ENGINEER'S REVIEW SHEET
~
BLDG. PERMIT # -or -FILE# B931 63-93
Related File # ( BSp-17 L6)
Date to Review 11-17-93 Time 11:00 # PRE-CON5TRUCTIN
Date to AA & DR Time
Date Received 11-4-93
Project Name ADD-EXPLOItATION PRODUCTS BSP-17 L6 No. Lots No.Acres
5ection - Township - Range
SITE ADDRESS 5TH LN N 3005/N EUCLID PARCEL # 12541-
Applicant's Name LEO GROSGAN CONST Phone # 226-1397
Address VVork #
Date Conditions mailed
Contact person Phone #
FLOO]D LONE V NO W S SCHOOL
Fngineer / Surveyor's / Architect's Name
Planning Contaci Person Yhone # 456-2205
Date Submitted Description Initials
12 / l~ / R3 AGREEMENT TO PAY FEES OR 1'RIORITY FEE COMPLE'TED & COPY TO ACCOUNTING
FINAL PLAT FEES COMPLETED & COPY TO ACCOUNI'ING
NOTICE TO PUBLIC # ] 3 4 6 COMYLETED - OR NEEDS TO BE SIGNED
DESIGN DEVWTION SUTiMITTED
ALTERATION TO PL.AT - HL4CKS & I-OTS
HEARING EXAM _APPROVEU _DENICD-_APPEALED BBC / PROJECT _APPROVED _DENIED
. ,
/ i'~~ .
Ic ~ l -Y%A.z w~ ~r . ~ 3 ►OOO ~r ' 2~f~ ,
k DQ (A . , 1. .~ti 9 L AA C;
. ~
~o.S?,C,~ 10.~, C~1,,~Q~- ~.nr,..t~.~►..~.r Q G' ~ aU►
. o 4_"~,~ l'~-• c.a at
k\p1t\rev1ew.lor
1
~
Page 1
OFFICE OF THE COUNTY ENGINEER
SPORANE COUNTY, WASHINGTON
Project: Exploration Products-Addition Date 11-17-93
Address: N. 3005 5th Lane
Parcel No: 12541-? Ref No, B93163
The County Engineering Department has completed a review of
the above referenced project. The following information must be
provided in order for us to proceed with our review.
A) For any new hard surface area, for an asphaltic roof, or
a roof containing HVAC machinery, a drainage plan
for the site shall be prepared in compliance with
Spokane County "Guidelines for Stormwater Management". At
a minimum the plan must contain:
1. Drainage calculations for stormwater volumes
generated on site.
2. Calculations for total impervious surfaces
contained within the site.
3. Finished grade elevations for structures to be
constructed on site.
4. Finished grade elevations at the top and bottom of
the 208 swale.
5. A typical cross section of the 208 swale.
6. Calculations to justify the number and type of
drywells proposed.
7. Elevation of drywell inlets where applicable.
8. Copy of the proposed landscape plan.
B) The subject property is affected by the "Findings and
Order" and the "Conditions of Approval" for the following
land use action:
Binding Site Plan No. BSP-87-17
C) Insufficient information was submitted with the proposal.
We are unable to proceed with our review. We will need
the following before we can proceed:
1. Site Plan.
2. Drainage plan as specified.
3. Other information:
a. A parking and traff ic circulation plan shall
be submitted and approved by the Spokane County Engineer. The
design, location and arrangement of parking stalls shall be in
accordance with standard traffic engineering practices. Paving as
required by the County Planning Ordinance, will be required for
any portion of the project which is to be occupied or traveled by
vehicles.
D) Utility Condition: Permittee is responsible for arranging
• for all necessary utility adjustments or relocation as '
required for completion of the improvement.
i
Page 2
E) The owner of the property or the authorized
representative must complete and sign Spokane County
Engineers "Agreement to Pay Fees". This document must be
returned to the County Engineers Office. Plan review will
not be completed until this document is executed. This
document is attached to these comments. Please return
the completed Agreement to your contact person at the
Engineers Department.
Only after all the information and requirements listed above
are supplied or completed and the necessary review has been
accomplished will your building permit be released.
Your contact person at the County Engineering Department is
Robert Turner, 456-3600.
r
~
Page 1
OFFICE OF THE COUNTY ENGINEER
SPORANE COUNTY, WASHINGTON
Project: Exploration Products-Addition Date 11-17-93
Address: N. 3005 5th Lane
Parcel No: 12541-? Ref No. B93163
The County Engineering Department has completed a review of
the above referenced project. The following information must be
provided in order for us to proceed with our review.
A) For any new hard surface area, for an asphaltic roof, or
a roof containing HVAC machinery, a drainage plan
for the site shall be prepared in compliance with
Spokane County "Guidelines for Stormwater Management". At
a minimum the plan must contain:
1. Drainage calculations for stormwater volumes
generated on site.
2. Calculations for total impervious surfaces
contained within the site.
3. Finished grade elevations for structures to be
constructed on site.
4. Finished grade elevations at the top and bottom of
the 208 swale.
5. A typical cross section of the 208 swale.
6. Calculations to justify the number and type of
drywells proposed.
7. Elevation of drywell inlets where applicable.
8. Copy of the proposed landscape plan.
B) The subject property is affected by the "Findings and
Order" and the "Conditions of Approval" for the following
land use action:
Binding Site Plan No. BSP-87-17
C) Insuff icient information was submitted with the proposal.
We are unable to proceed with our review. We will need
the following before we can proceed:
1. Site Plan.
2. Drainage plan as specified.
3. Other information:
a. A parking and traffic circulation plan shall
be submitted and approved by the Spokane County Engineer. The
design, location and arrangement of parking stalls shall be in
accordance with standard traffic engineering practices. Paving as
required by the County Planning Ordinance, will be required for
any portion of the project which is to be occupied or traveled by
vehicles.
D) Utility Condition: Permittee is responsible for arranging
• for all necessary utility adjustments or relocation as
required for completion of the improvement.
i ~
r
Page 2
E) The owner of the property or the authorized
representative must complete and sign Spokane County
Engineers "Agreement to Pay Fees". This document must be
returned to the County Engineers Office. Plan review will
not be completed until this document is executed. This
document is attached to these comments. Please return
the completed Agreement to your contact person at the
Engineers Department.
Only after all the information and requirements listed above
are supplied or completed and the necessary review has been
accomplished will your building permit be released.
Your contact person at the County Engineering Department is
Robert Turner, 456-3600.
TF:X S 7S HOT A PGRM7T
PET1ALTIES WILL BE P.SSESSED cUR COMMEr?CING WORK 4n1TTHQUT A PERMIT
SITE STREET= 3005 N ZNDUSTRIAL PARK 5TH Z,N FARCEL#= 45016.90K
P.DDRESS= SPOKANE WA 99216 qfl
PERMIT USE= ADDITION FOR EXPLORATxON PRODUCTS -
PLAT#= BSP 17 PLAT NAME= BSP #17 gLOCK= LOT= Z(JNE= ME'G DIST#= F
AREA= F/A= F WIDTH= 2140 DEPTH= 3800 R/W=
# OE',aLDGS= 1 DWELLTNGS= wATER DIST
.
OWNER= SPOKANE Ih1DIJSTRIRL PACtiC •'-FHONE= 509 924 2341
STREET= 3808 N SULLIVAri RD
ADDRESS= SPOKANE WA 99216 .
,
CONTACT NAME=„GROGAN CONSTRUCTTON . ~PHOIVE NUMBER= 509 226 1397
BUILDING.SETBACKS: FRONT= EXIS LEFT= 70 RiGNT= EXIS REAR= 40
***~***k*'-.~~-***~***~.**~:~~*****~- REVIEW SNF'ORMATTOAI
. . .
DEPARTMEN'T REV'rEW REn(JTREMENT
.
BUILDING REVIEW COORDINATC}R - J IFnRRti' .
~OMMU'NTS :
BUILDING PLAN REVIEW REQUIRCD
COMMEI+~ITS : '
. ~
ENGINECR SITE DRAINP.GE TO F3E REV:CFWED 4q3
. C>bc7 C O MM E N T S: FiV4" 6(AaAW0.q~ ~c.o CD ~~..Q.~,d~- .6.~ G,^•... I'lltA..~
, . ,
I-IEALTHDIS'T INCREASE zN LOT COVERAGE
~
CONfMENTS :
. , ~
PLANNII3G SITE PLAN REVZEW RFnUIREC) C n Mi,4E N T S:
~ .
,
, , ,
FIRE DISTk FIRE EL'OW TO F3E FtEVIEWED , . ,
. CO`Mr-1ENT S : . ~ = V LA,
, , • •
, ' , . . . . . . - . . .
w w i
I •
r •
o BEFo~E THE sPOKANE CCunmr SuBDiMSior~ ADMINisfiwaToa
IN THE NlATTER OF BIND!#VG FlNDINGS OF FACT,
SITE PL.AN NO. , B5P-87-17 } CONCL'L1SM AND DEC15iDN
THIS MATTER, an application from Spokane Industrial Park has been received ar~ ;
decided upon, pursuant to Spokane County Subdiv4sian regulations, on the 5th day
of May, 1988.
The individual signing belvw has further been properky delegated the
responsibility for rendering the decisian by the Spokane County Director of
P1anning.
F1ND1NGS OF FA~T AND CONCLUSJON
1. The proposal is to div3de 160 aCreS into 46 lots for the developrnent of industrial
lots.
2. The proposa# is locatecf in the norih hal# of 5ection 12, Township 25 North, Range
44 E.W.M., Spokane County, Washing#vn, lying north vf the railroad between
Sullivan and Flora Raads.
3, The eurrent aoning af the property is Manufacturing, established in 1960, The
proposed ~ot siaes, fcontage and intended uses are aIlowed wMthin this zane.
d. The Spokane County Comprehensive PIan designates th€s area as Industrial, The
Iots and uses proposed are gerreralFy fn accord with this planning ca#egory.
5. The required public nvtice was provided for this proposai and agencies having a
potentiaf interest in the project were noUfled and asked for rer.arnmendations,
6, There was a recommendalion fvr a more detailed envirvnrnental review frorin the
Spokana County Engineers. The sponsor and the Spakane Cvunly Engineers have
agreed upon necessar}r road improvements arrd phasing af develvpment ta mitigate
potential irnpravements and phasing of devervpment to miitigate po#entlal adverse
traffic irnpacts. A mi#igated Deterrnination af Nonsignificance Is substi#uted for the
ariginal D.hl.S.. 7he mitigating msasures tecommended by the Spokane County
Engineer's have been agreed upon by tha sponsor #n generalEy reduce anticipated
traffEc irrtpacts af the proposal. .
7. That in consideration of the recommended conditians and Spokane County
develapment standards, #he prvposal is not detrimentaa to the public heaE#h, safe#y
and general welfafe.
8. That the prvject is prapos$d ta have phased development ira three stages with
necessary improvements construc4ed to meet the needs of each phase. SuCh phasing
is consistant with subd3vision practices.
9. That the provisGans of th+e Manufac#uring Zone and vther sectians of the Spokane
Caunty Zoning Qrdinance apply to the use of the individual lats.
DECISON
Based upon the abarre noted Findings of Fact, Binding Site Plan Applicat€orr BSP-
87-17 is hereby APPROVED subject to conditions no#ed below which shatf ba
camp#ied wltl~ by the applicant andlor spansar privr to flnallratian of the binding
site plan.
~
~
f
I
c " y..
Findings; for BSP-17-87
Page 2
CONDITIQNS QF APPROVAL FOR BSP-87-17
That the below lisied conditions of al( Deoartments and AQencies are bindino ua, on
ihe aoollcant. owner(s) of the proQertv, heirs, successors or assians.
pLANNING DEPARTMENT CONDITIONS:
1. The preliminary binding site plat of record approval is for the property legally
described in the application for this proposal.
2. That the Final Binding Site Plan be designed substantially in conformance with the
preliminary binding site plat of record as legally described and advertised. No
increase of lot number shall occur without a new application submittal and
approval.
,
3. The Spokane County Subdivision Administrator shall review any proposed Final
Binding Site Plan to insure compliance with the Findings and Conditions of
Approval.
4. That the preliminary binding site plan be given conditional approval for three (3)
years to June 1, 1991. The applicant may request an Extension of Time by
submitting a written request forty-five (45) days prior to the above expiration
date. -
5. That a Final Binding Site Plan number be indicated before the final binding site
plan is filed; such number to be approved by the County Planning
Director/Designee.
6. That appropriate road names be indicated on the binding site plan.
7. That appropriate utility easements be indicated on copies of the proposed final
binding site plan. Written approval of said utility easements by said utility
companies must be received with the submirial of the final binding site plan.
8. That 3 current certificates of title be furnished the County Planning Department
prior to filing the final binding site plan.
9. That the following statement be placed in the final binding site plan dedication: "No
more than one primary use be placed on any Lot nor shall any lot be further
subdivided ior the purpose of creating addltlonal lots, ownershlps, or bulld(ng sites
without first filing a replat."
10. The final binding site plan map shall indicate by a clear dashed line, the required
setbacks from all private, tract x or public roads. The dedication shall contain a
statement that: "Side yard and rear yard setbacks shall be determined at the time
building permits are requested. The setbacks indicated on thls binding site plan
may be varied from if proper zoning approvals are obtained."
~
1 1. That a plan for water facilities adequate for domestic service and fire protection be
approved by the water supplier, fire protection district, Spokane Counry Building
& Safety Depahment and County heelth authorltles. The agencles w(II certify on
ihe WATER PLAN, prior to the filing of the final binding slte plan or any phase of
the preliminary binding site plan that the plan is in conformance with thefr
respective needs and regulations. The WATER PLAN and certification will be
draned on a transparency suitable for reproduction and be signed by the sponsor.
12. The purveyor will also certify on the Water Plan that approprlate contractual
arrangements and schedule of Improvements have been made with the sponsor for
construction of the water system in accordance with the approved WATER PLAN.
The time schedule for improvements will provide for completion of the water
system and inspection by the appropriate health authorities prior to application
for building permits wiihin the final binding slte plan. The arrangements or
agreements will include a provision holding Spokane County and the purveyor
harmless from claims by any lot purchaser refused a building permit due io the
failure of ihe sponsor to satisfactorily complete the approved water system.
i
Findings; for BSP-17-87
Page 3
13. The final piat dedication will contain the following statement: "The public water
system, pursuant the WATER PIAN approved by County and State Health
authorities, the local fire districi, County Buiiding 8 Safety Department, and
water purveyor, will be installed within this binding site plan, and the
subdivider/sponsor will provide for individual domestic water service as well as
fire protection to each lot prior to sale of each lot and prior to issuance of a
building permit for each lot."
14. That no building permit will be issued for any lot within ihe Final Binding Site
Plan until certified by a Washington State licensed engineer "that the water system
has been installed pursuant the approved WATER PIAN for the Final Binding Site
Plan", signed and stamped by said engineer.
15. That a survey is required prior to the filing of a final binding site plan.
COUNTY ENGINEER'S CONDITIONS
t. The County Engineer has examined thls development proposal and has determined
that the impact of this proposal upon the exisiing County Road System warrants the
dedication of additional Right of Way and the roadway improvements herein
specified. That conditions of approval of the Binding Site Plan by the County
Engineer is given subject to dedication of Right of Way and approval of the road
sytem. In conJunction with phasing of the final Blnd(ng Site Plans, specific
conditions appropriate to each phase will .be specffied.
2. The proposed Binding Site Plan shall be improved to the standards set forth in
Spokane County Board of Commissioners Resolution No. 80-1592, as amended,
which establishes regulations for roads, approaches, drainage and fees in new
construction.
,
/3 The applicant shall deed to s kane Coun 14' feet of the sub'ect ro f r R
po ty ~ p perty o oad
Right of Way along Sullivan Road and shall construct an additional traffic lane along
Sullivan Road from Marietta Avenue northward to the intersectlon of Euclid Avenue
realigned. Construction may be phased as development occurs along the Sullrvan
Road frontage.
4. ^ The applicant shall deed to Spokane County 48' feet of Right of Way for Marietta
Avenue in the alignment as shown on the preliminary Binding Sfte Plan.
5. All required improvements shall conform to the current State of Washington
standard specifications for road and bridge construction and other applicable
County standards and/or adopted resolutions pertaining to road standards and
stormwater management in effect at the date of construction, unless otherwise approved by the County Engineer.
6. Prior to the filing of each phase of the final binding site plan, appropriate plans,
profiles and cross sections as determined by the County Engineer for Sullivan Road,
Euclid Avenue and/or Marietta Avenue showing proposed street centerline and curb
grades be submitted for approval; road plans to be prepared under the direction of
licensed professional Civil Engineer. Euclid Avenue road plans and improvement
are to include full depth pavement design and construction (includes existing
travelway connection to Flora Road). That appropriate road drainage plans and
design calculations as determined by the County Engineer showin9 the alignment of
drainage facllities be submitted for approval. DralnaAe plans to be prepared under
the direction of a licensed professional Civil Engineer.
7. The applicant shall submit for approval by the Spokane County Engineer prior to
the release of a building permit a surface water disposal plan for the building site
or portion thereof if the development Is phased.
8. Prior to the release of a building permit, a parking plan and traffic circulation
plan for each site shall be submitted and approved by the Spokane County Engineer.
The design, location and arrangement4of parking stalls shall be in accordance with
standard engineering practices~aving or surfacing as approved by the Counry
Engineer will be required for any portion of the project which is to be occupied or
traveled by vehicles.
Y ~
~
Findings for BSP-17-87
Page 4
9. Construction wlthin the'existing or proposed public streeis end easements shell be
per-iormed under the direct supervision of a licensed engineer/surveyor, who shall
turnish the County Engineer with "As Built" plans and a certiflcate In writing that
all improvements were installed lo the lines and grades shown on the approved
construction plans and that all disturbed monuments have been replaced.
10. No construction work is to be performed within the existing or proposed public
right of way unlil a permil has been issued by the County Engineer. All work is
subject to inspection and approval by the County Engineer.
t t. All construction within the existing or proposed public right of way is to be
completed prior to filing the final binding site plan or a bond in the amount
estimated by the Counry Engineer to cover the cost of construction of
improvements, construction cert+tication, "As Built" plans and monumenting the
street centerlines shall be tiled with the County Engineer.
12. The applicant shall construct Euclid Avenue and Marietta Avenue as shown on the
~ preliminary binding site plan as public roads. These roadways shall be constructed
in compliance with the typical roadway cross sectfons des(gnated and approved by
the County Engineer. A copy of those typical cross sections is altached lor inclusion
in the "Conditions of Approval". All other roadways shown on the preliminary
binding site plan shall be private roads.
13
The change in alignment and,vacalion of~-current alignment ot Euclid Avenue shall be
~ approved by the Board of County- Commissioners prior 1o the filing of the binding
site plan containing that particular phase of the development.
•~r Prior to the acceptance of the new alignment of Euclid Avenue by Spokane County,
~ the right of way for the new roadway must be deeded to the County and the new
' roadwaay constructed per the approved Typ(al Roadway Cross Section. The vacation
g8 ~ of the existing Euclid Avenue will not become final until the new alignment is
established by the Board of County Commissioners. The change in alignment and
~
/ vacation of the current afignment of Euclid Avenue shall be approved by the Board
of County Commissioners prior to the filing of the Binding Site Plan containing that
particular phase of the realignment.
14. In conjunction with the realignment of Euclid Avenue the applicant is responsible
tor the reconstruction of the existing traffic signal syslem at the Sullivan Road and
realigned Euclid Road intersection and for the construction of the entire additional
traffic lane on Sullivan Road.
15. In conjunction with the requirements of Short Plat 86-457 the applicant is
responsible for the future construction of a new traf(ic signal system at the
intersection o( Sullivan Road and Marietta Avenue when the Intersection meets
traffic engineering warrants for traffic signal construction.
16. That the minimum curb radii at all street intersections within the proposal shall
be 30' teet. Minimum radii at Sullivan Road intersections shall be 40' (eet.
17. To construct the road improvements stated therein, the applicant may, with the
' approval of the County Engineer, join in and be a willing part+cipant in any
, petition~or -re-solution which purpose is the formation oi a Road Improvement
Districk(RID) 'or said improvements pursuant to RCW 36.88, as amended. At
such llme',as-an RIO Is created or any roed Improvement project Is sanctioned by
Spokane County, the improvements required (curbs, pathways, drainage control,
paving, traffic signal syslems, etc.) will be at the sole expense of the undersigned
owner, their heirs, grantees and assigns.
18. Should an RID be pursued, it shall be the responsibility of the applicant to provide
road and dralnage plans sutficient for the creatlon of a Road Improvement Dlstrlct.
These plans shall be prepared by a licensed professional civil engineer and shall be
prepared in compliance with Spokane County road standards and drainage
guldellnes.
In order to construct required roadway improvements on Sullivan Road, Marietta
Avenue and Euclid Avenue the applicant may petition the Board of County
Commissioners to create a Road Improvement District R.I.D. The RID must be
created by the Board of County Commissioners prior to the filing of the binding site
plan.
• y . . -
Findirigs for BSP•17-87
Page 5
19. The tollowing statement shall appear on the binding site plan document "Parking
wiil be prohibited along Euclid Avenue".
20. A statement shall be placed on the binding site plan doucment which prohibits
direct access (rom lots to Sullivan Road or Flora Road.
21. Direct access Irom lots to Marietta Avenue and Euclid Avenue shall be limited to the
access points approved by the Counry Engineer and as shown on the preliminary
binding site plan.
22. A minimum 20' foot wide easement shall be provided along the eest side of Sullivan
Road and each side of the public road right of way on Euclld Avenue and Marietta
Avenue. The purpose of the easement is to aocommodate pathways, landscaping, and
drainage from roadways.
23. A system ot pathways, accessible to the public, be constructed along Sullivan Road,
Euclid Road and Marietta Avenue. The pathway is to be located within the oommon
pathway, drainage and landscape easement area. That a statement shall be placed on
the binding site plan permitting Spokane County 1o enter within the easement for
the purpose of drywell and sign maintenance. Snow removed from ihe public
roadways shall be permitted with the easement. Malntenance of pathways, drainage
swales and landscaping areas shall be the responsiblity of the applicant.
24. The proposed private roads as shown on the preliminary binding slte plan are
approved by Ihe County Engineer.
25. The following statement must appear on the binding site plan document: "The
private roads as shown hereon are easements which provide a means of ingress and
egress for those lots within the binding site plan having frontage thereon."
26. Private road plans with connections to a public road are the respons+bility of the
developer and are required prior to the release of a building permit. A statement to
this efifect shall be placed in the binding site plan document.
2 7.,Private roads__be improved to a minimum improved su rface width of 30' feet with a
minimumC0' foot wide landscaping and drainage easement 06~efther side of the
roadway. SubjectTto approval-under section-10.207-of the Spokane County Fire
Code. 28. A11 vested owners shall sign and record private road documents as prescribed by
the Spokane County Engineer. These documents shall be reviewed and approved by
the Spokane County Engineer prior to recording with the Spokane Counry Auditor.
Recording numbers shall be referenced on the binding site plan document.
29. The following statement shali be placed on the binding site plan document:
"VNARNING: Spokane County has no responsibility to build, improve, maintain or
other wise service the private roads contained within or providing service to the
property described in this binding site plan. By accepting this binding site plan or
subsequently by allowing a building permit to be issued on property on a private
road, Spokane County assumes no obligation for said private road and the owners
hereby acknowledge that the County has no obligation of any kind or nature
whatsoever to establish, examine, survey, construct, alter, repalr, improve,
maintain, provide drainage or snow removal on a private road. This requirement
is and shall run with the land and shall be binding upon the owner, their heirs,
successors or assigns Includinp the obllQation to particlpate In the maintenance of
the prlvate road as provided herein.
30. The following statement shall be placed on each phase of the binding site plan: "The
owner(s) or successor(s) in interest agree to authoriie the County to place their
name(s) on a pet(tlon for the tormatlon of e Road Improvement Dlstrlct (RID) by
Ihe petition method pursuant to Chapter 36.88 RCW, which petltion Includes the
owner(s) property, and further not to obJect, by the signing of a ballot, the
formation of a RID by the resolution method pursuant to Chapter 36.88 RCW,
which resolution includes the owner(s) property. If a RID is formed by either the
petition or resolution method, as provided for in Chapter 36.88 RCW, the
owner(s) or successor(s) further agree: (1) that the improvements or
construction contemplated wiihin the proposed R1D is feasible, (2) that the
bene(i1s to be derived from the formation of the RID by the property included
therein, together with the amount of any County participation, exceeds the cost and
expense of iormation of the RID, and (3) that the propeny within the proposed RiD
is sufticiently developed. Provided, further, 1he owner(s) or successor(s) shall
retain the right, as authorized under RCW 36.88.090, the object to any
assessment(s) on the properly as a result of the improvements called for in
~
Findings 'ifor BSP-17-87
Page 6 '
conjunction wiih the formation of a R1D by eiiher petition or resolution method
under Chapter 36.88 RCW.
COUNTY HEALTH D(STRICT QNDITtQNS
1. A combined surface water and sewage disposal detailed plan shall be approved by
the Counry Engineer and the Spokane County Health District prior to the issuance of
any on-site sewage disposal permit or building permit for this project.
2. Sewage disposal method shall be as authorized by the Director of Utilities, Spokane
County.
3. Water service shall be coordinated through the Director of Utillties, Spokane
Counry.
4. Water service shall be by an existing public water supply when approved by the
Regional Engineer (Spokane), State Department of Soclal 8 Health Servlces.
5. Prior to filing the final plat, the sponsor shall present evidence that the plat lies
within the reoorded service area of the water system proposed to serve the plat.
6. A public sewer system will be made available for the project and individual service
will be provided to each lot prior to sale. Use of individual on-site sewage disposal
systems shall not be authorized.
7. A statement shall be placed in the dedication to the effect that: "A public sewer
system will be made available for the project and individual service will be
provided to each lot prior to sale. Use of individual on-site sewage system shall not
be authorized."
8. The dedicatory language on the plat shall state: "Use of private wells and water
systems is prohibited."
9. The plat dedication will contain a statement to the effect that: "The public water
system as approved by County and State health authorities and the local fire
district and purveyor will be installed within this plat, and 1he subdivider will
provide for individual domeslic water service as well as fire protection to each lot
prior to sale of each lot."
r4UNTY UTILITIES DEPARTMEHT CQHDITIQNS
t. The dedication shall state: "The owner(s) or Successor(s) in interest agree to
authorize the County to place their name(s) on a petition for the formation of ULID
by petition method pursuant to RCW 36.94 which the petitlon fncludes the
Owner(s) property and further not to object by the signing of a protest petition
against the formation of a ULID by resolutbn method pursuant to RCW Chapter
36.94 which includes the Owner(s) property. PROVIDED, thfs conditlon shall not
prohibit the owner(s) or successor(s) from objection to any assessment(s) on the
property as a result of improvements calfed for in conJunclion with the formation
of a ULID by either petition or resolution method under RCW Chapter 36.94".
2. Any water service for this project shall be provided in accordance wilh the
Coordinated Water System Plan for Spokane County, as amended.
3. Project will connect to existing Park Sewer Sysiem. Revlew and inspection of the
sewer plans will be the responsibility of the applicant.
BUILDfNG & SAFETY DEPARTMENT C4NDITIONS
1. The required fire flow for any building or properry development is determined by
building size, type of construction, and proximity of exposures. Required fire
ilows shall be based on an evaluation of each building at the time of building permit
application.
2. Project is located within Fire District No. 1. The required fire flow is determined
by the district.
{
Findings ; for BSP-17-87
Page 7
3. Fire hydrants for commercial and industrial buildings shall be located so that no
portion of the building exterior is more than 175' feet from the hydrant.
4. Fire hydrants shall be bcated so as to be accessible to fire apparatus and not be
obstructed by any structure or vegetation or have the visibility impaired for a
distance of fifty feet in the direction of vehicular approach to the hydrant.
5. Specific location of hydrants shall be determined by the Fire District.
6. The applicant shall provide verification from the Fire District to the Department
of 8uilding and Safety that provisions have been made for adequate fire protection
prior to the release of building permits.
pEPARTMENT OF ECOLQGY
1. A new water right application for any new wells will probably be required for this
project. Please contact Mr. Rynear R. Huffman (509-456-6199) of Ecology's
Eastern Regional Office for further information.
DEPA_RTMENT OF SOCIAL AND HEALTN SERVICES
1. Water main extensioNwater system expanslons requlre the applicant to complete a
Water System Plan and submit plans and specifications for approval before
construction of the proposed water mains.
7r'~
Approved on day of , 1988.
DOUGLAS
Subdivision Administrator ,
CC: County Engineer
Counly Utilities
Counry Health District
County Building 8 Safety
Sponsor Surveyor File -
Parties of Record
. ~
_
, , .
. ~
,
.
S P (D K A N E i, , . C O [J N "I' 'Y
OFF•lCB QF TIIE COUNTY ENCINEER • A DIVISIQN OFTtiE PUHI.IC WORKS DEPARI?vfEN7'
Ronald C. flormann, I'.E., County Cngineer Dennis M. Sco'kt d ~ 4i ~l E D
~
AGREEMENT TO PAY FEES
NAV 23- 1993
ENCINEER'S ACRCEMENT NUMI3ER 8°I~llo3
CODE ENFC?RCEhriEiVT
This agreement between Srokane County and l~L.- oct.x. -v ,
ioame oi person) -
wliose interest in the project is ~ e N~"' '
(i.e. owner, ageni, eic.) '
is entered into tllis ~ day of 1\36v r.•0bc - , 19 _f) 3. This agreement is applicable to the project
known as:
~,t ke... AJ' Lv ~ 3 v~ S" A..v c
(prajcc re s'~r i ename i c n m cr
7liat the inclividuals and rarties namccl hcrein as having an interest in the above ciescribed prorerty or
rroject agree to the following:
1. Reimburse Spokane County for project review and insrection fees as speciiecl in
Ctiarter 9.14 of the Srokane County Code. The fees will bc basecl on actual satary
costs incurrecl by Spokane County for project reviews ancl / or insrections rlus a ten
percent acfministrative cliarge, and will he billecf monthly as accrued. Any ftnal
billing amounts, tu inclucle any late fees or any otlter expenses incurrecl in the
callection of an avercfue account must Ue paicf nr'tor to the County's accertance oF
tlie project for filing.
2. The undersigned agrees that tliese fees are cfue anci payable upon reeeipt of tile
billing as srecifiecf above. 3. A►ny invoiees not paicl within 30 days of the invo'tee clate will be suhjeeted to a late
fee charge of l% per month ( l2% per year) on the unraicl balance of the account
ancl any aceruecJ late fee charges. In adclition, if any outstancfins balance on tlle
account for this project is not pairi within 30 clays of the invoice clate, no fiirther
reviews of tlie project ciocuments will be conciucteci until the entire account balance
is paicf. Any batancc on the accotint for tliis rroject not raicl witllin 65 clays of tile
invoice date may result in legal action or the initation of otlier collection pruceclures,
iricluciing referral to a callec;lion agency. 71ie Sponsor will be liable for any anci all
exrenses inctirred by the County for the collection of overclue accounts.
4. Tlle montlily billing shotilcl be sent to the altention of: .
NAME: N iv s~~ oJ
~
ADDRESS: LV Ql d l~ bQ ~,cr ta Rei
CIT'Y, STATE• . .
ZIP CODE:
PFiONE
I unclerstancf that failure to pay tliese fees may result in delay in completion or arrroval of the rroject or
other possible sanctions.
❑ If this fee asreemcnt is completccf by someone other tltan tlte Sponsor (i.e., the
project owner or a rrincipal in the firm sronsoring the project), sucli as tlle Engineer
cfesigning the rroject, then written autliorization frorn the Sronsor speciticully
autliorizing the Abent to execute this Fee Agreettient is attacliecl to this Fee
Agreement.
~
S I G NATURF F3y: 1, ~e-v Cl~, 0 04 A ti
, (PRINT NAME) v ~
,
RETURN YELI.OW CnI'Y TO Sf''OKANE COUN'I'Y LiNGINFrRS
k\pV\agrcemcn.fee 8/20/93
BOWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: 693163 TIME OF CONCENTRATION (minutes)
DETENTION BASIN DESIGN BASIN: All
REVIEWER: C. Reich Tc (overland) Tc (gutter) Areas C. A"C
NUMBER OF DRYWELLS PROPOSED DATE: Dec. 5,1993
1 Single (type A) 0 Double (type B) Ct = 0.15 L2 = 0 5025.00 0.90 4522.5
Total Area (calc.) (see H1) 11575.00 Z1 = 4 6550.00 0.90 5895
Time of Conc, (calc.) (see H1) 5.00 L1(A) = 50 Z2 = 50 0.00 0.00 0
Composite °C" (calc.) (see H1) 0.90 N(A) = 0.016 B= 0 0.00 0.00 0
Time of Conc. (min) 5,00 S(A) = 0.01 n= 0.016 0.00 0.00 0
Area (Acres) 0.2657 s= 0,008 0.00 0.00 0
C' Factor 0.9 Tc (A) = 0.52 d= 0.1345 0.00 0.00 0
Impervious Area (sq. ft.) 6550 Total A Camp "C"A = 0.488437
Volume Provided 320 L1(B) = 0 Tc (gu) = 0.00 11575.00 0.90 WP = 7.2609
OutFlow (cfs) 0.3 N(B) = 0 Tc(A+B) = 0.52 R= 0,0671
Area' C" Factor 0.24 S(B) = 0 Q=CI"A= 33127.65 V= 1.31
Tc(tot.) = 5.00 Q(est.) = 0.00 Tc(gu) = 0.00
#1 #2 #3 #4 #5 #6 #7 Tc (B) = 0.0 Intensity = 3.18 Q(est) = 0.67
Time Time Intensity Q dev. V in V out Storage
Inc. Inc. Holding = 0.00
(min.) (sec.) (in.lhr.) (cfs) (cu, ft.) (cu. ft.) (cu, ft.)
(#1'60) (A'C'#3) (Outf.'#2) (#5-#6)
Tc (total) = Tc (overland) + Tc (gutter)
5.00 300.00 3.18 0.76 346 90.00 216 Tc (overland) = Ct"(L1'NIS"0.5)"0,6)
Ct = 0,15
5 300 3.18 0.76 346 90 216 L1= Length of Overland Flow
10 600 2.24 0.54 376 180 196 N= friction factor of overland flow (.4 for average grass cover)
15 900 1.77 0.42 424 270 154 S= average slope of overland flow
20 1200 1.45 0,35 451 360 91 Tc (gutter) = Length (ft.)Nelocity (ftJsec.)160
25 1500 1.21 0.29 464 450 14 B= Bottom width uf gutter or ditch
30 1800 1.04 025 473 540 -67 Z1= inverse of cross slope one of ditch
35 2100 0.91 0.22 479 630 -151 Z2 = inverse of cross slope two of ditch
40 2400 0.82 0.20 491 720 •229 d= depth of flow in gutter (estimate, check estimate with Flow)
45 2700 0.74 0.18 496 810 -314 Area = d'B+d^2/2'(Z1+Z2)
SU 3000 0.68 0.16 504 900 -396 Wetted perimeter= B'd+(1lsin(atn(121))+1lsin(atn(122)))
55 3300 0.64 0.15 521 990 -469 Hydraulic Radius = R= ArealWetted Perimeter
60 3600 0.61 0.15 540 1080 •540 Velocity=1.4861n'R".667's".5
65 3900 0.60 0.14 574 1170 -596 Flow = Velociry'Puea
70 4200 0.58 0.14 597 1260 •663 n= 0.016 for asphalt
75 4500 0.56 0.13 616 1350 -734 s= Iongitudinal slope of gutter
80 4800 0.53 0.13 621 1440 -819
85 5100 0.52 0.12 647 1530 4883
90 5400 0.50 0.12 658 1620 -962
95 5700 0.49 0.12 680 1710 -1030
100 6000 0.48 0.11 100 1800 -1100
DRAINAGE POND CALCULATIONS
Required grassy swale pond storage volume
= Impervious Area x.5 in.! 12 inJft. = 273 cu, ft.
Grassy swale pond volume provided = 320 cu, ft.
ORYWELL REQUIREMENTS -10 YEAR DESIGN STORM
Maximum storage required by Bowstring = 216 cu, ft.
Number and type of Drywells Required = 1 Single
0 Double
,
n
JON R. SAYLEA, A.I.A.
ARCHITECT
S. 414 THOR ST. • SPOKANE, WASHINGTON 99202 •(509) 535-9207 • FAX #(509) 535-2985
November 18, 1993
Mr. Bobby Stone _
Building Division
W. 1026 Broadway
Spokane, Wa 99860
RE: Warehouse Addition
Spokane Industrial Park
Dear Bobby:
Rev.4i.ew comments from the various departments have been given back to
me ~y the contractor, Leo Grogan. I have addressed those concerns in
this letter and on the revised drawing. Explanations by department
are as f ol lows :
Building Department
1. A door opening has been provided for exiting from the new
addition to the existng warehouse.
Engineering Department
1. See the small scale site plan, drainage notes and floor plan
for drainage information. All 1208' areas 3nd drywells are
existing and have been previously approved for existing hard
surfaces. The new asphalt area is indicated with spot
elevations showing drainage towards the existing '208' area
affected by it, along with existing spot elevations, existing
bottom of swale elevation and existing top of lid elevation.
Calculations have been provided showing that the additional
asphalt area can be easily accomodated by the existing 1208'
area.
2. All parking stalls are existing approved.
3. All landscaping is exisitng with no new required or proposed.
Pla::ni^g Lepartment
1. Dimensyons to the addition are shown on the revised site plan.
2. Building coverage has bEen provided in the zoning information
~ • ~
Planning Department - continued
3. Building height was previously indicated in the zoning
information
4. Al1 parking on site is existing and has been illustrated on the
revised site plan for the building with the additon. No
additional stalls are required by this addition.
5. Any traffic control devices or signage is existing, with no new
proposed.
6. Existing exterior storage area has been shown on the revised
site plan.
Fire Department
1. A Knox Box will be provided for emergency access as required by
the Valley Fire Department
Sincerely,
~
Steven R. Radkey
Architect
SR/sk
Encl.
.
, • ~
NOTICE OF TRANSMITTAL
ADDRESS: N. 3005 P20JLCT
5-+n c 3- lo6 qv ~
BUSINESS NAME: CX~~~~~TI~N ~C,.T.S PARCEL NO./LEGAL
Dk,SCRIPTION:
PROPOSED USE: 1415o 1(o .9 D9 Q
CONTACT: L E O A-M PHONE: 7
REASON FOR TRANSMITTAL
PREAPPi.ICATION CONFERENCE PRECONSTRUCT[ON CONFERENCE OTHER: ~
DATE: TIME:
DOCUMENI`S CIRCULATED
DLSTRIBUTED TO: ~
AEM DESCRIPTION BUILD[NaS PLANNING F.N(GINEERS HEALTH SCAPCA FQtE DIST I~ OTHER:
NiSite Plan (new)((revise. j x + x ~ ~ I X,~ I , x ~
Critica1 Materials List
Parking Plan.
, . . . , .
iSign,~ge Placi . ( I
♦~r.~'r~1~r. ' ~ , ♦ . ♦ ww.
,Lightiog Plan
t~
I _ I : :x•r.w~'~~~~ ~9~~4SaK•>yi~~.~+.~:~'i~i~i~~9:$`~~^t~f::4,+k.xY~~'.~5<:S.f
.:'v:r v ,~r.,.• f .
Drainage Plan <it;<: ' ;k:
I ~ .6]PCCaY ' I ~}::i: }:%r: , }~.C N-~~ ~~~~~53%!!'! h:• " , .
, •r~,.._{..!~.. ia. . . t . v •r,
. . . . - -
"h ~~.~.t } ~ J ` v wf C r~+'~•: v ~f~v' y~;•
Dratnage Calcutations ~ .
~
JN } {L2{~~r~r3~id~. }Yl.:tflh~~ ' ' ' ' N • v
♦I..M~♦ ~MrMNr1~.~+.~~~~IMIM♦ ♦ ~1 MNFM/~M~ ~Y~ MMMM~MFN~Y w
~~'-;Kfnr• L'{:`i;'f~ i v• ~'~'y.>:4 v
KiAgreement to Pay Fees , ~ X (;~`:°`~-::~N~
s>fS . o:•M>.>.. N. ,.a:x.o••. ~ .,Js.;..
~~1 ~
1 f r}~.. •
IIrcigaiion Plan
1
~sr..•.~ ~ ~:s •
ILandscape Plan
I ~ ~ `Y~Lt~Lti~ix,~~Y7~;+lii.%?~:i'h'•~.. `•.:r+..4A1.~"f.tiC:?~~.. .~r
a
. : {Y - • ~'r ` ` '~3v' sd` ryy;~~~j9~oS +rr : - j • i . r • ~ ' ~ ~
lProc~u ry Letter
- sso ~ ~
Landscape Cost Estimate,>y~17y ~ [j!4 ~~(.1}(f~~..~~~y
~~X,~~!~.~ ~i .C•?~ ~ 4 flLfr~Y ~'°'~,`~fRTIIY.' ~~k~ ..M. ♦ M M W.
N{r.~n~,h~C h
iTraffic Circulation Plan I I I :~r ~
.~'/yF: y~~
- `:r>? 'k` ~ ~ d~ r 4 ~r.dr ~t '~c` • . .
I ~
Constcuction Drawings S '
I ^CSyyA~4!".~hK~~•. ~0. ~ r . fi ~i~~
IFloor Plan ~ :
~~~:5ct£S r.~.+~::...+•;~vr
~I 4<MoX ptrrk I I I I I I X. I .
S~.~ac ~s~r~l► ~ I I., I: I I I .
~
The nbovc itcros hnvc bccii recci vcd:
r
Date of Transmittal: Review Coordinator.V) u L i C nT-fc)
circuizced t,y:
Snoknrrc Counry Divisioir o/' 13uildirig.c * 1026 Wc,ct Qr•oadwRy Ave,iuc * Spokarie, WA 99260 *(509)456-3675
w h
NOTICE OF TRANSMITTAL
~
~
ADDRESS: 3 C5 NI, cl~c}.LA5-~r, PROJECT
Q3 I o~>q4-
BUSINESS NAME:, C,~~ PARCEL NO./LEGAL
DESCRIPTION:
PROPOSED USE: Ad& 4ioS1 -~C) r L45o1 6
o~-c~.-t, s~ n ~ D
CONTACT: I PHONE:
~roq QSl C:or,s4"uc-- , ~~1 13 9`7
REASON FOR TRANSMITTAL c,~~ ~
„
PRBAPPLICA,TION CONFERENCE PRECONSTRUCTION CONFERENCE OTHER:
DATE: I ( - jr7_ q 3 TIME: 00
DOCUMENTS CIRCULATED
DISTRIBUTED TO:
RWD DESCRIPTION BUILDINGS PLANN[NG ENGINEERS HEALTH SCAPCA FIItE D1ST a_J- 01'HER:
-7V,....ISite Plan (ne~ (revised) X I X. I X ( ( X +
, , ;~•.x.i?::::;t . t;r ~:r ~a:t.+;y;; ~ v 1c, .
Critical Materials List ' 3>~
~ r
W'~ ~ • ~ ti!t <f' . > ~ r.
r.~Ci.4iK't.h.~+a` .'.+'~;?~~~i~ii~7;•~ ~~k;:t;r::.~,•~t•:••ro~ 4 •'~d~ ?'}3.
~.•:j•~~r:~ ,rl..:~•.,,y,y. ~y ~casa: rK ~ 'ifl''' -icf
~l .Y , •rfv 7~~0"i~~~'v°''l a.~ ~
Parking Plan. ! ~:.;.v: ...r:.~.r:.:.: ti. ,.j 1 f ! • . 4
fv;t,,;` r~• ~ '~Y' ~ `r.• ~r, ~,.~~•f, ~r
v y?vY. yrr~ax+>~ .t. •»:r~o :
Signage Plan
Ip1o~
~~'i:; ',Cyit:~tiy k~i~:ti~{{ ~•i; i~ ~rif^ ~y i'?J ~ v~~ :v~''.~.~,}k'~'.1' '~:~:ti } ~~{v.M}~'.,~~,u~,'~ y'r ~tiyy,~'
L~bh t i ng Pl cu l
,}f^.r~+;~i+j~~.%%i$GU ~:y:'?4}:::}4},,,fi~ f iy:- }r::.v:r:'•:,r:{ :;:~':$..;.;~'3'. ~r ~lff~{S.Y.K. Lv ~y:•i~~r,'~kW.
~ ~ F.'~~rti" v$~:.•.•:.v;.ti.rti . /i . >.v.J: . ' % } 2:
i " •r •.tiv :v 4
~ ~Y';, ..,.,ti,~„ F .Yi~.~,-:... :'v.}.,;..ryti t.~qj; ~\~{r
lDrainage Plan .
E~r:•:::.>:::~•r'' •cy 3••
~ ~:::i:..
~vi.iri,4'vr:{'ry.~t{.?h~r~, ~ i5S{AS;ii"r.6i•.:v~:~'+•:^'?ti•i?f~.6'~:'d.'f:~}:v:'~:• ~,r+: S{ vri
. . . ~~f~. . . . . . . . • ~
<tyW;;i:j :~x:;,;f;X~'trk> L~~•`.<:u :~:act?t;;,yr; ''~•:::"~::Yr'rt%ittit '<,•~iivrr •r ie'ryi~4.
Drainage Caicuiations r,;r,~kxr.:~:::•:~::.<r:;:..:~,.~.~;.~s~f
- . . ~
'~~:`.~i :i~ bv~~'i.~;r%,: ~f,o~~:la~~~fi~ ;i~fi• r~ . r :•i;~; r.'• v ~ ~rk~.'v.'f~~;:'r.:: s:~~i%:r. f
.,o.•i ~ : .~..>ti,.rr>x r: ar fi >.,.t • . ~ v~~~~S~s>:37k~f
~1 1• r:••• rr•ti•ti••: "~:t y1•{~r: ! r r.I,r.N M
~ .
;f:r::f•::•:i:r~F}'~y"•:;a~= ~:.~:x~yqr••~,r r;: ~'r~..1•. rt•y;.t~.~.v'iS : tixrt~::~~:~, .s~~:;,>:f'•:tir!:o :Z?+ • .ao- ';~2.';':
Agreement to Pay Fees . ~ s.,.~~:,~.. ; .~..x m~:: .,.r; fi~~ ~ Y
, • r, L
Jyf. A • . 1•:.:: J
~ y:$Y.i,'v,: .::~~rv:r ~ •{y'{ } ~ ~ .}r :;:~i7t}{: r {r r.;tir,rr~x r.rr;; r . .r . r : > r. •r. 'h
f.'~M1':•. f: t.. ~1~M1 N.• .C . ::.~1 . } AJT~. $ v.v'.v}Xr .ti, r i~~~~+r. ~ hvw~
'.;~:.",r,.;,;.;;: ;:.;;i • r.y,•::.r:::x< ~ :;.•::>:.lv,,;~x~~~x ~a+?incyr ro +x• +s.~Y
X$G.S.r:.}r, i•y: ::tir;;} ••:`"4: •~'•:v 11) !
Irrigation Plan
1 'N : . . } `,,..tti:~: M1~. ~ A1 ~IJSf~f1.ti~ \
~S ~r{\~ ...1}•.1:~.~ ~ . f t~A Y ~~Y j \
I ~ .V.IJ•.'., r'J.•~<'..... • .:>:~.:f:~.'.::'... }.Y~~~.•~.tY~.~<~,/..~~~
;.~::~:w~`.`-y:r`.: ti; r,ti. r:? r'r:4~`:: ~f;::.:; •;::~:c;}",.' {'r t3~ fi t` t,3, i...~{;:;~; •4:
ILandscaPe Plan ~ ~ ~ . ~ ~ Y?~~~:,~
~.+::t:•~o's:x+.t~c;i;'. :.?r~;`•::~:~:'•~:%~:'•~~ac;;.~;:,i.::cr~i:;fyr;<~:y~i~:ir
~`:'S;:};:;:{:;:'T:•:; y'}\:,•y :i'G:ti"f::i:'i''"?i~~: '}:$::i;:;{•:;::;~?r ~.'r.r•`.~ :~i:<•:•::':~; •:•{i?';7:..,:Y
( ~ ~A•k~c~~:,.~~
Promissory Letter <:~~:~}r:.ri:~:;.;:.;r~~ f~.3•r~:::~.::~~>t `
mr r::~' .yr "'3 t'•~{?dr: k•~...:~.$~ ::;t''::':;~ }.•.,•;.,y.~? ,~f.,r f; : r;'y:~:.s;.•. vr 'k~ Y }r....<Sr`
~:.~w:~?tiriT•:1ti`<~'~.'.~.:.%: .S::r.4:~w4~iWGfr.~l.~..wZ:r}::l:tiv}Y~ i,i{~::{~rr':~{},r.v: C~r?L::'r,':~:{r:?~lv.1ifl.4i~i'.!C$i•'~Y'~~O*~~~..~.~.~bJ!•h?r.vr.ti-0~i~i
+ •}}titi •iF" :~vii r::;:j;: }:4:}rtiy~::::4 ktit:•::: r rtii:r` fYlf..•.•1.•:....~.'.~.~•.'~. 'l.4'f.1 f MJl}11L~'1. ylt:ti~}.".••
{ } v:r,h,,.::,.:_::::. .t : a~t.:~:k~~~~
1Landscape Cost Estimate. :<.;:~~:~;::.<::x:r;~:: :>::v; .ti•::::.,<:::r,~.~:~;~,{ ~ ~
1 1:%:C~:{; ;i:;:S;:?}r'•'.-}: `'.~:xAY~v ~ :k.S~ w r.. ~:?i i%':titi~ }^i i::~ ~ r......~ ~?y.: r:ti•:{tivih4i: iii;4S _rri Fvj r,•4'fi, r~~C{~Y2~Y{tY11,•!^f.{
::.}v:r~w.;.vr. 1~~MM ~}f
.ti }'r:}:}:~;:'{rr'~~'• :~}.r4^AS•.f.~~. • Yih{v,f,'\~~'L>
+TraEf c Circuiation Plan
~ ~ ~ ' ~ f. }.`.ti~i.'},': L~ f}': • ' _ _4_ M. •I~ ~L
. . r.
. '.Y. ~N'~ 4NfS}.1~f NAiJ.•J.•
. . . . . .
:S ♦ v~•.}y {:ti~};;ry::~.•.y..: ::;:}:..:•.r.•r, •:~:}ti.,... Z~,i, n..sA . rk.
. •
IConstruction Drawings tr?:.,..~; . :.r ~ Y•. . t:~ : ~~,^.~f. . ~t~
. "
i:'.~<;:5:: ti• ?;:i;. ti.;y ~t k, ..~r ....r.; <; . r:•:.:,sa.r•.l~••. • ~.2~::01+ :~»i r• k ~ ';i~,c~~+~~fif~~r:.,..
, • ~ . . ti ii>i}: , i { ~~s.v: r iti ~ii~::: : : Sf~ Y}^ i f.~~ ~
..3. • `:%•r..~a~t}3: ~ct<c:t~.~.. .::.'..r•.: ..!t:~: r.:~.? ~ ...<•~~.v,;f•it Y.~~; ~
ti:•'i'rr'%`r.t~l:tGx:'+.:{:"+.a:':f'_ ;{:?^~":{2 :{.}'?{;:r::::ir:r.f.} :;,C.2;hk;r ;4`i%?2;3•~;;.;~::>t;i • ,Y . l,~ ~if}'+.S;fwS:+i't
IFloor Plan I ::.~::,:::.r~:-:.:~.;~ ~'~V~;~,.,.~~~~ ~ : ~ .r . ~
• :'s c:y~.{tJ i a;:;:,;:{; ;:3;:::~:;y.4 ;4:.~:~: r:.•'.:-: ~::;}ht<;; .Rx '~''tS `,~fr . ;o->~; rs,:;{; }•p•
~ 1 ~,'•~'r~:~ :<~}:.}.rn./r.ti::itr.....:•.:•}:nr~v::y:?~,'r'r:~:%}i:•..i.... ...irwi:{?4i: .....tiv?..:'r.~+'OGyh~.titi~<Gi~ ..~..M{.n'{VN.
~ ~ ~ 1 1 1 I ~ .
1vt-v v I I I
The above items have beeti
rccci ved: 1993
Date of Transmittat:11 - 4,C{ 3 Review Coordi tor.
I
Circulatecl by:
Snoka,ie Coci,rt_y Divisiotl of Buildrngc * 1026 Wesf Broad►vny Avenue * Spoka„e, WA 99260 *(509)456-3675
.
~ ' si
A ' j+
, .
r ~
1
.!pw .
l_'4
~ M ~
♦
w
_
w
~ .
~ ~ 1 . t
( ~ - . ~
t ~ , 1~ I,~
' ' ~ w• •
1 ' t
.
~ ~
i
1