley,WA 99206 Suite 106 Suite 100 Steve Roth X Spokane Valley,WA 99206 Spokane Valley,WA 99216 Jim Paras X CONTRACT FOR: GENERAL CONSTRUCTION Todd Ottmar X CONTRACT DATE: 5-20-2016 You are hereby directed to make the following changes in the contract:- REFERENCE DESCRIPTION AMOUNT COP-067 'Curved Chamber Wall $12,717.97 COP-076, Attic Sealing for Pressure Test $14,160.09 "COP-077fi Roller Shade Changes $16,488.09 COP-117 Elevator Door Trims $1,860:48 , COP-121 Added BDD to EF1 $1,230.28 COP-122 Elevator Pit Ladder and Fire Extinguisher $994.19 COP-125 Add Z-Band Video $3,471.72 COP-127 Relocate Data Outlet at Central Reception $281.98 COP-130 Floor Edge Angle at Windows $1,599.88 COP-131 Interior Signage Changes $1,206.17 COP-133 ,Delete Metal Panels at Reception Casework ($74&61) COP-134 Center Chamber Can lights, $936.68 COP-137 Added Electric Strikes $2,178.66 COP-138 Pre-Cast Cornice Modifications at'Gri&G-5.3 $870.94 COP-142 Fire Rated Elevator Lid $4,839.49 COP-143 Move Railingat Stair S2-02 $1,672.11 COP-144 i Added Trim Piece at bathroom light>;ix'tures $629.93 COP-146 Extend Power for Irrigation Controls $895.93 COP-147 Guardrail Horizontal Bar $2,474.50 COP-149 Relocate Cable Tray Brackets in TV Studio $503.32 COP-151 Dias Cable Tray $2,391.81 COP-152 ' ADA Height change at bathroom sinks $1,485.72 COP-153 Elevator Power Module Changes $1,207.17 COP-154 L&I Elevatoriamb Fire Rating $6,725.58 COD-155 Added Refrigerator GFCI Breaker $330.89 COP-157 Added GFCI Panel Breakers for Water Coders $675.89 COP-160 Masonry Cracks $1,419.62 ' TOTAL $82,500.48 °The Original Contract Sum was: $9,742,100.00 i. Net Change by Previously Authorized Change Orders: $231,785.63 TheCo'ntract Sum prior to tlrls.Change Order was: $9,974,485.63 The Contract SUm Will be increated by this Change Order in the amount of: $82,500.48 The new Contract Sum including this Change Order will be: - $10,056,986.11 The Cohtract time will be unchanged/Changed by: O days The Date of Substantial Completion asvf the date of this ChangeOrder therefore Is: 915/2017 �- _ -. ,. - .. -x - _ _ -_ _ 15b9 SPOKANE VALt CITY HALL CHANGE 8.R'liER'=018 REV-2 -11/1/2017 Page 1 of 2 210 East Lakeside Avenue 1 Ccfetird'Alene,16116 83814 J ph 208-667-9402 I fx208.-667-6103 I Www.areMitactswest.coni ARCHITECT CONTRACTOR OWNER REPRESENTATIVE Architects West,Inc. Meridian Construction City pf Spokane Valley 210 E.Lakeside Ave. 12310 E.Mirabeau Parkway,Ste 100 11707 E.Sprague Ave.,Suite 106 Coeur d'Alene,ID 83814 Spokane Valley,WA 99216 Spokane Valley,WA 99206 SIGNATURE: SIGNATURE: SIGNATURE: DATE: 11/1/2017 DATE: •✓ DATE: 159-SPOKANE VALLEY CITY HALL CHANGE ORDER-018 REV2—11/1/2017 Page2of2 210 East Lakeside Avenue I Coeur d'Alene,Idaho 83814 I phs208-667-9402 fx 208-667-6103 I }NWW.architectswest.com i�-