Loading...
1985, 09-09 Pacific Contractors LetterPACIFIC CONTRACTORS Box 11181 Parkwater Station 108 N. Lee Spokane, Washington 99211 Telephone: 534-4304 September 9, 1985 Mr. Jerry Kienbaum E 13112 9th Avenue Spokane, WA 99216 Dear Mr. Postlewait: I am writing this letter in regards to your letter con- cerning Mr. Kienbaum's Warehouse. We are complying with the following: 1. This is going to be for a warehouse type occupancy only. 2. Yes, the west wall will have the studs at 16 inches on the center and 5/8 inch type "X" drywall willbe substi- tuted for the proposed 1/2 inch type "X" drywall to main- tain a one-hour fire rated assembly. 3. The critical materials list has been submitted for your review. 4. Yes, exit doors will be openable from the inside without the use of a key or any special knowledge or effort. 5. No persons will be employed, therefore this does not apply. 6. 2 x 6 x 16 Fur and Large No. 1& 2 7. Truss diagrams have already been furnished. 8. This warehouse is not to be heated. 9. We will comply with the drywall nailing and it will be according to UBC Table 47-G. 10. This warehouse will not have automobiles stored in it. PEILftwr REGAUIRED AND Vitt.rflailloN REGOILIt' 144iEN AtiftoMogmks A-R.E SToftE,P oR MAtWL b 11. Not Applicable -No flammable liquids will be stored in here. 12. Devices which generate a spark or glow capable of igniting gasoline vapors will not be installed or used within 18 inches of the floor. 13. Yes-Draftstops will be installed so the maximum horizontal dimension does not exceed 60 feet and attic access will be installed when a ceiling finish is applied. Page 2 PACIFIC CONTRACTORS Box 11181 Parkwater Station 108 N. Lee Spokane, Washington 99211 Telephone: 534-4304 14. Yes -Anchor bolts will be embedded at least 7 inches into the concrete as required by UBC 2907 (e). 15. I will comply -this will have a flame -spread rating not to exceed 25 and a smoke density not to exceed 450 when tested in accordance with UBC Standard NO. 42-1. 16. Yes we will provide approved numbers or addresses for the new warehouse. It will be plainly visible and legible from the street or road fronting the property. 17. Yes we will comply. The wood that comes in contact with concrete will be of pressure treated or wood of natural resistance to decay, as per U.B.C. Section 2516 (c)3. 18. Hurricane ties are installed on every truss. 19. Already been submitted. 20. Already been taken care of. 21. The maximum flame -spread classifications of finish material used on interior walls and ceilings will not exceed that set forth in UBC TableNo. 42-B. 22. Already been submitted. 23. No plumbling is involved. Sincerely yours, tla 'Terry' £ienbaurn