Loading...
KNOX E 6014 ADD TO STEEL FAB. • ~ ~ . (Z ~J 8812300304 ~~v x Ave ~1z3~ , . lDr c NO 6 ~~~LNO.12533--o6v~ NOT I CE TO THB PIIBL I C pUffpogE 1,31,47,,e/, RID WAIVER, AGREEMENT AND COVENANT: YOI. 1012PAGE1 8 't 9 KNOW ALL MEN BY THESE PRESENTS, That Gary L. Jones & Marilyn R. Jones . , i being the owners of the following described lands in consideration/ of Mutual Benefits to be hereafter,derived do for themselves, their heirs, grantees, assigns and•- successor(s) in.• intereqt hereby agree to suthorize Spokane County to ~place their name(s) on a pe,tition for the-•'formation of a Road ImprovemenC District (RID) by the petition method pursuanC to Chapter 36.88 RCW, which petition includes the c•w-ner(s) property, and furthernot to object, by the signing of a ballot,.to the formation of a RID by the resolution method pursuant to Chapter 36.88 RCW, which resolution includes the owner(s) property. If a RID is formed by either the petition or resolution method, as provided for in Chapter. 36.88 RCW, the •owner(s) or successor(s) further agree: (1) that the improvements or construction contemplated within the proposed RID are feasible, (2) that the benefits to be derived from the formation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense*of formation of the RID, and (3) that the property within the proposed RID_is sufficiently developed. Provided, further, the owner(s) or successor(s) shall retain the right, as suthorized under RCW 36.88.090, to object to any assessment(s) on the property as a result of the improvements called for in conjunction with the formation of a RID by either the petition or resolution method under Chapter 36.88 RCW and to appeal to the Superior Court the decision of the Board of County Commissioners affirming the final assessment roll. , It is further agreed that at such time as an RID is created or any,Road Itnprovement Project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control and paving to existing pavement) shall be at the sole expense of the undersigned owner, their heirs, grantees and assigns without any monetary participation by Spokane County. The RID waiver contained in this agreement shall expire after ten (10) years from the date of execution below. However, at the expiration date the owner(s) or successor(s) agree to construct the required improvements at their own expense; pay to Spokane County the then estimated cost of the required improvements to enable the County to. complete the same; or furnish a bond or other secure method suitable to the County, providing for or securing to the County the actual construction of the improvements,- The above conditions and covenant apply to the following described property: Lots l, 2& 3, Block 6, ORCHARD PARK ADDITION, according to plat recorded in Volume "B" of Plats, Page 76, in Spokane County, Washington. In Section 12, Township 25 North, -Range 43 E.W.M. ThP ahove condj.tions and cnvenant apnl.y to Knox AvPniie & ni (,kPy AvPnuP. Y. r la ' ~~~t~j ~c ~i~ '~Al Y N BEC 30 -3 40 • ya; l;. f; ;.,r k~ . . : a ~ - . ►s: ' ~stlfl-Kit'r05 I'. rK~~4{V . . ' . ~ .E. , . . SAMQZON . 1 . . ^ . , ~ • • q~~•~-' YOI. 1012PAGE1880 These requirements are and shall run with the land and shall be binding upon the owners, their heirs, successors or assigns. IN WITNESS EREOF, we have hereu to set our hand(s). and seal(s) this ~~l-k~aay of , 19 • , . ~I I~ . , Gary . Jon s - Marilyn R. ones ~ STATE OF WASHINGTON ) COUNTY OF SPOKANE ) ss . On this day personally appeared before me Gary L. and Marilyn R. Jones personally known to me to be the individual(s) who executed the forgoing instrumenC and acknowledged the'said instrument to be the free and voluntary, act and deed of said individual(s), for the uses and purposes therein mentioned. Given under my hand and seal this,2dnj day of , 19_11 . 10 ` 0 TA~'f~"' Notary Public ~ Ad.for the State of c~i ' ~►:w • ~ . ~ +,~pl~~L,~ .v . . Washi eton ~ , . residing at Snokane . • • 10• a.~o ' ~j~•:~•, = ' . • I~' J4 ~ ~A ~A0 ` ♦ , ~ t •ii ~ 1, . . . , t , .{s 11)0 1'_ . - •"i.' ~ ~ ►'I:. • I, ~:AS~ • . IN WITNESS WHEREOF, I have hereunto set my hand(s) and seal(s) this day of , 19 . " I/ STATE OF WASHINGTON ) COUNTY OF SPOKANE ) ss On this day personally appeared before me . V personalZy known to me to be the individual(s) who execuCed the forgoing instrument and acknowledged the said instrument to be the free and voluntaty act and deed of said individual(s), for the uses and purposes therein mentioned. Given under my hand and seal this day of 19 . . . Notary Public In and for the State of WashinQton residing at Spokane . • • r . a SPOKANE COUNTY DEPARTMENT OF BUILDING AND SAIFETY ~ NORTH 811 JEFFERSON • ' SPOKANE, WASHINGTON 99260 (509) 456-3675 I I certify thal have examined this permit and state that the information contained in it and submitted by me or my ageni to compile said permit is true and correct. In addition, I have read and understand the INSPECTION REOUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work witl be complied with v,rhether speciiied herein or not. I understand that the issuance oi this permit and any subsequent inspection cipnrovals or Cerlificates oi Occupancy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction, or as a warranty ot Conformance with the provisions of any state or Ibcal laws regulating construction. SIGNATURE OF APPLICATION OWNER OR ENT DATE / ~ ~ . t~.. . . . . A~ .t . . ~ i• , • . , : • . _ . ' . . . i ~ . , : • i c ~ • r . : • ~ . ~ • . i !'•i i L. . . . j 1"! ~.4 1... . ~••f i' ~ ; ~ .c, l.. .•~i . t.~ i 1! :f...E , . , ~ ~ . . , . , , 'tE..jf_ :3~ . Si .ii ~ ~~I I. ~ ~ i I . I c ' " :~t Ei. Ji. .-I. .ji '1: . ~ , • - . . . . . . ~ . . . . . ~ i ~ ' . ~ - ~ ~i•ii• ' • :-.~~~.le i ! ~ .~r . ~ . . ' " : . . • . , ' . . . . . ~ . . . e... ~ r, . . i ! ~ . . j ' ' , ~ ' i • . . ~[J . F t • ! ~ l 1 ~ ' . . ` ~ ~ ~ . ~ . ' ~ . . .i. ~..t 1 ~~.r . i', . P 1... . ! A.~ i 'a .t. . • y f 1 ~ ..t : ! ~ ' k••i I, . : ~~•f 1 . . . . . . , . e .37. . : . : . ' • ~ . . a.-... . t":: ;"kE_~~ {::T.t , ~•,i, I"~ I i ~ ~ 1..~ t i 1 I. . . : ~ I'I!'•.~'~ e.. i.J ~ ~ . i.° ~ • 3 i•5 6 Y•, .~7. . . , • s ~~'f ^ 't ~ .t. i . . ~ . { e l' f• !5 /1 lt, ! . . ~ ~ i ~ • . . . : . ~ . . . ~ I'. . J ~ ~t _ E E.. :..1 :~~1 1i f + i ~ \ i. ~ \ : . . `1.~ ! i` . 1 1 ~ ~ Y t . • t 1..~ . ~ f... ~'.l f i` ~ 1 ~ ` r f 1~ I~ i' ~ I. ; ~ , ~ ~ , < <z ~ e ~ 3 ~ : a ~ : , . , ~ r . : : . . ~ •n' .tr t... t... ~ 't ~ tr . . , , „ , . . s::.:: ~ '.s f••s't. .1 • i:° i' ' _ i „ • . , . ' F:., .i ......e ~'t ( t. I i" i' 4 "I E ~ a.'. a.~ 4.. i'•. , % i. . 4;t i': . i . . . . : . . , , . . , .1 ~ ~ r • ~ . • t • ~ , • . . y . ! ! v 1 . . . t . ! i : I... . ~ t l.? ~ t. . ~ ~ i.• ~ 'i 3 i 1.'~ : . ~ ~ . ' ~ ' , .t.~} ~ ~ • ~ ~ ~ . . r . ~ vti r . ~ r i~. . . . ~ a ~ ~ I..~ ' 9 ~ 3. ! I f. . • C• ~ ~ . , , . . ~ . . ' t~~ ' ~ . 1~• ! 'i . I•i ~ ~ ~ t t tr• ' ~ • . ~p•i I i~ ~ ~ . 4.Yi I f t.. . i. i. F-I ,t. y .tt. .~r. ,i,. i; i :ot. ~i : ~ J~. ~a: •t • • ~r ,1 f~• • - ' ? i v ~ . ~ ;,.f ~ v ~ ~ P ; :ry. t~: s~. ~e •:i• :7~ !i• i. ~:h '~E..13• ie ~i!_ 5j. ~j. ij, iti. ~i. .l]. :~3• ~l• ~.r :i; ':i• . . . ~ i ~ , . 3 i t . ; . . i.~ . , , . . . ~ . i . . "t' .It. i• ..-t'~1". t i~..~ . ~ II.. - a . E., . . .1 [:..f'•L..I e.: . t ~ . e. 1 1'~l..~. . . . . . . . . . ' " ' ' . . . ~ . . . . . . . . ...f . . .l.. . ~ . ~ . . . . . ~ " ' . • c . : . . . • ~ ~ . . • ' . . . + :.l) ! . ~.'i~ •v .li•~ii~ : ( ' t F`~i. . f'i 4; 9,iti 11 ~..~1. ~'ilv~~l} ~ . . . . . . . . . : . . , . . . . . ~ . . i.. r- • ~ E . ' E. ~ ! L:~ . : ~ . ' I ' r,' ~ ~ ' ~ l••~ ~ ' ~ ~.r .I. 1~.. i . . ~ ~ . i f ~ . ~.5 ~ '~.i ~ L f.i~ . . . . . . . . . ~ . " . . . ' . . . . . . . ~ . . . ~ • ; i . • ~ ' ~.I ' • 1 • ~ ~ 7 ~ ' , a , ~ ~ • . ~ : i _ 1:; : ' ' . i . , : i~~~ ~ i„~ 1~;~ . ; ~ ; ~ . i~~i . ~ ' ' ;`7 ?,I . . . . . . . . . . . . . . . - • . . . . . . . . _ , , . . , ~ : . ~ ..i . ~ . . . , , • r-. . . . . . ' . . . 9 ~t~l ~ ~ , ~ + I... ` . . . . . ~ ~ . . ~ , . ' i t . . . . ~ ~ , • . , . . . 7 ~ i: i . ~ . ~ . ~ . _ . . ~ . ~ . . ~ . . . . . . . . . . . " " . ~ . . . . . . . . . • : ~ ~ . ~ . , . „ i ° ' < < ? i ` - . ~ ~ . Ik I , . . „ . . : ' . ..r4i. I• ' f ' i ~ I ~ - .i . . . . . . . . . . . . . . . . . . . ~ . . . . ; r ~ i' i . . t. ~ . . . ~ ~ i. E.. ~ ~ ...t ; j' t a: . . ~ . . . ~ .i.~~i::. . I _ iif.~ g t, 1;~{•: ,:E' :Y~. . ~ . . . . . . . . . . . . . . . . . . . . w w Spokane County ~ ~ - De artment of Buildin & Safet ~ - p ~ y . -w•-;~ _ , _ , _ ~ JAMES L. MANSON, DIRECTOR RECEIVED J UN 8 1988 TO : Ken Jeffrey, Building and Safety John Pederson, Planning Department Couniy Engineering Jerry Sims, Engineer's Department Daryl Way, Health District FROM , homas L. Davis, Code Compliance Coordinator Department of Building and Safety DATE: June 7, 1988 RE : June 6, 1988 - Pre-Construction Conference East 6014 Knox Avenue - Addition to Steel Fabrication Building (Overhead Crane) Enclosed is your copy of the minutes to the referenced meeting. Should you have any questions or need additional information, please feel free to contact me. TLD : j as cc: Mr. Gary Jones, Owner Mr. Rick Wallander, Architect Mr. Jim Legat, Utilities Department NORTH 811 JEFFERSON • SPOKANE, WASHINGTON 9926000050• ~ TELEPHONE (509) 456-3675 MrrtvTEs PRE-CONSTRUCTION CONFERENCE EA3T 6014 RNO% AVENIIE - ADDITION TO STEEL FABRICATION BUILDING '(OVERHEAD CRANE) JUNE 6, 1988 CALL TO ORDER: The meeting was called to order at approximately 10:05 a.m. by Building and Safety's Code Compliance Coordinator Tom . Davis, with the following in attendance. PERMIT REVIEW PARTICIPANTS: Tom Davis, Building and Safety Ken Jeffrey, Building and Safety John Pederson, Planning Department . Julie Shatto, Building and Safety Jerry Sims, Engineer's Department Daryl Way, Health District - APPLICANTS: Gary Jones, Owner, Contact Person, Post Office Box 11754, Spokane, 99211, Phone No. 534-1676 Rick Wallander, Architect, West 2215 Milford Place, Spokane, 99201, Phone No. 325-2300 SCOPE/PROJECT DESCRIPTION: I. General Overview - The applicant is proposing to construct a ' crane structure which will consist of two-five ton bridge cranes. The applicant would like to do the project in phases. II. Construction Schedule - The applicant stated that the footings would be done by this Fall. SUMMARY OF DEPARTMENTAL REOUIREMENTS: I. Planning Department (456-2205) A. Discussion/Requirements 1. The site is zoned restricted industrial. 2. John Pederson stated that the site plan submitted by the applicant was not to scale. 3. The number of parking stalls is based on the square footage of the building. Seventeen to eighteen stalls is required for the building. - 1 - y' 4. In a restricted industrial zone, outdoar storage is not allowed. The storage needs to be inside a building or a six foot sight-obscuring fence needs to be constructed. (The existing fence can have slats installed for the sight-obscuring requirement.) 5. It was stated by the applicant that there would be no new signs and no additional employees. B. Permit Release Requirements 1. A revised site plan to scale illustrating the required parking (parking stalls to be 8 1/2x18 in size), required setbacks, and the location of the six foot sight-obscuring fence needs to be submitted for review and approval. II. Engineering (456-3600) , A. Discussion/Requirements 1. A copy of written comments were given to the applicant and Building and Safety by Jerry Sims. 2. An RID/CRP agreement on Knox Avenue and Eastern Road needs to be filed. A copy of the property deed needs to be submitted for preparation of the RID/CRP agreement. 3. Any new approaches will require approach permits. B. Permit Release Requirements 1. A drainage plan illustrating elevations, cross section of the 1120811 , and how the drainage from the new building will get to the swale area needs to be submitted for review and approval. III. Health District (456-6040) A. Discussion/Requirements 1. It was stated that there is no record of the existing disposal system. Daryl Way suggested that when excavation for the footings and foundation takes place, that the applicant excavate out five feet from the north perimeter of the proposed building addition and dig a three foot deep trench for the length of the addition. If the drainfield is encountered, then alterations will be necessary and a permit from the Health District is required. - 2 - ~ 2. ' A critical materials list will need to be completed. 3. If the proposed use becomes a critical materials activity and if there is an increase of flow to the existing sewage system a non-ground disposal system (holding tank) will be required. B. Permit Release Requirements 1. The Health District is ready to release upon the condition that a three foot deep trench be dug along the north wall of the proposed addition as described in item A-1 above. IV. Utilities Department (456-3604) A. Discussion/Requirements l. The Utilities Department was not present-and had no comments relating to the proposed project. VI. Building and Safety (456-3675) A. Discussion/Requirements 1. PIan review has been completed and copies of the plan review letter were sent to the applicant and the architect and discussed in the meeting. 2. Ken Jeffrey stated that a building permit is valid as long as an inspection is called for every 180 days. . 3. Z'he plans that were submitted are not complete sets of plans. 4. Concrete testing is required for the proposed building unless they want to design it for 2,000 p.s.i. concrete structural strength (see UBC Section 306). Some of the testing laboratories are Buddinger & Associates, ABC, and Pittsburgh Testing. 5. Types and brands of lighting for energy requirements needs to be submitted. A wiring schematic is not required. 6. The type of exit doors to be used needs to be shown on plans. 7. The type of ventilation needs to be shown on the plans. - 3 - t B. Permit Release Requirements • 1. Two complete sets of plans, shop drawings, with the items noted in the plan review letter addressed/clarified on the plans and/or included as an addendum, must be submitted for review and approval prior to release of the permit. APPLICANT'B COMMENTS/ACRNOWLEDGEMENT: The applicant acknowledged that all comments/requirements were understood. The applicant had no further questions at this time regarding permit requirements. CORRECTIONS: To minutes or changes from what appears in the minutes, we should be notified within one day of your receipt of these minutes. To plans as required by any or all of the above-listed departments shall be submitted in sets of 7 to Building and Safety who will then distribute accordingly to each department. ADJOURNMENT: There being no further business, Tom Davis thanked the applicant and the departments for their participation and remindedall that he should be contacted if there are any unforeseen problems which may arise. The meeting was adjourned at approximately 10:30 a.m. Copies of Minutes to: All participants File - East 6014 Knox Avenue Addition to Steel Fabrication Building (Overhead Crane) - 4 - 8812300304 ~ A ve ~ 1 z3g • . t c 1<- c- v ,quP 1 D a f4O. /60 . ' . • N O 6 P-ARcEL No, l Z 53 3- o~ v~ NOT I CS TO THB PIIBL I C pUFfpogE RID WAIVER, AGREEMENT AND COVENANT: YOL. 10 12 PAGE 18 r~ ~ 9 KNOW ALL MEN BY THESE PRESENTS,, That Gary L. Jones & MarilynR. Jones - , r being the owners of the following described lands in consideration' of Mutual Benefits to be hereafter,derived do for themselves, their heirs, grantees, assigns and- successor(s) in-.intereqt hereby agree to authorize Spokane County tofplace their name (s) on a pe.tition ,for the-•'formation of a Road Improvement District (RID) by the petition method pursuant to Chapter 36.88 RCW, which petition includes the 00•,-m2r(s) property, and further not to object, by the signing of a ballot,.to the formation of a RID by the resolution method pursuant to Chapter 36.88 RCW, which resolution includes the owner(s) property. If a RID is formed -by either the petition or resolution method, as provided for in Chapter. 36.88 RCW, the •owner(s) or successor(s) further agree: (1) that the improvements or construction contemplated within the proposed RID are feasible, (2) that the benefits to be derived from the formation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense'of formation of the RID, and (3) that the property within the proposed RID is sufficiently developed. Provided, further, the owner(s) or successor(s) sha-ll retain the right, as authorized under RCW 36.88.090, to object to any assessment(s) on the property as a result of the improvements called for in conjunction with the formation of a RID by either the petition or resolution method under Chapter 36.88 RCW and to appeal to the Superior Court the decision of the Board of County Commissioners affirming the final assessment roll. . It is further agreed that at such time as an RID is created or any,Road Improvement Project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control and paving to existing pavement) shall be at the sole expense of the undersigned owner, their heirs, grantees and assigns without any monetary participation by Spokane County. The RID waiver contained in this agreement shall expire after ten (10) years from the date of execution below. However, at the expiration date the owner(s) or successor(s) agree to construct the required improvements at their own expense; pay to Spokane County the then estimated cost of the required improvements to enable the County to complete _the same; or furnish a bond or other secure method suitable to the County, providing for or securing to the County the actual construction of the improvements,- The above conditions and covenant apply to the following described property: Lots 1, 2& 3, Block 6, ORCHARD PARK ADDITION, according to plat recorded in Volume "B" of Plats, Page 76, in Spokane County, Washington. In SPCtion 12, Township 25 North,•Range 43 E.W.M. ThP ahnve conditi.nn.s and c,ov?nant annl y rn Knox Avp-ntte & ni rkPy AvPnuP. DEC 30' 3 40 " 51~ i C. ; ,r }i~ . . ~7 ' ~ ' s ~ , • . r~.! , , ' r ~.i,';'..•ip. . .E•':. . . . Y~' SAMGrON , _ - • • . ~ These. requireffients are and shall rum with the land and shall be binding upvn the owners, their beirs, successors ar assigns. IN WITNESS EREOF, we have hereu to set o~rr hand(s). and sea~(s) this jle:.e day of 19-„~ ~ . . _ • , hy Y ary_ s ~o-a s ~f . M3x`llyr1 R. OT1es ~ . STATE QF WASHINGTON COUNTY OF SPO1:ANE y) sS On Chis day peraonally apgeared before me Gary L. and Marai.lvn R. Janes personaX1y known to me t4 be the individual(s) who executed the forgoing instruznent and aclcnowledged the said instxumenC to be the free and volaantary act and deed of ssid individual(s), for the uses and purposes therein mentioned. Given unde'r mY hand and seal this 19day of r~ • ~ , . , ~ . - - . . ~ ~ , • ~ P ~ _ #y • ,r Natary Public f or the 3tate of Washi ~~ton , A ~'.r$sidiilg At SDOka11e • ' t ~M1~ y`~ ! V - 'Q a 4 " i ~ ,a?bi#Illfl • . r ' , l .i~:, tLF';•-A " - _ : . , . rN WITNESS WHEREOF, I have hereunCo set my hand(s) and seal(s) this day of , 19 sTATE OF WAsHzWcToN } COi1NTY OF ~ SPOKANE } ss On this day personally appeared before me personally known to me to be the individual(s) who executed the for$aing.,- instrument and acknowleriged Che said insLrurnent Co be the free and voluntary act and deed of said individual(s), for the uses end purposes therein mentianed. Given under my hand and seal this _ day of t 19 , Nvtazy Public In and tor the Stake of Washingtcan residing at Svvkane • 3 + ' ` i oFF. 93fi 514 . YGI. TICOR TITIE INSURANCE' 5711100001 Filed for Record at Request of TO GREGORY S. MORRISON . . _.~..~..,~ITLE Attorney at Law - W. 1728 Jackson Noy A 832 Q8 18., ~ Spokane, Washington 99205 oq WIl.LiAM l°. DUNAtd►1~ _ AU011 UR iSPQKANE 00UN7'Y, WASN:! ~ E L L TITLE ORDER NO. . STATUTORY WARRANTY DEED THE GRANTOR ROBERT W. MILLER and MILADA MILLER, husband and wife, for and in consideration of Ten Dollars and Other Valuable Consideration in hand paid, conveys and warrants to GARY L. JONES and MARILYN"tR. JOIVES, husband and wife, ~t4/' ~ c c.Ljc' dA j ~ the following described real estate, situated in the County ot Spokane , State of Washington: ' Lots l, 2 and 3, Block_6, Orchard Park Addition, according to plat recorded in Volume "B" of Plats, .Page 76, in Spokane County, Washington. mca vvi ~ z l G ~ ~ ~ ° D ~ , .v ~ . , . Excise f ax Paid on 5700015419 ~ Sale Amt. Pd. D.E "'SKIP" CNILBERG $po{ce County 7reas. <1 Dated this 5th day of November , 1987. • ~ . . (Seal) R~ ~ERTW.~MiLi:~ . ^ . k . . ( ea ) STATE OF WASHINGTON, MIL DA MILLER ss. Councy ot Spokane ~ On this day personally appeared before me Robert W. and Milada Miller to me known to be the individual described in and who executed the within and foregoing instrument, and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes thcrein mentioned. j4~ ' `t'~-' ` t~~ GIVEI~' under my hand and official seal this S day o 1VOV mber •1Y1b'~ . A~ ~l~~s' • 1 ~ ^ • (jj . n . . . . A . tar !r in and Ior thate Wa3 to~t; f ►~g 8, 1 ~ dj~~ •~l ; •ri ~ ' , . . Y wi~s J 0~* n re r S.pokane , . v.. :r f' ~ d,~ ~ • f~L ~ •'~~i~ ~.se I OFFICE OF THE COUNTY ENGINEER SPOkANE COUNTY; WASHINGTON F'rc-.ject: ADD. TO STEEL FAD. BI.JILDING Date 6-3-88 Address: F. 6014 k::hIOX P a r ce1 h! o: 12533-- (-)609 Ref No. 88-046 The C-.►unty Enqineerinq Department h~.~s completed a review of the above referenced pro.ject. Trie following infor(naticin must be prc-vided in o1''dLY foY u5 to p1'i!C2ed W.Lth Ol_lY Yt?V1eW. A) A► drainaUe plan for the site wFiich has heeri prepared in c-Dmpliance with SpoE::anP C~DLtnty "Gi_tidelines for Stormwater Management". At a minimIAm tl-ie plan mi_tst contain: 1. Drai.naqe c~.~l r_ulatic-ns f-Dr s•tormwater volumes generated ori site v. Ca1 cu1atic-ns fcir tota1 xmpervious surfaces c-Dn•tained witl-iin tl-ie site. 3. Finistiecf grade e1evaticins for stri_tctLtre~ to be cr-instri_icted on site. 4. t=inished qrade elevations at the top ancl bottom c-f •the :208 swalep 5. A typical cr-Dss section of trie 208 swa1e. 6. Cal ci-tlati-Dns t-D .justify tl-ie number and type of drywel Ia proposed. 7. Elevc~tion oz-f drywell inlets wl-iere applicab.lep Ba The following improvements within ad.jacent Riqht of Way are required prior to the release of a buildinq permit: 1. An RTD/CRP ~.~qreement "hlota.ce t-:- PI.Abl.ic hlo. 6" c-n IS::IUQX AV. AIUU EASTEF2hl RDn neecls to lae recorded. P1e~~~ suFami.t a copy of a reeorcied property deed for the sub.ject pr-Dperty. Upori recei~t r-it the deed our stc-Aff wil prepare trle riqht of way deed and/or the RTD/CRP aqreement4 3. Approach permits mi_ist he oFatai.necl frr-om tf-ie C-DLtnty Engineer i.ng DepartmPnt f-Dr any new driveway approaches. C) Tnsi_tfficient information was submitted with the proposal. We are unable to proceed with our review. We wi 1 1 need tfie fol lowinq before we can proceed: 1. 5ite Plana 2. Drainaqe p1an as specified. Your contact person at the County Enqineerinq Department may be contacted by callinq 456-3600. Your contact person isJERRY SIMS. ADDITION TO STEEL FABRICATION BUILDING . OVERHEAD CRANE INTERMOUNTAIN FIIBRICATORS ; P.O. Box 11759 Spokane, Wa ' ' Gary Jones , Owner . (509) 534-1676 LEGAL DESCRIPTION . Lots 1,2, and 3, block 6,'Orchard Park Addition, .according to plat recoicled in Volume-"B" of Plats, _ Page 76, in 5pokanc County, Washington. ~ SITE AREA 18,000 square feet ZONING Restricted Industrial DESIGN LOADS ` WIND 70 MPH "C" Wind . ROOF 30 PSF Snow Load F L 0 0 R.--~. USE OF EUILDING,-- Steel Fabrication • UBC OCCUPANCY GROUA Group "H" UBC TYPE 4 . BUILDING AREA 2688 square feet OCCUPANT LOAD 24 NUMBER OF PARKING SPACES 18 208 SWALE CALCULIaTIONS - New roof area = 32 x 84 = 268-8' ft2 Swale 2688 x(.5) = 112 ft3 12 (112 ft3) = 224 fi~ (for 6" thick, with dxywell ) .5 ft . l ~ Without drywell = 224 x 9= 896 ft2 Therefore, a 12x75 =900 ft2 swale is sufficient. CONCRETE DESIGN - I 2000 PSI concrete , )MA-T LA ~ . I ~O.o.x av t-. - , A _ ~-~tSTING FENC-E o C-b. ' A /'&hln GATr--S Ib PARKINC-t I , ^ . ~ Sf~ACE~o r~ - r y00,0 / E • ~XfyT OF~1GC G~~ T SLUGSO►J UUt~uOY~IN I TV► ~~.Y OL r _l_--- - - - - - -R " ~ ' 0 i ~ . ~ _ ~ ~ UTTEC~ ~ ~ ( I CKI~T, ~iTRLIGYUR~ I ~l~ ~.NCOIlUrER~O ~ .Q► & -rIT ~112, x/G~RTE NEW A~~~Tt~N I L- 0~ ~ ~ GUTT~.R J up W~A7 P, ~ o 5ul,.S S~~AV~- qUa F1z i - P T pLA I ~ " aGALE ~1~~ , . . . ~ ~ ~ -f- ~ Z~.,i hT. ~ SWAI.E NEW ~ , EL 1U0, 0 ~ ' . ~ - ` uTTEa - r C ~ Spokane County : Department of Buildiizg & Safety ~ '{4 U3• ~r ~ ' . , JAMES L. MANSON, DIRECTOR OF TRArISMITTAL TO . Air Pollution Control Authority County Engineers Environmental Health County Planning Department County Utilities FRONI: Department of Building and Safety DATE: Lo-.1"8S The attached permit application/plan has been submitted to our of f ices . Project # e'8G`Ql__~)(v9 Parcel n 12 533 OIoC.''q (P~,Dl~)IT►0.1v Tc sTeCL_ r-A3ZIIcf~Tlo►~ i3k1%l.D1NF,) Addre ss (oG I y C Ki\iGx mC A pre-construction conference regarding this project has been scheduled f or _j 01,jE (o at 10 : oC) a. m. in the Building and Safety conference room. ' cc: Dennis Scott, P.E. - o c6~ / NORTH 811 JEFFERSON • SPOKANE, WASHINGTOIV 9926000050 • TELEPHONE (509) 456-3675 SPOKANE COUNTY DEPARTMENT OF BUILDING AND SAFETY NORTH 811 JEFFERSON SPOKANE, WASHINGTON 99260 (509) 456-3675 b I I certify that I have examined this perrnit and state that the inforrnation contained in it and submitted by me or my agent to compile said permit is true and correct. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of evork will be complied wilh vrhether specified herein or not. I understand that the issuance of this permit and any subsequent inspection approvals or Certdicates of Occupancy sliall not bc construed to 9ive authority to violafe or cancel the provisions of any state or local law regulating construction, or as a warranty of Conformance with ihe provisions of any sfate or IOcal laws regulating construction SIGNATURL OF APPLICA710N OWNER OR AGENT DATE . . . : . , , . . . : . . . . , • . . , ; ; - 4.; . . ~ 5 ' ' ' t . . . i ~ ~ J I... : ~ : ~ : t . ..j f°i i ~ % :j j r~ i •i ..v a t.. .1y ~f. :~l; •.1, • ~ . •I. :i'. :~i. 'ij . , t 14~ ~!'t, IM1 .;j .i ' I r j..~ ~ . . Y. :~i .5~. .i;. .ji: :13: .~i '~j 'ti '~f 5~..~3. . ~ ii~ 1 ~lf~ 1 ,t •11; -:i~ ;lF- ~th 5i. : . . ; . . . . . . . . :•c ~ 1,• . . . . ~ r ~i , ~.J i'd i : . . . . : . . 3' . , - . . ~ . ~ . ~ t.• . t .1 . ' ~ ' j t' . , ~ .1 l• t ~ .~I• . . y ~1 1.. -M1 . t t'. 1 " e ~ . ~ ~ f j- : ~ . ! ' r+ F... i'~ . t.! :n• : i I..q ~•e . " ! . . 'S 3~.. . ! F:.+ . ~ ~ ~ ~ ? : . . . i'. . . • . t t°~~ i,;~ . . . . . . . ~ . ~ . . . . ; . . . , . . 'i i . J . ~ ~ . ~ : . .i. i..i I 5 ~ ~ ~ . _ ~ . " t'.. . E.. Y ! i ' ' i', ~ .~.1.' . ~ . . • '~.~.t.. 7"li_~~'~:.1 l..~~~. l.~.l.: . ~ -l~~EF~~.i'~~.~ ~..:~~'~1'!~'t.... ~ ~ .f• ? ' ~ • A . i . . " .i ~ t. ' ~.J ~ t..~ ~ ' . ~ . . if . . . i~ . . ~ : .a ~ ' f ! , ~ . . . . " . . ' . . 1'.7 . . . " , r . . . i. f i , . i ' I' : d ' ~ , ~ ~i i.l ~ ~ . ,.:i : _ ~ j ~ ' ~I : 1.: ~ ~ '•j : ~ . ,t ~ • - • . . . . . ~ ~ ~ 'i' ' ~ i~ '.i ° ' ~ . _ I . ~ . ' ~ :t' t. ' t ~ . . . P . . ~ : • 3^, ~ ~ ~ i • . ' ' ~ ' r ' ~ • , ! . .Y : ~ I iJ~ I ~ ~ . 9' ~ ? : . 1 ~ .'~.~.1~.1t-E'.. . •~~..j!•~.i:,~~~~i• 'a~ {.t•.~.... ( . . . . . . F . ; . : r 1. E 4.. ~ ~ . . . : i i X ~ f ' l::. ~ . . . t . . ' ~ ~ f y ~ r••~ r . ~ - ~ ~•-f • : 4.. E L.. e•: 1. ~ } "t~ .1 '•i t c v-. e . . . ~ t ; . ~ . i ~ . . . 1 ..i r_ . . . i ' . . f , • . • • - . c ~ 9 { ~ ~ ~ i ~ ~ . . • t 1~,' i t f• ~ e•:S: ~ . ~~i.'....'~:~: ~{...a!•; , 7~~ ~.i~!'. .1...~~ .!I f .i: k'•.~~.:'~°.~. ~ . . . . _ . . . . . . . . . . ~ . . e ~ ~ . : ~ ~ r •t!• :7 3: r~ .f~ .t~. i~ .jj. .~j_ 5j~ _~j. 5i. :~i. ~ji. ,~i. .J~ . j..<<. i•:c L.. ! ....'.S~ t I}~I ~ I ` . 0• i!' : • ~ii' ei; ~ii• ~i:; ;:l; ;Fi; •EF iE..f~..~~:.~p. .li...Y(. 11:.~j. .11: ii. W. :e~. 'if: ~ l.. . ~ i 3... . . ~er.. . . p.i . t. ,s : i•t : {t ~ . ~ . i,' ' ' ••i . . r•., i j i~. ~ I ~ F . ~'1 1 I , . E... . d... ~ . .J t . : I... f 'i 1 e.5 . i . i .i. ) ' J. E .E. 1"I i.: . . . . ~ ; . . . ~ . •L • : •c „ . ~ . . ..F i ~ : r.• •i'• i" ' f:: ~ h {Y` S. ~ . . . . ~ . f' . . . . . . . . . . . . . . . . . . . . . . . . . p ~•j , j . • , : ~ . i . : i . a - ' ~ ~ 3 ~ 3 , i , . . , ~ " ~ ! ~ ' . . . . ~.:f . • i" • ~ i . . . t ~ F ~ . . . .1. 1... . , .i. ~ . ~ ! ti,' 1;+, ~ t o . . . . . " . . " . . . . . . . . S i n1 . . r ~ i ~ . ~ : I 1:~{.~ i Y 1 E I ~ ti{ , 1.~ r:•.. r'-_ ' ' .J ' . . ~ . . , 4 i , r ~ • ~ . ~ • . I . ;..t ~ i" ~ ~ r : i ~~d i ~ i~ I l'.~ . . . „ . . . . . . . . . . . . . . . . . . . . . . . . . . . : _ . . . . . . ~ . . . ~ 1 ~ ' : 1 ['f'., ~ l, p t':' ~'~•{~'i..- i,. r. E~EE.~.:~~... 1~~ a.~t'{....~''to ~"1~~;~1..},,-4 ~,;•Itr~if. . . . - ~ . . . . . . . : . . . . . . . . . . . . . . . . . ; . , • - ~ • . ~ ~ . • i ~ ' , i.... ~ . . q . .5 _ ~ I `.I; f.:j: ~•!.f .I 1 I ?.~y'.. : 7W~.;, ,I ~~Y~..Y ~..~t. E . . . . . . . . . . . . . _ ~ i. 6.. 3.. . . { ~ ~ .i i... E... 1 ~ . ~'t Ct . • L: i ° ~~d ~ ~ 7. t'i 1 S ~ ~ : • . S.. ~ l~1: 1 . 1 fi.1 < < ~ A.~ ! L.. 7 ~t.,i I...:.? S.' . t.i . 1 A: . . . . . . . . . . . . . . . . . . ~ . . . . . . . . . . • ' " ~r-yv:~,-i~J~ ,.ii~:-~v a~~,~r-';~►:; ~ iViEi~i'~ OF t3Uti&',-DtAta AND SAFETY ~ NORTH 811 JEFFERSON SPOKANE, WASHINGTON 99260 (509) 456-3675 , I certify thaf I havE exarmned this perrnit and state tliat the information contained in it and submitted by me or my agent to compile said permit is true and correct. in addiiion, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply vrith same. All provisions of laws and ~ ordinances governing this type ol vaork will be complied with vrhether specified herein or not I understand that the issuance of this permit and any subsequent inspection approvals or Ccrtificates o( Occupancy shall not be constr«ed to give auihority to viotate or cancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions oi any stale or local laws regulating construction. ~ SIGNATURE OF APPLICATION OWNER OR AGENT DATE ~G ~ i2~eK fVaLcAJJU-~ 22 ~ 5 C,C~ L~o1e ~ PL 4~~2 O / : : _ ~ t..• . i . . ~ E" f-•i 1 ~ , , ~ , .--i' . t...~. :'I . ..l!'. . , ~ •i, .~r :~,..~i i' • .t'. p. 'ii• ~t:. ~ - . ~d 1 ~ s. : > I ~ i ~ • . . ~i~~ ~Jc i~G k Jl rt iy. :u. .~;..j . .ii, i+ .1: f. :11..~1..!i..1,..i.. 1, . } -~i• ~ , ~ ' i. ~ ~ t'~ t i ; : ~ , - . . . ~ , . . . , . . . ~ . - . .L. i~. . i .!t•ti:.. , . t E ~ . . . .r- , .r., .i. i'1 i ; ~ 3::. i i::. ~,1 ~i.. r"•' ~ - '..:tE'..il... ..:i t.~i.:I..." : ~.-d • - . . ~ . . ~ . . ~ .f. ~ r.r ' i ~ e, e t_.: I ~ ' ~.'f ~ ~ j , c " . . . . ~ ~rv . . r'•. - , - • . . . ~ i.. ' ',..r i` i : • ~ ii . . : i . " i ~ t . ° . ~ . . . ~ . . _ . . ~ , - ~ . ~ t'•. . . " . ! E"! ~ ~ j 3r { i•~ , 1.." I ~ 1 . ~ • ' i 1 ~ : ~ t° ~ ~ 1 l... . . . E~` ~ . . . : - ~ [ i ; ' f ' ~ . i` ~ ~ .9. ..1 . , . . . . . . . ~ ' s. . 3 f i . . . . . . . . . . . . . . . . . . . . . ' ' I.. ~•'i S . . ~ . ~ i~ . ~1 ..3'.. s .L .....t. ~ . . . ~ i.- ~ ~ i..' . . ~ ' j• i i : i,.: ~ • • ~ 3:•~ f.. ••t ~..i ~ ~'•t . . . . . . . . . . . . , . : ..1. . . . ~ ~ . " . . ~ . . i ' - ' . . . ~ t.. , . ~ 1... ~ .I i ~ . r . . ~ t . i . i'i ~ ~ ~4.. 1't - ..i i • . . 1 ~ , ` ;i. , ~l. ' . r~. . . . . . . 7~ " r~. ':i . 'il . , , , 1 i . ~ ? ~ ~'.i~ i .~i. .~r. .:t• i~. a•: St. jf , Yj...i. 5I: .)f. W. .1j. .i{:.1f ."tl ft: 11'. W. ji. .`i. A}: .11. If. 4,: V. r' ! • f-~ , c k t,v A►1,1 ~~v~ , - 3Z-5 , - ~.~DDITION TO STEEL FAIIRICATION BUILDING • ' . OVER1-IEAD CRANE INTERMOUNTAIN FABRICATORS P.O. Box 11759 Spokane, Wa Gary Jones , Owner (509) 534-1676 LEGAL DESCRIPTION . Lots 1,2, and 3, block 6, Orchard Park Addition, according to plat recorded in Volume-"B" of Plats, . Page 76, in SPokane County, Washington. ~ . . ~ SITE AREA 18,000 square feet ; ~ ZONING Restricted Industrial DESIGN LOADS WIND 70 MPrI "C" Wind . ROOF 30 PSF Snow Load FLOOCt ~ , USE 0F EUILDING Steel Fabrication UEC OCCUPANCY GROUP Group "H" UBC TYPE 4 . BUILDING AREA 26II8 square feet I OCCUPANT LUAD 24 NUMBER OF PARKING SPACES 18 I 208 SWALE CALCULATIONS - New roof area = 32 x 89 = 268-8*ft2 _ ,Swale 2688 x (.5) = 112 ft3 12 (112 ft3~ _22 4 f(for 6" thick, with drywell ) .5• ft Without drywell = 224 x 9= 896 ft2 Therefore, a 12x75 =900 ft2 swale is sufficient. CONCRETE DESIGN 2000 PSI concrete C~ L C-~-~ 'U l& ) . ~ --A t r, 'e-, c, I 2 za ~ ~ - . • ' i ~ i _ - : wor A LWTiNG GsWGE o E~IhT. G.P5, ~ ~ /,,Qt4D GQTCR.S 18 ('ARKINC1 S(J~D~,O- - - -T 7- - - .J i c ' ~.X~ST O~~~cc I F-X15T 5F-f'TiG TAUK ~ IAJ , J $ TV~LF-T G~AGT I.UGATIOkll1FA4SU~1J ,C ,j 0 , . r ~ - - - - - * I ' ~ , ~ JTTER I ~ • i ' ~ _ ~ W . Y I I~T STRUGTUR~ I ~~~~ti~~~~N~pl ~ ~IF r-NCODUIF-RED ~ rt a ' I I I~ ~`I.GQV ATIt-, N 54' ~ ~ + I Gu-r iErA' I I ~ . Ncw I ' f - - ~ NEW AhDITIIUN 4/ G~ATE I uNHPaTED I y ~ ,uTTE~- ~ No vJasEa oaerJep, c ~ ~ TO 5WAL6 ! SWAI.E qU0 FTz - _ ~L__a~ rac~W~~ Pv~~ ~o ~ swaLE qn.5 ; NEw E xI hY~ EL ioo, o . , i ~ GU?'fER f •