Loading...
2004, 05-04 Permit: BLD-04-04233 Conditions for Issuance of Permit Spoken a000lley50999206 .921 .1000 ♦ Fax: 5097 E Sprague AVe 921te .1005 ♦06 Spokane tlryhalleapoN nValley Aevallley-ory Memorandum To: Kathy Cummings. Permit Specialist From: Kevin Snyder. AICP, Current Planning Manager, Spokane Valley Current Planning 45. Division Date: May 4. 2004 Re: Conditions for Issuance of Building Permit (BL0-04-04233) at 18917 East Riverwalk Lane The Current Planning Division has reviewed the building permit application for BLD-04-04233 that proposes the construction of a single-family residence at 18917 East Riverwalk Lane further identified as Lot 3 of Block 1 of the Riverwalk Final Plat, 11 Addition. Pursuant to the recorded final plat (Book 28, Page 7, September 4, 20021 for this Addition, the rear portion of this lot measuring sixty-five (65) feet inward from the rear property is located within the designated two-hundred (200) shoreline boundary of the Spokane River. The shoreline designation for this subject lot is Pastoral. Spokane Counlys June 20, 2000 Plat Extension Approval limited the building of structures including fences within this designated shoreline portion of the property shall be limited. The recorded final plat further notes that the construction of structures including fences and the changing of natural vegetation within the designated shoreline area of the lot shall not be authorized. Therefore, in order to conform to previous decision-making for the platting of the Addition as well as with the City's adopted Shoreline Program the Current Planning Division will require the following conditions of approval be complied with for the issuance of BLD04-04233: 1 . There shall be no earth movement or stockpiling of material within the designated shoreline area during any portion of the on-site residential construction. 2 A construction fence or imlar approved barrier shall be installed along the entire horizontal boundary of the designated shoreline area closest to Riverwalk Lane prior to any on-site construction and shall be maintained at the property until the certificate of occupancy is issued. 3. There shall be no construction of structures including any and all accessory structures within the designated shoreline area of the subject property. 4. There shall be no removal or change in the current natural vegetative cover within the designated shoreline portion of the subject property. 5. Prior to issuance of certificate of occupancy. a title notice shall be prepared and submitted to the Current Planning Division containing conditions of approval nos. 3 and 4 above. Prior to issuance of certificate of occupancy, and following the Current Planning Division's approval of the title notice language. the title notice shall be recorded against the subject property with the Spokane County's Auditor's Office. A copy of the recorded title notice shall be submitted to the Current Planning Division prior to issuance of certificate of occupancy.