Loading...
39419 CORRESPONDENCE/PLAT CHECKLIST/ ~ , I c S P O K A N E U N T Y DIVISION OF ENGINEERiNC AND ROADS A DMSION OF THE PUBUC WORKS DEPAR7MENT William A. Johns, P.E., County Engineer May 6, 1999 Robert Bonuccelli PO BOX 141449 Spokane WA 99214 Dear Bob: I have reviewed the information available concerning the traffic issues for the convenience store proposed for your property located adjacent to Sullivan Rd. and Marietta Ave. The primary source for trip generation is the Institute of Transportation Engineer's Trip Generation Manual (TGM) and is routinely used by the Transportation Engineering Section. The TGM contains information on trip generation rates and various other trip characteristics based on surveys from across the country. The TGM has two land-use codes which are appropriate for developing traffic projections for the above mentioned convenience store. Land-use #853 (Convenience Store w/ Gasoline Pumps) and #845 (Gasoline/Service Station w/ Convenience Market) have trip characteristics reported in the February,1995 update to the TGM; Tables VII-9 and VII-7 respectively. The reported pass-by rates for these land uses are 66% for a Convenience Store wl Gas Pumps and 56% for a Gasoline/Service Station wl Convenience Nlarket. The average pass-by rate for these two land-uses is 61 As a comparison, we typically use 50% in most traffic studies. Taking into account the location of the site and existing traffic patterns we have determined that a 70% pass-by rate would be appropriate for a convenience store on the Banuccelli property. This is a higher rate than provided in the ITE Trip Generation Manual and the rate typically used by Spokane County. The 70% rate is believed to conservative enough to ensure all trips are counted, yet provides for the exceptional characteristics of the site. I hope this provides you with the needed rationaJe in determining the pass-by rate for the convenience store. If you have any questions or need anything else, please don't hesitate to give me a call. Sincerely, CRS~ ~i e Pat Harper Transportation Engineering Supervisor 1026 W. Broadway Ave. • Spokane, Wi1 99260-0170 •(509) 477-3600 FAX: (509) 324-3478 TDD: (509) 324-3166 dib i MEMORANDUM DATE: September 3, 2--3 TO: Scott Engelhard, Jim Haines, P.E. FROM: Bill Hemmings, P.E.* ~ ~ SUBJECT: BSP 64-98 - Phase II Building Permit - Mitigation Fee &WmGawrr As provided for in Resolution 99-0926, authorizing a development agreement between Robert Bonuccelli and Spokane County for road improvements in connection with BSP 64-98, I have calculated the fee associated with the 21,621 ft2 warehouse building shown as phase 11 on the site plan for the Phase II Building Permit. The mitigation fee, as shown below, is $8,432.78 and is based on the size and use of the proposed building. Since the fee is calculated using the specific use, any change in use or in size of the building will require the fee to be recalculated. This fee does not include the Phase III building. Square footage effective trip of building X generation rate for X Cost / trip = mitigation fee (in thousands) specific land use 21.621 X 0.51 X $764.76 = $8,432.78 Amount prepaid on Phase II building was $12,375.64 -$8,447.22 =$4,128.42 (Paid 8-3-2001) Total amount due for Phase II Building: $ 8,432.78 -$4,128.42 =$4,304.36 If you have any questions, please call me at 477-7246. VO ti Pass-by Effective Trip rate / reduction trip rate / Use ITE code ksf ksf Convenience Store w/ Gas Pump 851 60.61 70 24.24 Restaurant 831 7.49 25 5.62 Tire Store 848 4.12 25 3.09 Drive-in Bank 912 54.77 60 21.91 Warehouse 150 0.51 0 0.51 Business Park 770 1.29 0 - 1•29 ksf = 1000 ft2 2 ~ ' ~ a ~ ' ~ p~ p~ ExiSTtNc / . / ( ~ Wf(RE HYDRANI 1 A.~ESGRIPTIAN; ~ 1. CANiRACTOR 10 YERIFT ~pCA~IOM OP All EXi5TIN0 UfIUT1E5 ~ ~ OJfiRE HYORANf . PR10R TO CONSfP17CT1pN, ~ . ~ 2 CONTAACTON f0 Pf10Y[DE A I+p,V,C, SLfEVE 10 AlL ~AMOSCAPED / ' PARCEL B EX19T[NG ROA011AY AREAS AS SHOWN pN pAANINCS FOR SPA[MILER SYSIEY. CAP t ~ iAACT 2. BIOCK 1, TOGETIEH wiTN THf EASi 1Q00 FEET ~i P A R C L C ~ . ~ I MaRR ENOS COORO!lIAtE LOCAiION W[TH SPft1N%lEA CONTA. ~ ' TRACT 7. BCOCK 1, BINOIMC SITE PIAN BSP-M-94 PER ~ I 1 PPOVIDE 2'-6' M1R RADIUS ON AlL CUR93, iYp(CA~ UJI.O. PUT TIQAEOF NEC9ppE0 IX VOIIJHE 2 QF 81NOIN0 SITE PLANS, ' I ~ PACE J$ LGCATEO IN iHE NOpTNE~St pUANTEp OF SECTION 11, 4. ALL STiiEETNppK 10 BE COORD(NATEp w(TI{ iME C(i1' fNCIkEfHS Oii1CE . fOWNSN(P 27 HORTH, RANCE H EAST, W.4„ $PQKAME C~UN1Y, ' ' • WA3NINC?ON; . ~ S PROVIO[ $ICNACF 0 EA, MANOICAP PApKINC 4TALL YOUNTEO ' , E%CEPi TI(E f10pTH ]80,00 ifET Oi TNE WEST I]8.00 PfiHT ( OM A Y$pUApE STL PIPE N/ t/~~ ENO CA~ WEl4ED TO T07 ~ • pi $AfD TRACT Z , CALV. A~iER fA0R1CAilON. S1CN TO BE 12' a IA' W/ T}~ ~ AND E%CEAi TMt NQRTH 780,00 ![6T Oi TNB EASi 70.00 MURE dtIVEWAY ' IN7ERNAi[ONA~ S'NBOI QF ACCE4S (WN(TC ON BLUf BaCKGP01tt0) ~ • fECT QY SA[0 TRACT 1 h THE WOA05 'RESERVED PARxING' k'STA1E DISABLE PARIfING PERNII REOUIRFD' ' ' ~ • / k YAN PANKINC'. YOUNT 9(CN t0V O~E', .I ~ I • ~ . fDCE Of ExtSTINp PAVE~ENT NBW €OCE Oi PAVEI~ENT~ 6. INIEANATiONAI 9TYBOL OF ACGESS PA(NiEA 'iAAFFIC N'MITE~ ' ~ ~ , ~ ON PAIN1Ep '8LI8' AAC%CROUMO 6N PAVWG. ` I ~ ~~'~~'~_'~.~•~~'~J,.N071b0.W ~.4Q'_~'_~'~_.~~17~.~.~~ ~ : . ~ . . ~ 7. VAIN TETRAPF CAVNITf PES ~ S-0' O.C. PA1N~E'D ON pAV(11C. !~I' I~! .I . ~ ~ ~ , ~ I 6 ASPMALT TO BE RUSM f1{M CONC. MAIN 0 MEAO ~ . ~ m ~ I ~ • ~ ~ OF ACCESSIBLE STALlS - SIOPE YAk, 1;/6. • I ~ I I / e• coHC, aa~a ~ ~ ~ ~ I ~aou+o aurnut , ~ ~ I( I 0. ~~RKINO ~01 STpW{NO TO BE WIDE STflIPES PAIIfTW 'TRA/FIC YELLOYP. / • ~ r 6-~ PIpE BO~ARpS o I I I AS YETERS ~ I I ~ I I , t0. BIxE RApt I'o ~ 30' MI~M STI. PIPf INV[RTEO U-SMAPlA [YBEOOED T Y1K I LOAD~NO ARCA I I• I I IqTO CONCREtE- CONF2AY ~OCAi10N M AACHI7ECT. ~ I a . . ~ t10TC 17 • / / b I ~ O tOt.10' SE TBACK ~ ' 11. SI~E l[WITING QN BU(~OING ANO OH ~~(~T STANOARDS 10 BE $HIELOEO TO YAIHTAp1 ~p g~ ' ~ • ~ b 1lao' I WIO€ dUfp,js ~ 114T1TINC ON SUBdfCT PpOPERTY. NA[NiAIN ~ f00TCAN0.E TO All AREAS. / 'v~R ~p ' ' ~IIY EIif7VT - o X ~b~ ~ , LOAO1H0 At~A ~ I I I 11 OWENS10N5 SH011N ARQ Tp iACE Oi CQNCREtE CURB t EOCE•Oi PAVINQ ~ry , ~ O ~ ~ Dd ~ • ~ 8: y ~ . . ~ a W I I 11 CONCABT[ 4I6EWA~K RAY➢ DM 1.12 TO ILU9H V/ ASiHAIT ~ r I > ~ Ni ~ PROVIOE DE7ECTAAIE WAftNIkO STA4pE0 FULL OEPTH OF pAl~. ~ ~ ~ , a, L , ~ I I• ~I ~ l,e.a . ~ • 4 I I ~ ~ ~ 1ti 7-0' M'IDC OFTECTABI( YIApNING STAItPEO fNTO ASPHALT PAVINC J ~ h I ~,~Iw}j~8 d d L P YlNERE TAANSITiON iRON SIDEWAIIf TO PAVMO [5 U55 TMAN ~ ~ ^NOTE tb ~ o'~ I° . • / ~ • ~1 ~ ~ ~ K 4 = I ~lj ~j~~ ~T,~1' W : ~ o . , . I , 15. 4 TMIf. COtt~qEtt 9fOffY~L1t W/ CQMTROI JOWTS ~ tS'-0~ QG y~ . ~ ~ `J1l~~H ~~I./WW1.~~1uV~lY IqTE 1S- I tI ~n 4_ I CRO54 SIOPE TO BC uAk. 1:1A ~ ~ e~ ~ b ~ I ~ 2 0, I . . . ~ ~o. P~vwc secr o N,a ~ + ; 21,621 S.f. ~ I%I R.o.w. , lQN TO AE 2-t/Y ASPHALT PAVNO OVER ..c ~ 3 B~ GRAMfL BASE. ~ ~ ~ r n ~ _ ' ~ W~y`~ I . ~ ~ ~ o~ ~ -~T~ ~ PARCEL B ~ ~ ~x~9T~~ i l. C Q C R O l 7 U t E W/ AY IS TA UTIl11fE4 POR TRENC1iItIG Of GAS ~ 3 1 4 A 7 I R. t 6~ ~ I: I° 1 a lt . ~ ~ . ~ P ~ I~ F I R E H Y O R A N T N E T O i R O p p g W G A S u E i E q L O C A T 1 0 N. , ~ Z ~ ~ I t O T E 1~, N • I~ Ia • fx2sTl►tC F[RE HYORANT • nt~ ~ ~ _ b I I j~NNI 8 W ~ r, R , h~ ~ ~ A > .b 140.0' : ~ Y~m~ ~1 ~~.Y o- a I. . T ' ~ ~~g I ~ ~ ~ ~ ~Z b CAASS ~t NOiE 13.U NOTE ' I I.~^.~r~ ~ o.. : NaTE ~ I~NOSCAPIrtC E ~ t ~ I ~ , I °y ~ , N07E ~3,14 nott ~a~~ ' ' ( I I . ~ . ' w ~ ` ~ ~ , j,~ on ~ I I I j~ ( . / 4~ ~ WW I . I < ~ ~ I I ~ ~ / ~ r~Ha ° e ~3 m • ~ ~oT ; e ~ ~ ~J ' ~ ~ . ~y , . . s. ~ ~ • ~ Rµ~ .T\' fY T R T ~T\T1"IPT11R T ~ « r1iT~T ~ \'.1 'd~h'\T1,F YFT 1'S T.1'1 a'1H ~,y. ~ ~ ~ ~ ~ ~ ~I~ . ' Iv ~ / i ~d E7f ~sTCrro' T, : . . . . . , .t~, , . . . , ~ . . , s~u.a...:i,, . . , . , , - I ~I 1~ I , ~ . p n Cit EOCf OF -J ~ WIOE A1 iTE ~ W ~LKMAT ~ ~ ' , , o~ •}a y FtRE NYOAANT [XIS~lNG pAVELENt TO 8E B~ AC.'ENf 0( UT ~~~~~9;OEYfAIK ( ( I' I , S A • S~.G' ; ' , . 9' 6' Y 99.C . C . 7 . 8' ~5.7 .pt 9 ptC . .,Ir . . , ♦ . , - •i ~ i ~ • . y ~ ~ ~ .PA4E0 ORIVEYIAY 'I ~I I ~ , • , . . ~ ' h b ~ ~ 'I ~ / ~ ~ . , . I . . ~a ~ ~x sr ~~a c~~ a, sT ~u ~ • ( I I i ~ ~ / / " I II~ ~ ..=---:s~c~tm . ~ I . ~ 3~ e .r -•-~•~S~~N6CRAS;~QSCAPIN~-•--~--~--•--._L1.L~ • ~ . . . . ~ ~ PAR . ~ ~ i f I ~ : , ~ ~ i . / ~ ~ ~ ~ ~ . ~ ~ ~ N ; ~ N ORMA IQN: I I / ~ t~a • • . I I • R~d I ' , I I 7~ep 4F, OA 1.8 ACRES , . Md~ • ~ ~ ' I aJilD~10 COYGUCE: ~1,021 Sf. OR Zl.ex . ~ / ~ ry ~ ~ ( . II ~ ' , ASAf1AlT SNi►ACE ARW 3~.296 9J, ON 4J.8f~ ' I I I Y a~ ~ sme~wc•~ ' as+a sr. ' $ i ~ ~ ~ ~ ~ ~ ~uu ~ sF. oa . ( I . ~ . aa~ t a I I ~ . ~ ' PAAKal01KCJLIFD~ wue0rou5 ~ I a ( . • MF[C6 USE: ~21~~ ~ :000 ~ 6~L~SOACC3 ~ ~ , . ~ ~ II ~ ~ ~ ~ ' I (UlIDETERY(MD UNTIL LCAS[D) . I OfP S ~ I I ~ , I tREET LOADINC: I S~►CE BFOUIREO IY wIDE ~ JO' IONG ~ 1{'-0' IqCN / ~ P . II . ~ W ea~o ~or,xnc . ~ • z~ ~ I I i / PASSEIiCER CAq $pACESs Ql SpAC£S OF WHICN 1 ARe MC, ACCE59l81L ' I I ~ ~ . ~ ~ / ' ~c ' ~ ~ ( . / ~ ~ I I • / , i ( Wn~ ~ I i ~ ~ ' I I ~ ~ j ~ ~NE ` I . PARCEL 1 , i . . ~ . - - - - ~ I / ~i • . , ► ~ - - _ , ~j~ ii , ~rsrt~ ~ j~~ ~ IIRf, H110AlJIT 1S NATCN [ASEIIENi ( ~ I fXISTI?eC p ~ . FIRE, HYOAlWT ~ . . ~ I . ~ ~ , ' . . . , T ' I I . ♦ / ~ i . . ~ ' ~ ~ ~ MR NWOM 03710 ; ~o~ wtoe vue~~e uTntrr e~seu~rT _ . _ ^ . - - • - - • . J • . , ~ J7 SAHItART SEWER EASEYCNT i \ DATL ~ 7-28-03 ' C ' p . p' . . ~ . ~ ' ~ O ~ ~ SU~,LgVA~1 ~OA~ m NORTH ~ - - - - - - - - - - - - - - - - - - - - - . , ' - ~o'-o' . ~ ~ 0 . •s RESOLUTION NO. 99 0626 BEFORE THE BOARD OF COUNTY COMMISSIONERS OF SPOKANE COUNTY, WASHINGTON ~ IN THE MATTER OF AUTHORIZING DEVELOPMENT AGREEMENT WITH ROBERT BONUCCELLI FOR IMPROVEMENT ) R E S O L U T I O N OF SULLNAN ROAD/I-90 IN CONNECTION ) WITH BINDING SITE PLAN NO. 64-98 ) WHEREAS, the development of Binding Site Plan No. 64-98 involves the financial participation in the improvement of Sullivan Road and Interstate 90 Interchange; and WHEREAS, the developer and county staff have prepared a"Development A~reement" enumecating the requirements and obligation of the parties in the project and the County F_ngineer recommends approval and acceptance of the agreement. THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Spokane County, Washington that the "Development Agreement" between Spokane County and Robert Bonuccelli is hereby authorized to execute the same by and on behalf of Spokane County. APPROVED BY THE BOARD this 20th day of ]uly, 1999. BOARD OF COUNTY COMMISSIONERS OF SPOKANE COUNTY, WASHINGTON A~ D ol M. KATE CA N, CHAIRMAN JO ROSKELLEY, VICE -CHAI ~ . HARRIS ~ ATTEST: VICKY M. DALTON CLERK OF THE BOARD • , B DANIELA ERICKSON, DEPUTY ~ I\vlres1genl6SP 61 98 ' ~ I i i I ~ . 99 06 26 DEVELOPMENT AGREEMENT ~ ~ This Development Agreement (the "Agreement") is entered into on the date last written below by and between and Robert Bo.nuccelli, ("Bonuccelli"), having offices for the transaction of business at 2901 North A.rgonne Road, Suite #5, Spokane, Washington and Spokane County ("County"), a political subdivision of the State of Washington. Recitals I. Bonuccelli is the owner of certain real property generally located west of and adjacent to Sullivan Road and north of the Union Pacific Railroad, and legally described in Exhibit A attached hereto and by reference made a part hereof. Said property consists of 21.14 acres + or and shall hereinafter be referred to as "The Property". I~. The County had previously enacted a zone classification of I-3 on The Property. Bonuccelli has received approval of a Bi7ding Site Plari <<ndar BSP-64-98 irom County in order to subdivide said property and allow for developcrteiit or ihose uses which are allowed in the I-3. III. The development of the property under BSP-64-98 for uses allowed in the I-3 will directly impact transportation infra-structure for the Sullivan Road comdor from and including the ramps at I-90 to Trent Avenue. Spokane County Engineering Condition of Approval No. 11 of BSP-64-98 provides that Bonuccelli: Prior to filing of a final binding site plan the applicant shall enter into a! Developer Agreement with Spokane County which will address off-site mitigation for the Sullivan Road /Interstate 90 Interchange, based upon traffic impacts from this proposal. The following language shall appear on the final binding site plan: "The developer of this binding site plan has executed a lleveloper Agreement for off-site transportation mitigation fees based on a per trip calculation for each proposed land use within the binding site plan. This fee shall be collected prior to the issuance of a building permit." ~ ~ I YV. Said improvements to 1-90 and Sullivan Road are not only reasonably necessary and directly related to BSP-64-98, but'they are reasonably capable of being accomplished by Bonuccelli. ' V. Pursuant to 12CW 43.21 C.060, RCW 82.02.020, and Article XI 11 of the Washin~ton State Constitution, the County has the authority to impose mitigation fees for the costs of certain road projects made necessary by development, provided: (1) the CoLinty has identified future road projects necessitated by planned development in certain areas of Spokane County; (2) enacted through conditions of approval of a land use action including a State Environmental Policy Act review, a reasonable relationship betNveen impacts to the transportation system from the proposed development and the financial contribution toward those impacts; and (3) provide an equitable formula by which developers within an area proportionally contribute to the cost of road projects througtl the payment of voluntary mitigation fees. NOW THEREFORE, the Parties agree as follows; 1. Mitigation Fee Bonuccelli shall pay a per trip fee based upon the PNI peak hour trip generation from any proposed land use on The Property. The determination of this PM Peak Hour shall be determined by the County Engineer utilizing the Institute of Transportation Engineering, Trip Generation Manual, '6` Atlditiori, (as amended). This traffic mitigation fee shall be expended towards the construction of the revised west bound loop ramp at Sullivan and I-90 or for improvements to Sullivan Road north of 1-90 and south of Trent . , Avenue. . , ~ 2. Payment , The funds shall be paid as follows: (a) A portion of the rraffic mitigation fee as determined by the County Engineer shall be paid by Bonuccelli at the time an initial building permit application is made to the County for each parcel of property within BSP-64-98. , ~ ~ (b) The traffic mitigation fee due with each building permit application shall be based on the number of PM Peal: Hour trips generated by the type of land use on The Property as determined by tlie County Engineer based upon the Institute of Transportation Engineering, Trip Generation Manual, 6`' Addition, (as amended), and Gross Floor Area which will provide net new trips generated. These new trips will be multiplied by $ 764.76 -to equal the mitigation fee, (see attached Exhibit B for example of this calculation). The $764.76 was calculated through a traffic analysis providing proportionate share of trips and cost estimate done for the proposed west bound on-ramp for Sullivan Road and I-90. 3. Compliance rvith Conditions The County agrees that Bonuccelli's execution of the Agreement and payment of all mitigation fees pursuant to this Agreement constitutes compliance with Engineers Condition Number 11 of BSP-64-98. 4. Compliance `vith RCVV 82.02.020. (a) Each payment collected by the county shall be held in a mitigation fee reserve account and may only be expended to fund the coizstruc:liori of a revised west bound loop ramp at Sullivan /I-90 or capacity improvements to Sullivari Road north of I-90 and south of Trent Avenue, (the "Improvement"). (b) The payment coller,ted upon submittal of each building permit application shall be expended by the County within five years of collection. The County shall be entitled to reimbursement from the mitigation fee reserve account for any funds it may expend for the construction of the improvement prior to the collection of the fee. (c) Any funds in the mitigation fee reserve account not expended within five years shall be refunded with interest as provided in RCW 82.02.020. ~ 5. General terms: ~ I (a) No modification or amendment of this Agreement shall be effective unless executed in writing with the same fornlalities attendant to execution of this Agreement. (b) This Agreement shall be binding on and inure to the benefit of the successors and the assigns of the parties. (c) This Agreement shall be construed in accordance with the laws of the State of Washington. Any action for enforcement of this Agreement shall be brought in a ~ ~ court of competent junsdictior1 in Spokane County, Washington or as ofhetvvise provided by slatGte. (d) No waiver or any breacli of this agreeiizer~~ shall be hel,d ta be a waiver ofany otheF subsequ,ent breach. ~ 6. Miscellaneous. (a) The County shail nat cailect iny ollier trafic Jx71tigatiot1 feeS fOr the prOperty wltliin BSP-64-98, for #:he lmprovCment so long as the proposed usr:,s rerriain sirnilar to ~the list of land usesiattached as Exhibit B. i ~ 7. Texminatian v~ ~greement ~ ~ - , ~ Ttic right to collec.t rnitigalion fees under Ehis Agreemeiit shall tenminate ten (10) - vears afler its execution by the parties herein, at such time if a fonnal irngact fee is adopted by the F3oard of County Camimissioners u.nder RCW 82.02.050 this new #`ee sha11 be cQilecfied at time of huilding permit. If said impact fee has been autharized and Bonuccelli ehooses prior to the ten ~1,b) year termixiatzan af the Agreement to participate in this new impact fee structr.ire for tra'nspartafiian system impact fees, Bonuccelli sliall request in wTiting his inclusion into the new impact fee area. 114 WITNESS WHEREOF, the parties liave executed this Agreement effective this ,.R -e 46:- day o f Jr-t. 1 1999. I ~ SPOKANE COLNTY, a palitical s4division af Washington State f . i . ~ v ChS1r+a.Il j i ~ By: ~ w TobleBonuccellii ~ I ~ ~ I I ACKNOWLEDGMENT STATE OF WASHINGTON ) COUNTY OF SPOK:ANE } On thisaOAP? day of , 1999 before me personally appeared M, , to me own to be the f--of Spokane County, a political subdivision of Washington State, that executed the within and foregoing instrument, and acknowledged said instrument to be the &ee and voluntary act and deed, for the uses and purposes therein mentioned, and on oath stated that she was authorized to execute said instrument. IN VVITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. e,$1011~L . • r. ► ~t~°~pT AR y 1~ C~ • : ~ ~-~IQotary Public in and for the State of ~ pUBt1G Washington, residing at ~si MY aE~Pointment exAires t~ ~ q oo~ Zj~ ~•W~~~~~~ ~~~~111 I I 1tt~~~ STATE OF WASHINGTON ) COUNTY OF . I certify that I know or have satisfactory evidence that Robert Bonuccelli is the individual who appeared before me, and said individual acknowledged that they signed tllis instrument, and aclcnowledged it as his free and voluntary act, for the uses and purposes mentioned in the instrument. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal on this QC~0 day of ff:/j)1999. \\XON~~~1uqIq111U,fp Q;.•.~~ENT . . . ~ - d-~•~ ~Z_ Notary Public in and for the State of :a~ ~•:~0~ inaton, residi pU8L1G Wash n~ at ~;,t--~.,►~ o 0 ~ . . %F BER ~i.' My appointment expires o,~~~/p fi •WAS~,a~~ Uar~iiautia~► ~ MEMORA-NDUM DATE: June 5, 2001 TO: Gary Nyberg CC: Scott Engelhard ^ . FROM: Steve Stairs SUBJECT:' BSP 64-98 - Phase I building permit (6=01107) SPmk~sCOwiY . As provided for in Resolution 99-0626, authorizing a development agreernent befinreen Robert Bonuccelli and Spokane County for road improvements in connection with BSP 64-98, I have . calculated the fee associated with the 21,658 ft2t warehouse building shown as phase I on the . site plan for the above referenced building permit. The mitigation fee, as shown below, is $8,447.22 and is based on the size and use for the proposed building. Since the fee is calculated using the specific use, any change in use or in size of the building will require the fee to be recalculated. This fee does not include the phase Il addition or the phase III building. square footage effective trip of building X generation rate for X cost / trip = mitigation fee . (in thousands) specific land use 21.658 X 0.51 X $764.76 = $8,447.22 3~ y ~ 3 If you have any questions, please don't hesitate to bring them to my atten4. ' . ¢gscss~ ~ . ~ased / D~ • . z • . . L~ C G~ ~ 6z`-bq -'d1 MEMORA~~ UM ~ ~ATE: June 5, 2[}41 TDr Gary Nyberg CC: Sco-t~ Engelhard F ROM: Steve Stai rs c!~V,35--) 511BJECT: ~SP 64-98 - Phase I building permit (9-01107) ~rmulfcmuy As provided for in Resolution 99-0626, authvrizing a development agreement between Robert - Bonuccelii and Spakane County for rQad improvements in cvnnee#ion with BSP 64-98, I have , caicufated the fee associated wi#h the 21,658 ft2± warehouse building shown as phase Ion the site pian for the above referenced buildRng perrrtit. The mitigatian fee, as shown beiow, is $8,447.22 and is based ort the size and use for the praposed building. Since the fee is calculated using the specific use, any change in use vr in size vf th~ building wifl require the fee to be recalculated. This fee does not include the phase 11 additxan ar the phase III buiiding. square footage effective trip of buildRng X generatinn rate far X cvst 1 trip ~ mitigation fee . (in thausands) specifc-land use 21.658 x 0Z1 x $764.76 - 8,447.22 41'~~ A# If you have any questians, please dan?t hesi#a#e to bring them to my attentlft: ~ . *r 00, . ~ ~ u CC-e U, ~ e . . ...,7.,R. ..;v,r:..->~ ~ ~.-~,.,._r.~~.....,.,r: - _ _ ~ ~ T:.. . _ „ .......w~. _ _ - - - L . ~ 6484 ROBERT A. BONUCCELLI P.O. BOX 141449 9249730 ~ 28-811251 ' SPOKANE, WA 99214 ~ . . ` I, . . DATE 1T> f 4 Z'' ~U I _ PAY ~ . • , ~ -~p~• ~ ~ . TO THE ORDER OF o ' DOLLARS pa,:~lo0 o1 DAcw. ~ waWnxgtonTil,st Bank 1 I FOR u'006~+84ll' --1: L 25 L000891: L0O633ci9 2311' . . , . . . ~ - ~ . . _ ~r!nsn-~z~s- • :~i?S•-;" .~r~^ . .i~-i.~_n.+ _~~,,...~..r...~r-......r~...~~~~ ,r......_..._~'~,..,. ~ r ( • S P O K A N E ~ , C O U N T Y DIVISION OF ENGINEERING AND ROADS A DIVISION OF THE PUB[.IC WORKS DEPARTMEN'I' William A. Johns, P.E., County Engineer May 6, 1999 Robert Bonuccelli PO BOX 141449 Spokane WA 99214 Dear Bob: I have reviewed the information available concerning the traffic issues for the convenience store proposed for your property located adjacent to Sullivan Rd. and Marietta Ave. The primary source for trip generation is the Institute of Transportation Engineer's Trip Generation Manual (TGM) and is routinely used by the Transportation Engineering Section. The TGM contains information on trip generation rates and various other trip characteristics based on surveys from across the country. The TGM has two land-use codes which are appropriate for developing traffic projections for the above mentioned convenience store. Land-use #853 (Convenience Store w/ Gasoline Pumps) and #845 (Gasoline/Service Station w/ Convenience Market) have trip characteristics reported in the February,1995 update to the TGM; Tables VII-9 and VII-7 respectively. The reported pass-by rates for these land uses are 66% for a Convenience Store w/ Gas Pumps and 56% for a Gasoline/Service Station vv; Convenience Market. The average pass-by rate for these two land-uses is 61 As a comparison, we typically use 50% in most traffic studies. Taking into account the location of the site and existing traffic patterns we have determined that a 70% pass-by rate would be appropriate for a convenience store on the Bonuccelli property. This is a higher rate than provided in the ITE Trip Generation Manual and the rate typically used by Spokane County. The 70% rate is believed to conservative enough to ensure all trips are counted, yet provides for the exceptional characteristics of the site. I hope this provides you with the needed rationaJe in determining the pass-by rate for the convenience store. If you have any questions or need anything else, please don't hesitate to give me a call. Sincerely, Pat Harper Transportation Engineering Supervisor 1026 W. Broadway Ave. 9 Spokane, WA 99260-0170 •(509) 477-3600 FAX: (509) 324-3478 TDD: (504) 324-3766 ~ • . 41& S N E C O CJ N T Y DNISION OF ENGI\EERING aND ROADS • A DIVISION OF THE PUBLIC WORKS DEPARTIN4ENT William A. Johns, P.E., Countv Engineer Dennis M. Scott, P.E., Director August 26, 1998 Alan Gay, P.E. TechCon, Inc. 12 30 E. Front Ave. Spokane, WA 99202 Re: Combined PubliclPrivate Storm Sewer for Marietta Avenue, F-0065 Alan, Pve compiled a small list of items that need to be addressed in the form of agreements, in order for the County to allow the use of a combined public/private storm sewer: 1. A cash account, dedicated to the County, would have to be set up to cover maintenance costs in case maintenance is not performed as prescribed. The amount of the escrow account will be determined by the County. 2. A detailed list of maintenance requirements for each part of the system, along with the recommended maintenance schedule, needs to be outlined. Recommended drainage items in the list include drywells, pipes, catch basins, spillways, manholes, grass turf, imgation system, fencing, and pond. 3. A release of liability needs to be drawn up, releasing the County from any liability associated with the maintenance activities. 4. The responsibilities in case of contamination or plugging of the pond need to be defined. 5. Annual maintenance reports must be submitted to the County, in a form acceptable to the County. - 6. The terms for severance of the agreement and disconnection of the private storm lines need to be defined. 7. Access rights to the system must be granted to the County. 8. A license agreement must be approved by the Board of County Commissioners. Items 1-7 must be drafted and submitted to the County by Mr. Bonucelli or his representatives. The County can work on Item 8 when agreement is reached on the preceding items. Additional items will be added to this list at the discretion of the County, 1026 W. Broadway Ave. • Spokar►e, WA 99260-0170 •(509) 456-3600 FAX: (509) 324-3478 TDD: (509) 324-3166 y , r in order that the County can reach the comfort level necessary for concurrence on the agreements. Sincerely, Spokane County Engineers William A. Johns, P.E. County Engineer - Doug Busko, P.E. Plan Review Engineer c: Robert Bonucelli, Owner F-0065 Project File Bill Johns, County Engineer Verril Smale, R/W Administrator ~ Submittal Checklist for Road & Drainage Projects in Spokane County - Plats/Short Plats This Submittal Checklist is to be completed and signed by the Spon.sor's E4 ngineer, and included with each plan submittal into the Spokane Counry Fngineers Offtce. If this form is not fully completed anti signetl, do not submit plans and calculatiorts to Spokane County for revietiv and acceptance. Incomplete sasbmittals will be returned and will cause icnnecessary delays for your clienl. ~ CL V' cs r.~. Project Name. Spokane CountY ProJ'ect No. • -5P 64 A Date: lQ'~~ - 0. , Project Engineer: T~_ ~ CCLA, "L-r-y E_ Phone: I P, A~<~.b Phone: 12 Project Sponsor: q A. Preliminary Process Prior to Submittal of Road and Drainage Plans, the following events are to have already occurred: (By checking each item off shoivn below, you are stating that you have verifrecl these events/itenrs have been completed.) pA 0~ Adoption of a Hearing Exanuner's Report for this laig plat, or a Plaining Report for this short plat. At least one Pre-Design Meeting has been held with County sta.ff at the Engineers Office. L9~ An "Agreement to Pay Fees" has been signed by the project sponsor, and submitted to the CounCy Engineers Office. - B~ A Charulelization Plan (e.g. signing and striping plan) of public roadway improvcmcnts, has been coordinated and discussed with the County Ecigineers Office. _ B. Road and Drainage Plan Submittal The items listcd below are to be provided as a minimum with a road and drainage plan submittal. Additional information may be rcquircd to demonstrate that the plans meet all applicablc standards. (By checking "yes"for each item shotivn beloiv, you are verifying that these rten:s have been completed and ar•e included in this subnrittal. For any box checked "n/a'", a)vritten jcrsfificntion of any omissions at lhe end of this section is reqzrired.) ~ Item Description e },es Road and drainage plans, rivo print sets. (Ccrtification statement on cover of plans) N'r ye s 0 n/a One set of plans on 24" x 36" mylar media, or CAD electronic file DWG or .DXF £ormat 2,y,ss Each Plan Sheet of record is siged and dated by the project sponsor. [K yes The road and drainage design meets the requirements of State law, WAC l 96-27 regarding "conformity with accepted standards"; that is, the design reflects the "state of the practice" ~ for the proposed concept. , Vyes The plans, Drauiage Report, basin map(s), and any other calculations are stamped, signed and dated by an engineer licensed in the State of Washington. ycs 0 n/a Drainage Report, two sets. To include: basin map(s), time of concentration routes in basin map, and Certification statement on cover of rcport and basin map. 6y~ s G~ n/a Geotechnical Report, one set. (Include all soil test pit/boring togs.) , ycs 0jAfa Structural Pavement Calculations, one sct 0 yes V ii/a Cross-slope grade calculations for road widening projects. Item Description , !t 4 r 1 ' j'Y Jy~ 0 yes ~ n/a Maintenance Manual and Sinking Fund caiculations for drainage facilities located outside of County road right-of-way. f] yes nla Written explanation of who/what entity will be responsible for maintaining draulage facilities which are located outside of public road right-of-way, a.nd that the plan is acceptable to thc . -f County Engineers Office. yes 0 n/a Channelization Plan, or sigiung and striping information provided in the road plans. To bc included in road and drainage plan set. 0 yes IY nia ] have read the Hearing Examiner's Report (long plat), or Planning Dept. Findings and Conditions (short plat), f.or this project. The design meets the conditions in the report. Q yes 0 y/a Copy of Approved Design Deviations. 0 yes 2",Wa Fire District Approval, for privatc roads. 0 yes n/a Lot Plans. Required for any lots with drainage easements and which front a public road, or ~ for lots which receive and treat runoff from a public right-of-way. fl yes LV n/a Any applicable State and Fedcral permits have been obtained. (i.e. HPA, JARPA, etc.). For Pcrnlits with conditions, a copy of the permit and conditions arc ulcludcd in the plan ~ subm~ittal. s ~ n/a Inspection Agreement between the sponsor and its engineer. yes 0 n/a For off-site easements to be granted to Spokane County, the following items shail be included: legal description, exhibit, and proof of ownership. ryes 0 nIa Erosion Control Plan, requircd for "Major Land-Disturbing Activity." To be included in the road and drainage plan set. Expla.clation for any items listed above which are not includcd in this submittal: - t ~L?J' > (Notc: an insufficAt justification of why an item was not included in the subautted, or incomplete documents, may result in the submittal being returned without review or witliout acceptance. Provide attachments if necessary.) By signing bclow, the engineer is stating that the infornlation provided in the submittal is complete, that the infonnation provided in the Submitlal Checklist is accurate, and the plans and calculations are in accordance with the Spokane County Standards for Road & Sewer Construction, and the Guidelines for Stormtivatef• Management, except where an approved Design Deviation allows othenvise. ~ Engineer's Signature: v er:, _ Date: ER /G fCg CD > ~--~f Engineer's Name: AlrA b4 (please print) / If there crre any qtcestzons about this form or appropriate procedures, please call .Development Services, Spokcrne County Public Work.s, at (509) 456-3600. For Spokane County Use Only Subniittal No: County Plan Reviewer: 0 Accepted in for Review or Construction 0 Returned to the engineer without review and/or accepta.nce, See attached letter of explanation. Processing Date: Submittal Checklist 2 Spokane County Public Works; Apri129, 1998 MEMORANDUM TO: Spokane County Assessor's Office, Andrea Sandvik Spokane County Treasurer's Office, Ann Leach Spokane County Engineers, Dave Berto, c/o Sandy Kimball : F'ROM: Jim Falk, Associate Planner,,42ZL DATE: January 11, 2001 RE: Proposed Final BSP-64-98 Enclosed please find an updated copy of the Plat Certificate pertaining to the above referenced project. If you have any questions you may contact me at (509) 477-7228. Thank you jf Enclosure _ TRANSNATION TITLE INSURANCE COMPANY _ NORTH 7 2 O ARGONNE S POKANE , WASHINGTON 99212 Prepared for: ' Order No.: ME-233874 ROBERT A. BONUCCELLI Charge: $175.00 ATTN: BOB Tax: $14.18 SPOKANE, WA 99214 Total: $189.18 cc: Spokane Co. Planning . cc: Spokane Co. Engineer cc: Techcon/Allan Gay S E C O N D P L A T C E R T I F I•C A T E 0 Certificate for filing Plat of : ~ BSP NO. 64-98 In the matter of the subdivision to be submitted to Spokane County for approval, this company has examined the records of Spokane County Auditor's and Clerk's offices, and the records of the Clerk of the United States District Court holding terms in said county. This certificate is made for the purpose herein specified, and is not to be used as a basis for closing any transaction. Liability is limited to the amount, if any, paid for this certificate. From such examination, the company hereby certifies the title to the following described land, in said Spokane County, to-wit: A portion of the Northeast quarter of Section 11, Township 25 North, Range 44 East, w.M., described as follows: The East 812.46 feet of the East half of the Northeast quarter of Section 11, Township 25 North, Range 44 East, W.M.; . EXCEPT that portion thereof lying Southerly of the following described line:- BEGINNING at a point on the West line of said Southeast quarter of the Northeast quarter, a distance of 750.00 feet North of the Southwest corner of the Southeast quarter of the Northeast quarter of said Section 11; thence South 62058'29" East to the point of intersection of the North right of way line of the Spokane International Railroad Company and the East line of said Section 11; ALSO EXCEPTING the tkNorth 50 . 00 feet; ALSO EXCEPTING all that portion of the Northeast quarter of Section 11, Township 25 North, Range 44 East, W.M., described as follows: legal cont. Page 1 of 4 i + I ~ I orCler Ni . ME-233$74 lega,1 cant. - COMMEN~ING at the lqortheast corner of said Se-ction 11,: thence North 89058'D 3" West, paral le1 wi th the North 1 inelof said Northea st quax'tex', 3 0 . 00 f eet; thence South 001131 ' 0 0" Eastf parallel with the East line af sazd quarter, 50. DD f eet to the True Point of Beginning; thence continuYng Sou,tkx 0~01131' 0011 East, 1130.00 feet; Ghence North 89058`03" West, 782.50 feet; tY~ience North 00031' 001" West, 805. 50 feet; thenqe South 89058' 03" East, 44 . 50 f eet; thence North 000 31' 001' Wes't , 30 .50 feet; theRC2 North 89158r Q~ ~~sto 44 . 50 feetr thp-I1~e No~`t~"l 00031' 001' West, 294.00 feet to a goint 50.00 feet Saut,,h of the North line of said Northeast quarter; thence South 89°58f 03" East, 782.50 feet to the True Point of Beginning; I - ALSO EXCEPTING the East 3 0. 0 4 feet af the Nartheast qu.arter of said 5ectian. 11, VCEPT the Sauth 481.00 feet thereoft - ALSU EXCEPTING the East 50.00 feet af the South 481 . 00 feet of the Southeast qua,rter of the Northeast quarter of said, Section 11, lying North of the Spoka-ne and Internation,al Railway; ~ ALSO EXCEPTING that portion thereof described as fallows : CDMMENCING at the Northeast carner- of Section 11, "i-ownship 25 North, Range 44 East, W. M . ; thence Sauth 00031,001, i East, a di stance af 1748.40 f eet ; thence South 8902 9' 00" 'inTest, a distance of 30.00 feet to tk~e True Point of Seginning;, thence North 45031' 00}' West, a distance of 21.21 feet; thente North 00031' 00" WeSt, a dlstarlce of 70.00 feetf trlenc~e North 44029' 0D" East, a c~istar~ce of 21.21 teet; thea~c~ South 00031' D0'1 East, a distance of 100.00 feet to the True Point of Beginning - ~ ALSD EXCEPTING that portion thereof described as follows : ~ COMNIENCZ,NG at the I~ortlZeast corner ot said Section 11 ; thence North 89058'03« West, parallel wi.th the North line ~of said Northeast quarter, 30.00 feet;tYaence South 00031' 00 T' East, para11e1 with th.e East line of said quarter, 50. 6,0 feet f thence cont inuzng South 00 ° 31 ' 0 0'1 Ea,s t , 113 0. 04 f eet ; thence North 89058' D3" West, 631.50 feet; thence North 06131' 00~1 West, 532.50 feet; thence North 69058' 03'r West, 151.60 feet; thence North 00°31` O0" WesG, 273.00 feet ta the True Point of Beginning; thence South 8905810311 East, 44.50 feet; thence North 00031' 00'" West f30_ 50 feet; thence North 89058' 03f' Westf 44.5(} feet f thenc5 South 00031' QQ" East f 30.50 feet to the True Point of Beginning f AND EXCEPT that portion conveyed to the State of Washin,gton as described in Deeds recarded April 7, 1998 r under Spokane Courzty Auditor's fiTe numbers 4205635 and 4206638. Situate in the Gounty of 5pokane rStaLe of Washingtori . i ~ Page 2 nf 4 ~ . i ~ ~ I i I . _ , . * . I , . I Order No. ME-233874 VESTED IN: I ROBERT A. BONUCCELLI, Id'ominee for SULLIVAN ROAD BUSINESS ~IPARK, LLC, a Washington Limited Liability Company. , . , EXCEPTIONS: ' 1. Taxes and assessments, if any, no search having been made~ thereof, as to Parcel No. 45111.9046. ; Parcel Nos. are provided from the latest Assessor's Maps I 4vailable to the Company. Said parcel numbers are not a matter of the public record therefor, the Company makes no assurance as to validityior accuracy relating thereto. ~ 2. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: I . GR.ANTEE: United States of America - PURPOSE: Outfall Sewer AREA AFFECTED: 50 foot strip ~across the subject property ; RECORDED: October 28, 1942 ; RECORDING NO.: 546260A in Book 502 of Deeds, Page 375 i . ; 3. BUILDING SET BACK LINE: i I ESTABLISHED BY: Spokane County Commissioners Resolution No. 55-439 AREA AFFECTED: 100 foot strip measured West rom the centerlinejof Sullivan Road ~ ~ 4. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: ~ I GR.ANTEE: ~ The Washington Water Power Company PURPOSE: Gas Main AREA AFFECTED: Easterly portion, not clearly defined RECORDED: January 7, 1966 RECORDING NO.: 169178C 5. EASEMENT AND THE TERMS AND CONDITIONS THEREOF: ~ ~ GR.ANTEE: The Washington Water Power Company PURPOSE: Sidewalk guy and anchor j AREA AFFECTED: Along the extreme East side of the subject f property RECORDED: July 7, 1979 RECORDING NO.: 7902070261 I ~ ~ ~ Page 3 of 4 ' ~ ~ i M d • e i. 4 ~ Order No. ME-233874 6. EASEMENT AND THE TERMS AND CONDXTIONS THEREOF: ~ GRANTEE: Fentzer Develogment Corporation and Johnson-Matthey Electronics, Inc. PURFOSE: Sewer Line and appurtenances AREA AFFECTED: NQrtheast portion of that part of the subject property lying ad)acent to S-u1 livarL Roacl RECORDED: May 13, 1994 ~ECORDING NO.: 9405130075 7. EASEMENT AND '7'HE "TERMS AND CONDITYONS THEREOF: GRANTEE : Fentzer Development Corporat;.on _ PURPOSE: Sewer line an~ appurtenances AREA AFFECTED : { East portion RECORDEil : May 19, 1994 . - RECORDING NO.: 9405190145 8_ Liability to future assessments by Tx'entwood Irrigation District No. 3. 9, EASEMENT AND THE TERMS AND C4NDITIONS THEREOF ; G;RANTEE: 'T'rentwood Irrigatian District No. 3 PURPOSE: Zn~tall, construct and maintain water distribution faeil:itzes and othez necessary or convenient appurtenances for -the purpose of a water main line f Remove brush and trees AREA AFFECTED: As described in said docurnent RECORDED: OcGober 11 f 2000 RECDRD I NG NO.: 4523812 10. EASEMENT AND THE 'T'ERMS AND CONDITIDNS THEREOF : F GRA,NTEE: Qwest Carporation, a Co1arado Corparatior~ PTJRPOSE : Canstrt~ct f reconstruct, ~perate and maintairr telecommunicatxon facilities and appurtenances AREA AFF'ECTED : As described in said document REGDRDED : November 13 ,2000 RECDRDZh1G ND. : 4532968 DA'T°ED AS OF Noverrber 29, 2000 at 8 : Q Q a . m. ~ TRANSNATION TITLE INSUR.A.N~E COMPA].VY . t 13Y ~ For service on this order call: (509) 922-2222 {FAX} 926-1519 Nlichel le Erwin r Ti tle Officer Sac 1'age 4 of 4 . Drainage language for BSP-64-98 ~ Date: Novem ber 9, 2000 , ~ To: Landtek, LLC , ~ From: Bill Hemmings, PE ~ I The property owners within this plat shall maintain all water quality swales ("208" swales) and drainage ditches situated on their respective properties, and any portion of a`208' swale situated in a public right-of-way adjacent to their respective properties, ~with a permanent ground cover as specified in the currently approved and accepted plans- on file at Spokane County's Engineer's Office. No structures, including fences, shall be constructed directly over or within a`208'swale without the expressed written con'sent of the Spokane County Engineer. Spokane County does not accept the responsibility to inspect and/or maintain the drainage easements or drainage swales, nor does Spokane County accept any liability for any failure by the lot owner(s) to properly maintai'n such areas. ; ~ The property owners within this plat shall be held responsible for keeping open and maintaining the surface path of natural or man-made drainage flow over and across their respective properties. If the property owners fail to maintain the surface path of natural or man-made drainage flow, or drainage facilities on private properties, a notice of such failure may be given to the property owner. If not corrected within the period indicated on said notice, Spokane County has the right to correct the maintenance failure, or have it corrected, at the expense of the property owner. ; ~ Spokane County does not accept the responsibility of maintaining the drainage course on private lots or floodplain areas within private lots, nor the responsibility for any damage whatsoever, including, but not limited to, inverse condemnation to any properties due to deficient construction and/or maintenance of drainage courses in drainage easements on private property. i ~ Any building that is constructed on a lot in this plat shall be set at such an elevation so as to provide positive drainage away from any drainage entry point to the building (including but not limited to a window well, a window unprotected by a window well; or a doorway). Said positive drainage shall consist of a minimum slope of 3% away from the building for a distance of at least 10 feet from the building. The lots shall be graded so that either a) all runoff is routed away from the building, and conveyed over the lot to a natural drainage swale or approved drainage facility, or b) drainage intercepted on the lot is disposed of on the lot in an approved drainage facility. All drainage facilities for this plat, including any `208' swales, shall be constructed in accordance with the approved plans on file at the Spokane County Public Works Department. Any proposed changes to I I • _ II ' I I _ . I the approved road and drainage plans must be approved by the Spokane County Engineer's Office prior to construction of said changes. I ; The owner(s) or successor(s) in interest agree to join in any County-approved stormwater management program and to pay such rates and charges as may be fixed through ~ public hearings for service or benefit obtained by the planning, design, constructing, maintaining or operation of stormwater control facilities. I ~ I i ~ I i ~ ~ i I i ~ ~ i i I ~ I i I I i ~ ~ ~ I I ~ ~ I ~ I ~ • OFFICE OF THE COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON TO: Bruce R. Larson L.S. ~ i FROM: DAVE BERTO i i i DATE: November 9, 2000 ~ i i ~ SUBJECT: language for BSP 64 ' ' ~ I i The Border Easement as shown hereon are hereby granted to Spokane County and its authorized agents, and to the publ,ic for road purposes, including but not limited to curbs, sidewalks, drainage, signage, and other usage deemed necessary by the Spokane County Engineer for the safety and welfare of the Public. No fence or portion thereof will be constructed withi'n said easement without permission of the Spokane County Engineer, nor will any objects be placed in said easement that would obstruct the sight distance necessary for safe and efficient vehicular movement. Any other easements granted or dedicated within this Border Easement area will be subordinate to the rights created by this easement and are subject to Spokane County Engineers!permit process prior to usage. ~ ~ i i ~ i ~ ~ ~ ~ ~ I ~ i , I • _ - CONTRACT CIVIL ENGINEERING SERVICES Requirements: Construction Phase Review Civil Engineering Project Location: Marietta Avenue west of Sullivan Road, Spokane, Washington Client Name: Robert A. Bonuccelli Purpose: Provide construction phase civil engineering review of construction for development of commercial and industrial lots, including drainage improvements, pavement, and utility trenches. 1. Cost Estimate: The cost for the professional services (billed at $75/hour) are estimated to be a maximum of $3, 000. 00. Services in addirion to those in this contract will be incurred only with prior authorization at a rate of $75 per hour plus expenses. Limited travel to/from site is covered under this contract. 2. Terms: Lump Sum total 15 days after receipt of invoice. To be progress billed at the end of each calendar month for work performed to the date of invoice. 3. Scope of 'work: See letter dated September 11, 1997. If the client requests implementation of any additional work, said work shall follow standard engineering practice. 4. Project Schedule: TechCon will begin work on the project upon notification by the owner or the owner's representative. Work will be completed within two weeks of completion of construction, unless delayed by actions outside the control of TechCon. 5. Client Requirements: The client shall provide TechCon, Inc. (TechCon) the following: • Fax copy of the signed agreement to TechCon denoting authorization to proceed. Page 1 of 2 . CNV • Access to existing records, documents, and/or files regarding the project, as necessary to complete the engineering report. • The client will be responsible for any permit fees regarding this project. TechCon is pleased to have the opportunity to work with you again. Please sign and date at the location below, fax me a copy at (509) 536-0565, and mail a copy of the original at your convenience. Our mailing address is: TECHCON, INC. East 1230 Front Avenue Spokane, Washington 99202-2148 Should you have any questions, please call me at (509) 536-0406. Sincerely, r r Daniel L. Autrey, C. s. Principal AUTHORIZATION TO PROCEED The below signature hereby authorizes and provides TechCon authority to implement and per'orm the needed site investigation svork to meet Industry Standards. 1 understand that the terms of the contract are Net 15 days from the date of initial invoice. Client Name: Print/T ype Client Signature: Date: • 4tAj ZO OC9 Page 2 of 2 . ~ I'Lt1T \TAME N0. S''A'I'IS''lCS l'lat Cl,c:ck 17-c:c: h20CM l C5/0 3&'IU(1 Z00 Nunibcr of Lots 03 Ro,1c1 iM'tles (Nc:w) ~r~><<li ft►~e<< 0~j-'96~RS IMA 1' Norlli Arrow GIZ~ Scctlc I_cgcncl I'romlurc:s LK-, Cquipnent Ilasis ot, llcaritip ~E?cp,2-C &-e° i'lat Loc:acion 135, "1'icic , r~tc OIIIC1:lI 51i1111111'C 13lnCkS I ~ $lll'vC1'OCS CCi'lII1C:1lC ~ I crp~, I:oici Nai»es ~ ~ l,~•7`~i ~ r'1~ . • . - ~ ` R4a(I \ViC11hS J rylz ` Acljaccnt Mca , , 1_ot S-, 13iock iNui»Uers RAV Dcclic::l(ion ctesignatc:tl 1 1'oot Strips j j~ . ~ ~ 3 RI'S oii Cl_O Corners "I'm ct X Loi Arcas I ~ I 13cilcli M:irk ~ 1~- r I CInSUfL' I 1)El)ICA'ClON ~ Dcscripcio►i (To Nbp) . ~ Descripiion ("fo Ccrt) (P~ Owflerti ~ Cc;rlilicale lo Pint ~ 1/~/~~ K ,•-~-p.. ~ .j•, 1 Foot Strips ~ I:ID - CI'l: Stnteitilc»t Accc:ss 1'rohihilccl ` t 4e 1:/\V Dcclicalion ' ~ Drainase La~►~uase ~ Drfl111RgC CnVt;Il-a1ll FIoocl lnsurame ~ 208 lloncls - b 1,000.00 ea 208 1'Lr\NS A('PROVf D 1'rivate Roacf Dac. 1!'s . Privcite Roacl \Varnin~ I 12oac1 ('lans . Al fZc~,i~l 1luncl ii»~~rc~ven~c:nt ~ • Signecl By i.:nginec:r Tl> ~ -7~ f I U , . . ~`~m FROM ANGLE DIST NOR1`H EAS1 TO PSP67 uNE1 /4 1 1-`5--44 ~'Ep- AUTCi 31~tVERSE ) 1 1 ' ~ START 1 V-0000. ~000 1 Q.1000. 0000 i 1 TiVV iV 0 ,~~o 33.00 W 264`. 8300 12642.7256 997E. `;144 ► 2 I h!V S 69 56 013.00 E. 2648o E60Q] 12641.2232 12625.1740 3 3 INV S 0 31 00.00 E 2E69. 12~`~0 9972.2118 i2bla9. 24`E 4 4 i NV N 89 23 56.00 W `649. 3800 10000.0069 1 0000. 0084 5 LAT & DEFI --0. 0069 --0. 0084 5 HCLOSE S 50 38 38.31 W 0.0108 10tZti00. k+000 1 0000. 0000 1 FIREC = 1 TO 975081 Area = 7034908.44 sq ft 161.49928 ac FR0M ANGLE n T ST NORTH EAST T'0 CALCULAI'ED FILAT BOUhIIDRY AUTO INVEF2SE START 10473.7398 11832.2193 33 I NV iV 0 30 59.26 W 988. 030` 1 1461. 7298 1 1823. 3133 1; 15 INV S 89 58 03.00 E 774. 4596 11461.2905 f::: r97. 8f28 35 35 I NV S 0 31 00.00 E 476. 7EE5 10984. 5434 12602.1120 39 39 INV 5 44 29 00.00 W 9.8963 10977.4828 12595.1777 27 27 T IVV s 0 31 00. 00 E 70.0000 1. 0907. 4857 12595.8089 26 26 INV S 45 31 00.00 E 9.8963 10900.5513 22E+02. 8b95 38 38 INV S 0 31 100.00 I~ 202. 8406 10697.7190 l12604. 6986 41 41 I IVV N 89 2 6- 56.00 W 12.0023 10697.8449 12592.6969 40 40 i N V S 0 31 00.00 E 52.0099 10645.8371 1259 3. 1659 43 4; INV S 89 2; 56.00 E 12.0023 1064 7112 12605. i67'6 42 42 INV 5 0 31 00. ~c~O E 192.0365 10453. 6825 1`60E. 8992 37 37 I NV N 89 23 56.00 W 12.0023 10453.8084 12594.8976 22 22 INV S 0 31 00.00 E 370. 81 73 10083. 0062 1`598. 2414 23 ~J I NV N 6; 58 ::9. ~Z+Q► IrJ 8~;9, 9202 10473.7398 11832.2193 :s3 ~ FRCIM ANGLE DIST NUFcTM EAS7 TCl PLAT POL3iVbRY AUTU I hlVERSE S i ART 10697.7190 12604.6986 41 41 INV N 89 23 56.00 W 12.0000 10697. 8449 12592.6992 48 48 I NV S 0 31 00.00 E 52.0100 10645. E3370 1259 3. 1682 49 49 TiVV S 89 23 56.00 C 12.0000 10645.7111 12E05. 1E76 vo 50 ihlV S 0 31 00.00 E. i92. 040r[1 10453. E7'f39 1:`_'606. 8993 51 51 I iVV hl 89 23 56.00 W 12.0000 10453. 8048 12594. 8999 52 52 I1 Y V s 0 31 00.00 E 370.8000 I00Q 3•0179 12598.2436 53 53 11VV N 62 5/ 4»7w 00 W C760• 0J00 10474.0427 11832.2233 a.JY 54 T hIV N 0 31 00.00 W 987. 9100 11461.9126 11823.3149 55 JJ I NV S 89 58 03.00 E 774. 5000 11461.4733 12597.8147 56 56 I NV S 0 31 -00. 00 E 476. 760Q+ 109E34. 73`b 12602.1139 57 57 INV S 44 29 00. 0tZt W 9.9000 1097`7. E+6y4 12595. 176c~ 58 58 I NV 5 0 31 00.00 E 70.0000 10907. 6723 12595. b0'8~ 59 59 INV S 45 31 00.00 E 9.9000 10900. I;53 12602. 8714 60 60 I NV s 0 31 00.00 E 203.0200 10697.7236 12604.7021 61 LAl' & DEFI -0. 0046 -0. 0035 61 HCLOSE 5 37 20 32.10 W 0.0058 10697.7190 12E04. 6986 41 PREC = 1 T"0 700520 Area = 913087.09 sq ft 20.96160 ac FROM A{VGI_E n I 5T PVOR`1IDH EAST 1"O CENTERLIiVE MARIETiA AVE AUTG INVERSE S7ART 10943.0766 1'c:E+40. 489f3 71 71 INV s 89 29 00.00 W 63F. `000 1Q39370 ; s98 12004.3157 72 L- 1\ I%IJI 1 1 I Y Gl I. 1 l.J l.i V III I11G111%J • .L V N 7 1 -T 3 1~.1 C I. J. 11 G 7 ~ F KUM ANGLE DIS'f NOFcTH EAS"f YO LOTS 1-4 S I nEL IiVES F1UT0 IIVVERSE STAR7 1069?. 7190 12E04. 69bE+ 41 41 INV N 89 23 56.00 4J 12.0000 10E97. 8449 1► 592. E992 4E3 48 I IVV S 0 31 00.00 E 52. 0Y Q)0 10645. 8370 12593.1662 49 49 I1VV S 89 23 56.00 E 12. k"tooo 10645.7111 1`E0v. 1676 50 50 I NV S 0 31 00.00 E 192. 0400 1045-3. 6789 1 2606. 8993 51 51 I hIV h! 89 23 56.00 W 12.0000 10453. 8048 12594.8999 52 52 I NV S 0 3f00. 00 E 370. 8000 10083. 0199 12598, 2:4 ;E 53 53 I IVV N 62 57 27.00 W 860.0500 10474. 0427 11832.2233 54 54 I NV N 0 31 00.00 W 461. 7300 109;5. 7540 11828.0596 73 73 Ih1V 1V 89 29 00.00 E 1`6. 2E00 10936. 8925 11954. 3145 74 RAD I AL S 89 29 00.00 W DELTA 137 32 45. 00L1" FIAD I US ° 50.0000 l'AN 128.7272 L--ARC; 120.0314 RAD I AL 5 48 03 45.00 L RP 10931. 3434 12004. 31`5 75 74 CHORD r 69 17 22.50 E 93.2153 10903. 9274 12041. ~062 76 TAN@FIT N 41 56 1 5. 00 E RAD I AL iV 48 03 45.00 W DELTA 47 32 45. OORT RAD I US 30.0000 TAN 1 3. 2146 L--ARC 24.8949 RAD I AL N 0 31 00.00 W RP 10883. Ei77Ei 12063.8224 77 7E CHORD tV 65 42 37.50 E 24.1868 10913. t376E 12063. 5519 78 TAN@P"f N Cy 29 00.00 E 78 I NV N 89 29 00.00 E 495. 6500 10918. 3461 1P559. 181 ? 79 79 T NV S 0 31 00.00 E 5.0000 10913. 3463 12559. :2E8 80 80 I h{V N 89 29 00.00 E 36.5300 10913.6757 12595.7554 81 81 I iV V s 031 00.00 E 6.0000 109 07. 6759 12595.8095 82 82 I NV S 45 31 00.00 E 9.9000 10900. 73g~"l► 12602.8727 83 83 INV S 0 31 00.00 E 203.0200 10697.7272 1~604. 7034 84 LA`I" & DEF' --0. 00t32 --0. 0048 84 HCLaSE S 30 16 27.65 W 0.0095 10697. 7190 1~604. 6986 41 PREC = 1 TO 314861 Ar,ea = 491547.75 sq ft 11.28438 ac FFtt7M ANGLE D I ST iJOR7H EAST °1"0 LCITS 5-1 0 S I DEL I hIES AUTO INVEFcSE START ' 1 0936. 8925 1 1954. 3145 74 74 INV 5 89 29 00.00 W 126. `600 10935.7540 118218. 0;96 73 7; I NV N 0 31 00.00 W 526. 1600 11461.9126 11623.3149 55 55 T IVV a 89 58 03.00 E 174. 5000 11461.4733 1`597. 8147 56 56 I h!V S 0 31 00.00 E 47E+.'7600 10964. 73:::6 12602. 1 1.:;9 57 57 I IVV 5 44 29 00.00 W 9 q4X.40 10977.6694 12595.1769 58 5E3 INV S 0 31 00.00 E 6.0000 10971.6697 12595. 2310 85 85 T NV :a 89 2 9 00.00 W s-~~3E . 5300 1 k~971. 3403 12558. 70`5 86 86 INV S 0 ^ . °O'f't'-J 5. etOOO 109EE+o 3405 f:~55Es. 74I6 87 87 I N V S 89 29 00.00 W 495.6500 1 10961.8710 12063.1178 88 RAU T AL 5 0 31 00.00 E - DEL I A 47 32 45. OORT RAD I US 30.0000 TAN 13.2146 L--AF2C 24.8949 RAD I AL S 47 01 45.00 W RP - i ih99 9._- 86y8 1c`062. Es4 %2 89 88 CHORD N 66 44 3', 0 W 24.1868 1 097 ~210 1~040. 89E2 9ki TANiaF'T N 42 58 15.' 00 4J RAD I Ai_ }V 47 01 45.00 E DEL-f'A 1 37 32 45. 00L"f RAD I US 5=~~, --`~000 , TRN 121 272 . 'L-ARC 12 ~::3 14 - RpD I AL S 69 29 00.00 W R~I 10937.3397 12004.3112 91 90 GHORD S 68 15 22.50 W 93.2153 10936. 688t3 11954.3132 92 TAN@F'T S 0 31 00.00 E LAl" & DEP 0.0037 0. 001 3 92 HCLUSE N 15 31 04.40 E 0.0039 1Q1536. 8925 11954.3145 74 F'h?EC = 1 TO 667456 Wrea = 387189.99 sq ft 8.88E36E ac Berto, Dave From: Parry, Ed Sent: lvlonday, March 2E, 2001 10:30 AM To: Berto, Dave Cc: FaIk, Jim Suhject: BSP64 - Bonucelli We received the construction bQnd for the remaining wark this mQrning. Ed 1 Berto, Dave - - ~ - From: Parry, Ed Sent: Monday, March 26, 2001 10:30 AM To: Berto, Dave Cc: Falk, Jim Subject: BSP64 - Bonucelli We received the construction bond for the remaining work this morning. Ed ~