Loading...
8TH E 6102 WWP ADD SUB STATION FENCE & GRADING ~ Project Status Act„<< Engineer's Review Sheet 04TT-t F. 6102 As Bullt Plans Received Buildings File B98216 Road Plans Approvcd Companion Files: NeN<< Road Standards 5-15-95 Mylar Itelated Files: Hcaring: Buildiilg Dept: B9801192S Technjral Rcview: Laroe Lol j I31dg. Square 1=eet Preliminary Review: 11/24/1998 T)'pe: No I.ots Nb. Acres: Date Received: 1 U24/1995 IZange-'1'ownship-Section: 43 - 25 - 24 Project Name WWP ADD SUB STATION FENCE & GRADI11'G Site AddrCSS 03"1'11 E. 6102, PARCEL(S): (fii-st 18) Applicant Conditions Mailed: 35243.0707 Laura lsaak Flood 'Lo»c No WA WATGR POVJER CO Water Source Po Box 3727 Sewer Source Spokane, WA 99220 School Dist Phone Fire Dist (509) 482-4437 Phone Dist Owner WWP Po Box 3727 Spohane, V1'A 99220 Phone (509) 4524436 Buiiding Ph: 456-3675/Planning Ph: 456-2205 Contact: ROBIN BURRIS Uatc Submitted Description Cnitials Eng Need Technically Complete Eiig Priority Fees Rectived Eng Need Drainage I'lans Cnb Need 1 larvard Rd Mitiaation Eng Need Traffic tlnalysis Eng Need Other n Cng Pay Fees Received Eng Final Plat Fees Completed C;upy to Accounting ' . ~ ~ Notice to Public / Notice to Public # 1 3 4 6 Completed - or Needs to be signed Dcsign Dcviation 17atcs (ln-Out) l l ' l 1 / l - l l l l - I I / I I I I ! l 1 Bona quanues ror drainage item calcLilated - -Flearino l~ale Dccision - Ap}~ Dcn Cond Appld BC'C - - l Appealed to BCC Decisian App Den Cond Appld Court Appealed to Cnurt Decisiun App Den Cond Appld Stamped Mylars to Secretary (San(ly) Stamped 203 Lot Plans to Secretary (Sandy) 60A%(6j~r~J6 --TC= T~ - drw . . . ' ' `ECE! V ED D E C 30 1998 Project Transmittal SPOKANE COUNTY ENGIiVEER Division of Building Planning Wednesday, December 23, 1998 Site Address: 6102 E 8TH AVE Piofect Number: 98011928 Parce/ Number: 35243.0707 Zoning: U R-3.5 Fire District: FD 01 Appllcant: WASHINGTON WATER POWER (509) 482-4437 ContacL• WASHINGT4N WATER POWER (509) 482-4437 PO BOX 3727 SP4KANE, WA 99220 Permlt Use: 8 FOOT HIGH FENCE & GRADING PERMfT Building Landuse Enginm Utilities Heatth Fire Distrir:t S~rtr Q~ aw , vC`S 1C ~ 1z- ~ 22 ~ x ~.C~~ue~~rt - ~ ~ Coordinator RBurris . Comments: ~ . : Page 1 of 1 'z w ~ ` Washington Water Powk-: 1411 East N9ission O p N T ~ Q4Lt' • P.O. Box 3727 Spokane, Washington 99220-3727 ~ 1800-727-9170 x s ~ ~ /II~ o 509 489-0500 Telephone ~I _ ~,sra Utilities wwwwr Washington Water Po wer December 22, 1998 Robin Burris Dept. of Building & Planning Spokane County Engineers 1026 West Broadway Avenue Spokane, WA 99260-0170 RE: WWP's Ninth & Central Substation - Phased Expansion 6102 East 8th Avenue Spokane County File B98216 Dear Robin: This letter is in response to Spokane County's 12/4/98 letter on our phased expansion on WWP's Ninth & Central Substation located at 6102 East 8tn Avenue. This expansion project will improve reliability, allow for quicker service restoration, and allow for future load growth. WWP has budgeted for stage One & Two development and has future development planned as detailed below: Stages One & Two Development (Budgeted) • Construction of a six terminal 115 kV Switching Station • Integration of the four existing 115 kV transmission lines (Beacon #1, Sunset, Third & Hatch, Opportunity) • Construction of a 115 kV transmission line to the existing substation • Construction of an additional 115 kV transmission line (Beacon #2) • Landscaping Future Development (Not Currentlv Budgeted) • Construction of a new two transformer 115/13 kV distribution substation (will replace existing 115/13 kV distribution substation) • Construction of a 230 kV Station, including two transmission lines and a 230/115 kV Autotransformer. Substation Proiect Schedule • Winter 1998/99: Grading of the 115 kV Switching Station Site • Spring/Summer 1999: Rustake fencing, foundation & steel work • FalUWinter 1999: Electrical Equipment Installation • Spring/Summer 2000: 115 kV Switching Station Completion and Landscaping ~ , - 9th & Central Sub Expansion Deceiri.ber 22, 1998 Page 2 WWP XIRAWINGS (attached) E-35053 sht 41 Frelixninary One Line (far reference only) E-35053 sht 02 Preliminary Flan & Vicinity Map E-35053 s'ht 03 Prel-iminary Sectian - Elevation A-A E-35053 sht 04 Freliminary Landscape & Vicinity Map E-35491 sht 97 Grading Plan ALyreement ta Pav Fees Please see the attached copy of Engineer's Agreement Number B98216. Stormwater Manaarement In the Co-unty's letter, it stated th,at "The nanccompac-ted ballast surfacing of the substation yard is not expected to significantly increase the r-uno#f' fram the site," WYNP agrees vvith this statement since the four to six inehes of non-campacted 1.arge crushed rock coverYng the new site wil'l act as a large drywell and should contain a1l storm water drainage an site. Suill-Control and Aoui,fer Proteetion In Stage One and Tvo development, only Gas Ci-rcuit Breakers (GCBs) will be installed. These GGBs use SF6 gas and n❑ oil c4ntainrxient is necessary- Yn future developxnent, ail cantai,nment will be needed for installation of any power transformers. This oYl containment system wili be sirn. ilar ta the ane used at our Francis & Ced,ar Substatian, and cansists of a basrn lined with an ai'i containrnent rnembra-ne and filled with washed rock. Gradi,nLy Plan The substativn expansian area -is fairly f1at, and wzll reqaxire the removal, of 1ess that 50 cubic yards. Please refer to E-35491 sht 97 far rnore details. Texxa.-Dorarv Erosian & Sedimen.t Control Plan (TESCP) VWP vvi11 constxuct ashall,ow (I -font) ditch around the expansion s-ite and use straw haybales around the perirneter as its TESC1'. Landscauing T'he Preliminary Landscape P1an is shnwn an E-35053 sht 04. WWP distributed this drawing as part af the notificatian prvcess ta area residents (see attached copy). A new seven foot high chain lin'k fence with cedar slats (rustake) w-ill be instalTed and replace the existin,g six foot high chain link fence. Access Access to th,e expanded substation will be frorn the North side flf the praperty along Eighth Avenue and from the So~th side of the praperty alang Tenth Avenue. . ' y I gtn & Central Sub Expansion December 22, 1998 Page 3 Traffic Traffic to the site is expected to increase during the construction period. Major traffic activity will occur during the grading, and during installation of the control house and Gas Circuit Breakers. Once construction is complete, traffic will return to pre-construction levels, which will include monthly inspections, and occasional trips for operational switching and maintenance. Control House A 35 foot by 40 foot metal control house will be installed on a concrete foundation in the Southeast corner of the expanded site. The control house will have heating and air conditioning, and will be insulated. The control house will not be manned during normal operation. A small bathroom will be roughed-in but not connected until the County's sewer system is installed in the area (2003). Additional details on the control house will be forwarded when the manufacturer is chosen and the foundation is designed. Road Improvements & ROW Dedication WWP will have the missing type `A' curb on Dickey Road between Sth Avenue and 9th Avenue installed by a County-approved contractor. WWP will also install the 35' radius gravel cul-de-sac at the end of lOth Avenue near the South access road for the expanded substation. If needed, WWP can post a bond to guarantee that these improvements will be done. WWP will dedicate 20 feet of additional Right-of-Way (ROW) for the widening of gtn Avenue. I have already revised the landscaping along the Northern side of the expanded substation to accommodate the road widening. Should you have any questions, please call me at (509) 482-4190. Sincerely, H. Andy Anderson, P.E. Senior Substation Design Engineer AA : word Enc. r . ~ Washington Water Power 1411 East Mission ° P.O. Box 3727 Spokane, Washington 99220-3727 1 800-727-9170 509 489-0500 Telephone SOON To eF Washington WaterPower .i~IID rA Utilities December 18, 1998 RE: Ninth & Central Substation Expansion Project Dear Area Resident: Washington Water Power Company (WWP) would like to inform you about a substation expansion proj ect that will be occurring in your neighborhood. The old Ninth & Central Substation along Dickey Street will be expanded to include the proposed 115 kV Switching Station Site. The new substation will be landscaped and use "rustake" fencing, which should screen out most of the visual impact. I've included the Preliminary Landscape Plan and two photos of a smaller substation landscaped in a similar manner. This expansion project is one of several projects that WWP is undertaking since the devastating Ice Storm in 1996. The new substation will improve reliability, allow for quicker service restoration, and allow for future growth in your neighborhood. In the upcoming months, you will notice construction activities around the substation. We will try to limit our construction activities to normal working hours of 8 AM to 5 PM. Depending on construction crew availability, work will proceed along the following approximate timeline: • Winter 1998/99: Grading of the 115 kV Switching Station Site • Spring/Summer 1999: Rustake fencing, foundation & steel work • FalUWinter 1999: Electrical Equipment Installation • Spring/Summer 2000: 115 kV Switching Station Completion and Landscaping Thank you for your understanding during construction of this important facility. Should you have any comments or questions, please call me at 495-4190. Sincerely, a', c ,,ez - Andy Anderson Senior Substation Design Engineer Y ~ _ r _ i 7 ` , y~,~ ; , v.''"~ ' ~ r V _ ~ i ~ r .r. ^ . _ ~~r~ i~~ ~ 1 ~ ~ - , ~ ~ J ;'~i .f .r M _ - . y ...r ~ w :s:•~_ - . . `"1 +,~.r~- . _ _ ~ _ ~ ~ ~ . ' X ~ +f , ' ~A - P . r _w~ ~ - , , - ~ ~ , - . ~ + . s:-. - _ = ~ E ~ h ~ } . . _ r s . 1 S ~e1 , ~ ~ ~ ~ ~ : ~ ` : ~ ~ ~ ~ ~ i * ~ ~ ~ .~t ~ t ~ : - r~ ~ry ~ =~y~' ~ , . ~ rr . ' - _ 'c - a~- _ . 115 kY ~ ' ~SOSt"3 BEACQN ~t . l I NE ' (EXISIINC) ' ~p~ AHDSCAP NC l ! . ~BQRDER I I STN AVE . _ I _ _ . _ _ ~ - - ~ ~ , \~-CURRENi I ~ / OINERSH 11 `---CURRENT i►P OINERSNIP . BE15~Y 1 t 20' NORiH ACCESS ROAD ~~KtA~~,t ~ ` IIS kY uruRE~ ~ i 115 kV ~ . OPPORiUN11Y E I GHTH AVE ~ THIRD k HATCN , 3 DISi, UNE-~ IINE ~ EOGE 6F ASPHAIT - (E%ISIINGI ~ " LINE (EXISTING) ~ 1~ r~ t ` y PROPOSED ~ ~ ~ 11S kV ,`o" ~ ' e 1 T2SH R13EIN 26' ldl~DSCdPING-~ i / ~ I i $EC 2, BORDEB i 5111CNING ~ SPOKANE, CO., IA. 1~ i $TAiION SI1E i . ~ i ~ . 9TN A4E i~ FUiURE 91H AVE 9iH AVE W ~ i ' AY QR ER = ' C 130 k4 S1AilON i• 10 CRA El BOROER 10 GR El B 0 ~ g y ~ ~ E%PANSION I I ' p m r / x ~ ~ , x / o, ~ v c~ ~ J J O p < ~ ~ o ~ p . ~ o ~ 26' IANOSCAPINC : W s R • ~ BOROER W c, ~~i ~ W~ ~ ~ ~ ° 6 R 'N it ~ ic s - 115 kV OPPORTUNIIY IIRE ~ W~ ~ -y ~ ~ i EXISTING ~ o ~ R ~ ~ D ~ ~1 SUBS1AilON i ~ I . ~ ~ i $ITE ~ I , ,p m o- I I ~ o p. ~ ~ ~ J ' cn •D o • - m can~EO o , ' ~ i 1' NT, BY , J ~ °C 10TH AYE _ IOTH AYE _ _ _ Y - , RUSiAKE ~ ~ OiHERS) i Z ' r - v ~ FENCING ~ ~ ~ ~ ~ROUGN CRa~E K ~ ~ o ' ~ x ~-10' L~N~SCAPINC ,p _ El. 99,5 Q i BORUER 1 NT, ~ o- , I ~D ~RU51141SE FENCING - NOiE 1-~ I~. fCURREN1 Nl'P ~ ~ o- o , y - 1EL POIE OMHfRSHIP ~o o- ~ SI1E 1111 BE GR~OEO ~ ~ 6 IITH 1' 10 6' o- IIP PROPERTT IINE g OF NON-CO~IPACIED ~ lABGE CAUSHEO ROCK ~ ~ lANOSC~PE STRIP V I C I N I TY MAP ~ ~-iYPE I SCREEN ' ~ ~ ' ~ 00 ROi GAADE 8E101 IIS kV (TYP.) ~ RIP IIHE OF 1REES ~ ~ SUNSET IINE SCAIE: I'=100' 0 - IEZistiHC1 ~i ~ . 1EIIPOAART NATIVE • AN SC~IPE SiAIP TOP5011 SiOCKPIIE ~REti LEGENO l D ElIISTING PIHE 1'fPE I SCREEN N TO RENAIN (TYP,) ;oOE~Otr~ SCIENIIFIC NtiNE M COM110M HAYE ~ SI2E ~NAIURE Hf.X SP, i -~---t--------~-----q 11YP.) K A I J11 BEABERIS iHUNBERGII Ai80PUAPURE~ ~ 8ED-IE~F BARBERRIf M 30' HT, I S'YS' i ff ' A SE~' ~ TAII Fl01ERINC OUINCE ~ JO' Hi, ~ 6'r6' HOTES ~ B ~ 0 I CN~ENOIIElES CQR l i H~ C 14~ CORNUS SERICE~ ~ REDOSIER DOGIOQD ~ 30' HT, ~ 1'~10' A1101 10' GR~VEI BOROER OUTSIDE FENCE I R OUTSIOE fEHCE IBY M). m ~ P, eAllflOAD ilE BOROER'AROUND BO1H' 10 S ~ ~ 0 I 14~ COTONE~SIER ACU11FOlIUS M PEKINC COTONEhSiER ~ 30' N1. ~ 10'z10' ~ J Q OUND BOiH' SIDES Of UNDSCAPIFtG. J i E 0 COTONEASTER APICUUIUS• ~ CRANBERRY COIONEASTER ~ 18' SP. M 3'x6' 3. I IATER ii4P. e X I ST I NG i ~ ~ ~ 1. MOUNi 11MER OUISIDE Of FENCE ON 8'~B' f E ~ t~ '~I HONErIOCUSi 1flEE 7 I 1l2' Cal, ~ 21 ~16 ~ i W f I S IClE01iSIA TRIAC~NTHOS 'SNAOENASIER Ffti rF nN s•:a• PaST. _ NINTH ~C CENTRAL i o o = ~ NIP RU5 S, 'BUFFAlO' ~ BUfF~lO JUNIPER ~ IB' SP. ~ 12'~8' ~ J G ~ B I JU E W S~BSTaj ~QN i m N i5 JUNIPERUS SAB~NA ~ SAVIN JUNIPER ~ 1 HT. ~ S ~8 Z i ~ ~ ~ ~ , ~ ~ i ~ I ~ 8 I ~UNIPERUS C. 'iaRUl05~ ~ HOU111000 JUNIPER M 1' Hi, N IS'~19 ~ ~ 1 YA US IOENSIS 'PIEN~I' ~ BECHUI CRABtiPPIE ~ 1 1/1' CAL ~ 2S'x10' ~ , ~ o ~ ~ ~ " . ~ H K~ 2 YAIUS 'Ati01ANT' R~OIANT CBABAPPIE TREE I 1 1/1' C~L I 20 :20 ~ i ~ ~ NOfE 1 Q l I 0 I PHIlAOEIPHUS V.'YINM. SNOIFIAKE' IIOC% ON~NCf ~ ~0' Hi. 8'~8' i W 0 ~ PICEA PUNGENS GI~UGA ~ COLORADO BIUE SPRUCE ~ 8' Hi. ~ 15'i20' 10' GRAVEI 80RDEA ~ ~ ~ ~ 10' N I 0 I PINUS NUCO 'INCO' ~ MUCO PINE ~ IS' SP. ~ 6 K1 ~ ~ ~ N PIN S HIGRA ~ AUSTRIAN PIHE I 6' NT. ~ SO'xiS' . p/ 0~18~ U 81998 - a c _J 1 NA DI. PUflPIE IEAF PLUN ~ 30' Hi. ~ 6 z6 ~ C C N . c P ~ 0 I PAUNUS CIS E , , - i 0 ~ 6 ~ SYHINGA YUIGARIS CQWIION IIIAC ~ 30' H1. ~ 15'~10' ~r,/ o R ~ 15) iHUJA OCCIQENT~l15 'FASI1GIAiA' ARBOAVIIAE ~ 1' Hi. N 25'NS' 'io ~u'""xESS"°"° 1ENTN AVE. (DIRT) REFERENCE DRAWIN( P-- ! , Q Il O E ► ' ~ ~ Q PREIIYiNARY ONE UNE . . . . , . . . ~ . :NCE ORAYV I NGS a ~ d ' ~ IAiER V~IYE ~ PRElII11NARY PLMN d VICIHIIY MAP, OIST, LINE PBf~~YINtiR1' SEC110N.., , , . . . . . , , . . . . . . . . . . . . $HT. 01 ITY MAP. . . . . . . . . . SHT. 02 . . . . . . . . . . . . . SNT. 03 = 2'x3' BO% ' ~ SEE NOTf 3 g F ~ N R~ W a~ ~ >>5 ~~v suBSTA i N IANDSCAPE PL V SUBSTATION _ N NINTN & CENTRAL - SP K~ - , sc~~t: i~~so~ ~ K. o PRELIMINARY LANDSC TRAL - SPOKANE, WA. ~ Y ~ ~ = ^ PLAN & VICIN~ITY ~ NARY LANDSCAPE c VICIN-ITY MAP ~ ' WASHINGTON WATER F rON WATER POWER O • H l P ' SPOKANE.IASHINGTON ~ 0 ' . HOlEO I 11-18-98 CANE.MSHINGTON 98 '~f,XlittQ Ro~VD~ c ~ 3 ~IIJII(!~~ ~ REVISED IANOSCAPE PLAN ~ CJ I~1#9" u"`E ~ o~~f i 0 r ae it ~ 9 A00 NOfES f0 IINE Nti11E5 I DfSiCH~N~ CNfCKEO~ ~ 1 1 I d CJ 1 11-98~ IAPER ~CCESS ROAD f0 10' ~ CJ oa~~N ~oTCa 40- 1119A/QA -p►t! - ~ !q p~11E qEvISiON ~B1 qc0 a+ttKto NOif^ SNr_or_ o ' ~ ~H, ± ~ i _U5053 .~i .r. aw.s~ .~w~ . w~ . ~e . mswi+■~a . . a _~ew~i ~+iz ._.c.. . ~a*~eos~ . ~ ~ . • S l:> O lt G O U N T Y. DIVISlON OF ENGINEERINC AND ROADS • A DNlSION OF TI-iL' PUBLIC WO(2KS D1:PART,,vir-tw!' William A. Johns, P.E., Cowily Lnginecr Ucnnis N4. Scott, I'.C., Directur ! AGREEMLNT TO 1'AY FEES I:NGINELR'S AGREENTENT NUNII3ER 49 Tllis agreement between Spol:ane Councy and tJASHINGTON WATER POWER kuainC ui l1eisun) > whose interest in tlle projec[ is awner . ki.t. U•.vrXc, is entere(I into this 22nd day of December , 19 98 'rhis asreemeilt is applicablc; to the project ktlown as: WWP Substation Expansion, Eng. File No. 898216 (AP No. 35243.0707) , k t~LTress urft & iiie ilaiilber) T11at the individuals anci parties named herein as llaving an interest in tlie above described property or project agree to the following: 1. Reimburse Spokane County for project review and inspectioil fees as -specifiecl it1 Chaptcr 9.14 uf the Spokane County Code. The fees will be based on actual salary costs incurred by Spokane County for project reviews and / or inspections plus a ten percent administrative charge, aI7d will be bil(ed montlily as accrued. Any billing a►nounts clue, including any expenses incurred in the collection of an overciue account, must be paid prior to the County's acceptance of-the project for • filing. If a project is approved and/or filed with a balance still owing, the unpaid balance shall be paid within 30 days of the invoice date. ' 2. The undersigned agrees that tllese fees are due and payable upon receipt of the billing as speciFed abave. 3. Any invoices not paici within 30 days of the invoice date will be considered delinquent. If any outstanding ballnce on the account for this project is not paid within 30 days of the invoice date, iio ftirtlier revie;vs of the project Joc<<inents wilI be conciuctcd uiltil the entire aCCOUIlt t)al1[1Ce is - paid. f1iiy balance on the account for this project not paid within 65 days of the invoice date may result in legal action or the initiation of other collectiocl procedures, includins referral to a collection ageiicy. "I'!le Sponsor will be liable for any and all expenses incurred by the County for the collection of overdue accounts. 4. Tlle 1110I1tIlIy b1lIlllg SIlOUId be SEI1C t0 tlle 1tCC11t10(l 0f: NAME: Laura Isaak, Permit Coordinator Avista Utilities ADDP.CSS: PO Box 3727 C]TY, STATE: Spokane, lJashington 99220 ZIP CODE: 99220 PHONE 1#: (509) 495-4437 FAX # (509) 495-8734 1 utlderstand that failure to pay these fees may result in delay in coizipletion or approval of the project or other possible sanctians. , O If this fee agreement is completed by someone otliec- tlian the Sponsor (i.e., the project owner or a principal in the firm sponsoring the project), such as the Engineer clesigning the project, then written authorization from the Sponsor specifically authorizitig the Agent to ctecute iliis I'ee . Agreement is attacheci to this Fee Agreem t. WASHINGTON WATER PO ER siGr~ATvRC Laura Isaak. Permit Coozdinator (PRINT NAIvIE). RI;7'URN YELLOW COPY TQ SPOI{ANE COUN'I'Y rNG1iVrERS k1t\agrcefee.cloc 2/1196 1026 W Ilraaclway Avc Spokane WA 99260-0170 (509) 456-3600 FAX.: (509) 456-2243 '1'DI): (509) 324-31 GC ' I , - " ~EC~~VIF.I~ ~ ~ 4-1 C PEl 1MIT DOCU1V~E~1T TRANSI~ TTA~,, Ir',3J ~~ii,.'~~;~`' ~a~~tilf~~~A SpoS~ane Caunty Di~risian af Buil+dir~gs ~ 1026 VII Braadway Ave. Spokane, WA, 99260 P roje ct Addre ss: D Project BusineSS Name: I~' CONTACT; Phone: :Mafling AddreSS: ~ ~7.`r-_-~-~~:•~ ~'~4~'~ , ~4>~~~r~,~.i~..[~ ~l~r`~ Ct~►~~~~ y CC)ORDINATOR; ~_A V_ Phone: DOCUMENTS CIRCULA1TED Fire Descripti/~ ti.+n 8ulidinQ Zoning rmnqlneers ~ Health Ois!# UtilitfeS SCAP'CA -CTC . ~ ~ . - ~ ~ ~ ~ . 1 . , Received Sy - C'rcutated by. Date af Transmittal; , . . P10]ect Nl,lillber: 98011928 ` -YL1V: I Appi1caitoI1 J D2Yte: 11/23}98 PAge I Of 2 1 ~IS It7 NOT A 1 LrRMIT • - Penalties wifl be asssessed for cvmmencing work withaut 'a, permit Paraiect dn-fot'matian: ZyV'i~V55. Femllt TTSe: 8 F'DOT MGH FENCE & GIiADING 1'ER1.17IT CaIIW: WA5WG'I'OIY WA'T~'.1tPUW Address: PO- BQX 3727 Setba.cls: Front Ixft: Right; Rear: c - S - Z , S~OKANE, WA 99220 Phone: (509) 4824437 ►Sife Informatinn: Plat Key: 000344 -Name: CENTRAL gARK ADD District: F - ParceINumber; 35~'.43,07DT SiteAddress: 6102 ESTH AVE Owner: Name: WASHINGTDN VV~TJER PDVf+f SPflKANE, WA 99212 Adtlress. P(] BOX 3727 L1o;ation:: SP(3 5POKANE,WA 99220 Toning; UR-3,5 Watei Di$tCIC#: ~ONVN Ho1d: 0 Aiea: D Sq I+'t Width: 200 I)epkh: 2$0 Rigbit C]f WSy (ft): bU Nbr of Bldgs: i Nbr ofDwellwp: 4 . ReVIew InfO,FmGtiDn.' . , , - Departtnen# R►eY1ew, BUiLDING Plan Review ~ Cvmments: BUIGDE'i'G Landuse Review , . Gomments: . , ~ ENGMER Si#e Drainage Review , - Comments: p6rntitS: ~,.~.m. • . ' . , , . . . , ~ . _ . . , - i - S P O K A N E .o C O'U 114 T Y BUILDING AND PLANNWG • A DIVISION OF THE PUBLIC WORKS DEPARTMENT JA,LIES L. MANSON, C.B.O., DIRECTOR DEtvtvis M. SCOTt, P.E., DtttECroR November 5, 1998 Laura Isaak, Permit Coordinator Washington Water Power 1411 E. Mission PO Box 3727 Spokane, WA 99220-3727 Dear Laura: RE: RECONSTRUCTION OF WWP NTNTH & CENTRAL SUBSTATION I received your October 22, 1998 letter in which you describe proposed expansion of the eYisting WWP substation located at Ninth and Dickey in the Spokane Valley. In response to your letter and specific questions, staff has reviewed the site plan attached to your'letter and determined the following. The subject property is currently zoned Urban Residential-3.5 (UR-3.5) and the UR-3.5 zone allows public utility facilities as a permitted use subject to Section 14.616.210(B)2 of the Spokane County Zoning Code. E.cpansion of the existing substation will require compliance with the development standards of the UR-3.5 zone with respect to building height, setbacks and the fencing standards specified by Chapter 14.810 of the Zoning Code. In addition, the site must be landscaped as specified by Chapter 14.806 of the Zoning Code. Expansion of the existing substation may also require adjustment of the present property configuration to aggregate various WWP ownership/parcels into a singular parcel. Parcel aggregation can be accomplished through the Certificate of Exemption process similar to the previous exemption issued for a portion of the site (see attached copy of CE-448-98A). For your assistance I have enclosed copies of the cited sections of the Zoning Code and a copy of your letter will be forwarded to Jeff Forry, Senior Building Technician, to schedule a pre-application conference. More specific information about the SEPA process and building permit requirements will be provided at the pre-application or pre-construction stage. If you have any questions or require additional information, please contact me at (509) 477-3675 ext. 206. Si er , RECEIVED G~ SPOK~INE COUNTY OHN W. PEDERSON Senior Planner NOV 2 3 1998 hrd 'ND PLANNING BY: Enclosures c: JetT Forry, Sr. Building Technician 1026 WEST BROADWAY AVENTUE • SC'OKANE, WAsHiNcroN 99260 PHOtvE: (509) 456-3675 • FAx: (509) 4564703 TDD: (509) 324-3166 • . j; r • • - - October 22, 1998 Mr. John Pederson Spokane County Building & Planning West 1026 Broadway Spokane, Washington 99260 Re: Reconstruction of WWP's Ninth & Central Substation Dear John: Washington Water Power (WWP) has an existing substation, which we call our vinth & Central Sutistation, located between 9`h and 10`h Avenues and along Dickey Street. We plan to expand the substation as shown on the vicinity map, No. E-35053, Sh. 2 of 3. Construction on the site will proceed in at least three major phases. Phase One will be the creation of a 115kV switching station with six 115kV transmission lines. Completion date is estimated to be October 1999. Phase Two will include tying together various transmission lines, reconstruction of some, and the addition oE a 230/I15kV autotransforrner. Tentative completion date is October 2002. Phase Three construction activities are the rebuild and integration of the existing 115/13kV distribution substation. Tentative completion date is October 2007. WWP currently has several 115kV transmission lines in the vicinity of our Eighth & F'ancher Switching Station and our 1Vinth & Central Substation, as you can see from the attached aerial photograph. We plan to rebuild and consolidate those two stations into an expanded vinth & Central Substation. Only minor transmission line construction is needed to re-route the existing 115kV cransmission lines into che expanded substation. WWP will ask for the vacation of 9~' Avenue between Dickey Street and Eastern Road to accommodate the expansion An abbreviated public involvement process wi[h area residents is planned. WWP is currently working with Mr. And Mrs. Babcock who live adjacent to WWP-owned property. We will ask for approval of grading, fencing, approach and panelhouse plans by the County. The panelhouse, as with all of our substations, will be an unmanned control building. We are proposing a 30 foot landscaping border. The site will have a gravel groundcover and appropriate oil containment. Please review the attaehed drawings and this letter, and (et me know if you think anything will be required from a zoning or use standpoint, or by way of a SEPA review. I would like to arrange for a pre-application conference soon, and would like your assistanee in coordinating that with the appropriate County departments. My telephone number is 495-4437. Thank you for your time. Sincerely, Laura Isaak Permit Coordinator • 12/16/98 Pa. Project Number: 98011928 In~: -7 ~ Date. , ge 1 of 2 .0 APpI1CatlOII , . THIS IS NUT A PERNIIT Penalties will be assessed for commencing work without a permit Pro#ect Informah'on: .yM1M1~NK~IN~N MN ~ Permit Use: 8 FOOT ffiGH FENCE & GRADING PERMIT Contact: WASHINGTON WATER POW Address: PO BOX 3727 Setbacks: Front Left: Right: Rear: C- S- Z SPOKANE, WA 99220 Phone: (509) 4824437 Site Information: 'vw.+nvSA..Nwavf.'~'lf.Cfi:CC " ~S v,wa dw»vaYY Plat Key: 000344 Name: CENTRAL PARK ADD District: F Parcel Number: 35243.0707 SiteAddress: 6102 E 8TH AVE Owner: Name: WASHINGTON WATER POW SPOKANE, WA 99212 Address: PO BOX 3727 Location:: SPO SPOKANE, WA 99220 Zoning: UR-3.5 Water District: 999 UNKNOWN Hold: ❑ Area: 0 Sq Ft Width: 200 Depth: 280 Right Of Way (8): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 0 Review Information: &i~axwaa~~~~~a~~.~'~vr..~: :\~`~~rw~.'w.'~..~?~3id3xvk~ . •••,••••v:~wisaa~aaassasa.w.wxwo-~s~:.z.'~3. xayoca»»xuns.wia=o-~~t'siak.~~wkv.~kwa.toaararNSas Department Review BiJII.DING Plan Review , Comments: BTJILDING Landuse Review .f, Comments: ' ENGINEER Site Drainage Review Comments: • ' Permits: SRfiZ~S~tiNrn'~\~\ Q ~C~fCC.~: iuwA•~`1t]IC4SL~ .7: . ♦:4ti.4. /ikA , ~ • . . . . . _ ~ ~ 6AD) , ` Aav coPY , S P O K A N E O LJ N T X DNISIOIV OF EiVGINEERING AND ROADS A DIVISION OF THE PUBLIC WORKS DEPARTMENT William A. Johns, P.E., County Engineer LETTER OF TRANSMITTAL Spokane County Engineers January 4, 1999 . Andy Anderson, P.E. Avista Utilities 1411 E. Mission P.O. Box 3727 Spokane, WA 99220-3727 Re: Grading Plan Review for Ninth & Central Substation Dear Andy, My preliminary comments along with the County road standards and stormwater guidelines have been generally incorporated into the preliminary plans stamped December 221 1998. The grading plan will be acceptable upon making the following minor revisions: l. Include the applicable standard construction notes per the attached Exhibit B; plus show the TEC measures you mentioned on the plan. 2. The new approach on 8`" Avenue should be paved with asphalt at least to the new. right-of-way line; and increase both compaction levels to 92% for the new cul-de-sac. Please submit (3) copies of the revised Grading Plan (sht. 97) for acceptance and project release by the County Engineers. The previousty mentioned right-of-way dedication and performance surety for the road improvements will be made conditions of issuance for the control house building permit, and not the grading permit. Sincerely, Isey gl. Gary W. Nyberg, , c . . ~ ~ n 1 f Plan Review Engineer , . ~ ' . . . • • r J v ~ J 11 ) ~ ~ 1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 FAX: (509) 324-3478 TDD: (509) 324-3166 : f ~ ~ ► ~ P°. '1 ~ ~ 1 : : xs-~ 01~` 1240 ~ dw~ E OFFICE OF THE COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Project: WWP Substation - Phased Expansion Address: 6102 E. 8th Contact: laura Isaak, WWP (482-4437) Engineer: WWP Meeting Date/Time: None Scheduled Engineer's File B98216 . Tax Parcel 35243.0707 Reviewer: Gary Nyberg, 477-3600 Ext. #257 The County Engineering Department has completed a preliminary review of the above- referenced project. The following items must be received and approved prior to release of the building permit: [ ITEMS OF SPECIAL IMPORTANCE ARE IN BOLD PRINT ] 1. An 'Agreement to Pay Fees' must be completed and received by the County Engineers prior to review of the civil plans & project. (See yellow form enclosed) 2. A site drainage plan and report shall be prepared by a Professional Engineer, pursuant to the County `Guidelines for Stormwater Management'. (See attached blue form `Checklist' for minimum plan and submittal requirements) The non-compacted ballast surfacing of the substation yard is not expected to significantly increase the runoff from the site. Spill-control and isolation will be required for the extensive electrical equipment regarding aquifer contamination. PLEASE NOTE: Soil Conservation Service(SCS) maps of this vicinity indicate 'Springdale' complex soils which are pre-approved by the County Engineers for standard drywell use. The map indication should be confirmed by on-site exploration prior to the drainage plan design. 3. A grading plan prepared by a licensed civil engineer is required for grading volumes in excess of 5,000 cubic yards pursuant to Chapter 33 of the Uniform Building Code(UBC). 4. A temporary erosion and sediment control plan(TESCP) is required for site disturbances in excess of 1 acre. Spokane County has adopted by reference Chapter 5, Volume 2 of the Stormwater Manaaement Manual for the Puaet Sound Basrn by the state Department of Ecology(DOE) for regulation and guidelines for erosion control measures. Spokane County Engineers ~ ~ ! 5. The subject property is affected by the "Findings and Order" and the "Conditions of Approval" for the following land use action: * Spokane County Zoning Change No. 25-67 * Final Plat of Central Park Addition There are no known engineering conditions or requirements from the above actions which are applicable to this project. 6. The subject property is within the following special regulatory zones which may affect the development plan: * The Aquifer Sensitive Areo(ASA) which requires treatment of stormwater runoff from developed surfaces by grassy swales or other means prior to discharge. * The urban PM 10 Non-Attainment Zone which requires dust-control surfacing on vehicular parking areas and traveled ways. 7. Road L Storm Drainage Plans and Right-of-Way(R-O-W) dedication needs to be prepared for improvements to the following County roads: Dickev Road (8fh - 9th) - Add Missing Type `A' Curb lOth Avenue - Construct 35'R Gravel Cul-de-sac (45'R R-O-W available) RID agreement `Notice to Public No. 6' 8th Avenue - Dedication of 20' of Additional Right-of-Way (County Arferial Road Plan designates 8'" (Park-Freya) as a Principal Arterial and 100' R-O-W width required with only 60' existing) 8. Additional Road Information: 9th Avenue between Dickey and Eastern is presumed by the County to be "ancient" right-of-way formerly vacated by operation of state law, as it was dedicated by the Plat of Central Park Addifiion c. 1890. Development and private use of this properfy is allowable, however WWP may want to clear title to the former right-of-way through Superior Court "qviet title" action. Please contact Verril Smale, Engineering Administrator, at 477-3600 Ext. #406 regarding road requirements for this project. In summary, the following items must be received and approved prior to the Engineering Department releasing its portion of the permit: Agreement to Pay Fees Site & landscape Plan - Drainage Plan & Report Road Improvement Plan & LID Agreement Please direct all submittals to Robin Burris of the Department of Building and Planning. Spokane County Engineers ~ • • ' , _ . , / • . SPOKANE C4UNTY ENG/NEER/NG DEPT.. . . M/N1MUM REQU/REMENTS CHECKLIST. ~ . . - . . . : . i . ♦ . . . . , . . . ~ ~5~►,~~ . . _ . - - . Project . W JP , . , . . . . _ County Reviewer: _ ~ - • - . : . . . _ , . . . v. The foliowing is a li o min mum standard items used in reviewing pians, for building permiitss. 1Nithout ~these minimum cequire s the Spokane County Engineer's Department is not able to perfomn a review . of the project. The project wiif be retumed to, the applicant or.heid without further review until the : minimum items have been submitted. D aEOWRED eY T+~s PRaECr:.L . : : _ - . - • . , „ . _ - , V • , . , . . y . - , . , . . . . . . ❑ NorAPPucAeiFro TMIs ato,rECrr - - . _ . ; : : ` : • _ . - . ~ An agreement to pay fees must be received before review of the pians wi{{ continue., it is an. agreement between an interested party (owner,agent, etc.)'and Spokane County to reimburse the County for costs accrued in reviewing the plans. - - - - - - - _ , . All plans submitted- to this department are required by state law to have a Pcofessional Engineer's stamp. The Professional Engineer's stamp must include the current seal and expiration date, as weH as_ the dated Engineers signature: The Engineer must be currently registered in the State of Washington. North Amow must appear on the plans.. . . , - . .Kb An appropriate engineering scale is required for the plans. A benchmark must be shown on the plans. . A benchmark is a physical mark or object used as a , reference for elevations. This poirrt must be left undisturbed by construction. . . . . . , ~ . • . . . . Road names must appear on the plans. .~7 Right of Way dimensions, from certterline of adjacent_ r+oads to propeRy iines must appear on the ' plans. . . - ` ' 10 Property line dimensions of the entire parcel must be shown, not just the portion being constructed. 1(0 Provide contours or sufficient spot elevations to check site grades. One-percent is the minimum re uirement without special construction requiremeMs by a licensed engineer. ,0 Land required to be set-aside for future aoquisition by the County for future right-of-way needs to be shown on the site plan. Required 208 swale areas must be outside of set-aside area. _ JV0'208' Calculations for the site are required for runoff of asphaltic surtaces (pavement, roofs, etc.) within the Aquifer Sensitive Area. Show the quantity of asphattic area, volume required and provided, swale area required and provided. . 0Provide a copy of roof detait sheet or state construction of roof. Metal roofs do not have to go to a swale, while aspha{tic or buin-up roofing is required to be handled by a swale. If HVAC equipment is proposed to be located on the roof then the, roof area needs to be included in swale calculations unless the HVAC unit is ssaled and self corttained. . KQ Show a typical section of a swale. The swale must be sodded and side slopes should not be steeper than 2:1 for up to 12" in depth. For swales with greater depths use 3:1. The top of the swale should be a minimum 2' above the drywell lid. . . , -~O Provide bottom of swale elevations. e 1 E3 Provide details of Spokane County Type A and/or 8 drywells. . . Provide drywell grate elevations. ~ Guidelines for Stormwater Management ' . Spokaae County, February 1998 • ' . . ' • . . . ` . . WO A Spokane County Type 4 drywell lid is required for drywells. Specify on the drawings this type of lid. . . . , . ❑WCertain locations within Spokane County Require special testing to deteRnine suitability of soil for drainage. Provide a detailed soiUsite report from a licensed geotechnical firm. Report must include soil. logs to 20 feet in depth or bedrock, indication of ground water and infiitration tests. i(P Calculations for all grates, pipes, inlets, ditches, etc., must be submitted. - . • ' ~ . . )(0 A Landscape Plan is required to ensure swale areas are not confliciing with landscaping. ' W0 A traffic circulation plan is required for this project. This plan, may be incorporated into the site plan unless specifically requested to be separate. ; ' - . . - - . . . . . e . , _ . . )(0 All traveled surfaces are required to be paved unless a paving waivee has been granted.- ❑ A letter from SCAPCA is re u~~red for ~q projecis requesting a pavemerrt waiver. 'The letter is obtained by this department after a written request is received from the applicant. A pavement waiver is required when a portion of a site is not paved when othervvise required to do so. • . . All parcels must be aggregated. If impossible, a reciprocal use agreement is required for this projeci. It is an agreement between the owners of two or more parcels granting reciprocal use between the properties: Situations that may require this agreement include: 'ingress/egress, parking or drainage . . across property lines. --This'agreement is a legal document between the parties, involved. -For more .-information, contaci youc land use attomey. _ 0 Approach permits arerequired on all new approaches, as well -as all approaches that wilt be aftered. . Approach pertmits will be available after final approval of the site/drainage plan. , ~ Complete road and drainage plans are required for improvements to the roadway. Mylars with the developers signature will be required before the plans are approved by Spokane County. 00 A bond or some other form of financial surety approved by Spokane - County is required.- To _ expedite your request for a building permit, the Courriy has 3 pre-approved bond fonnats. If you choose to use a different fortnat, a member of the County's legal 'staff will have to review the language. .This will ` . t likely resutt in delaying the permit review process. The amount of the bond will be calculated by the Vo nty after the frst submittal. . A ro ertdeed is requi . p p y red if the applicant decides to proceed with a Road Improvement Distnd Agreement. This is an agreement to not protest the formation of a Road Improvement District. This document is required in lieu of making necessary roadway improvements. A deed is also necessary if right-of-way is required. . ' ~ This list is not inclusive of all of the requirements needed nor will fulfillment of these m;nimum requirements automatically result in approval from this department. . This checklist is meant 'to help expedite the review process by assuring that minimum items are available. The County welcomes comments conceming this checklist to assure that it is fulfilling its . purRose - helping the review process be more efficient. Please dired all comments in writing to: ' Development Engineering Services - ~ . . 1026 W. Broadway Ave. - - - Spokane WA 99260-0170 . . _ - , . - ~ . . ,r. • . ~+r • Guidelines for Stormwater Management Spokane County, Febniary 1998 . . ~ ` \ 1 r~ . . t Projeet Transmittal Division of Building Planning _ Wednesday, December 16, 19 Sfte Address: 6102 E 8TH AVE ProJect Number: 98011928 Parce! Number; 35243.0707 Zoning: U R-3.5 R ~C ~fV~D Fire Olstrict: FD 01 - DE C 1 l 1998 Appllcant: WASHINGTON WATER POWER .(509) 482-4437 SPOKANE COUNTY ENGINEER Contact: WASHINGTON WATER POWER (509) 482-4437 PO BOX 3727 - SPOKANE, WA 99220 Permit Use: 8 FOOT H1GH FENCE & GRADING PERMIT . ' . ~J,• . . 6uilcfing Landuse Engineer tltilitie.s Heafth Fire Oistrid . , , ~~M saE P«N x x . ~ . . : , _ . . . ; Coordinator . RBurris Comments: " Page 1 oj 1 Y~ Washington Water Power Z 1411 East Mission P.O. Box 3727 E Spokane, Washington 99220-3727 1800-727-9170 FiECEiVED 509 489-0500 Telephone SPQKANE CpUNI'Y Washington Water Po wer D EC 16 1998 DI1/ISION OF 6UILDING AND Pl.ANNING QY; December 10, 1998 vtr. Jeff Forry Spokane County Planning Dept. West 1026 Broadway Spokane, 1Vashington 99260 Re: WVVP Ninth and Central Substation Expansion Dear Jeff: Enclosed at-e revised drawings for our proposed expansion of the Ninth and Central Substdtion site. Please replace Sheets 2 and 4 of E-35053 and Sheet 97 of E-35491 with these revisions. also enclosed is a completeci environmental checl:list for the project. I understood grading and fencina permits would not be issued prior to a SEPA review. I have reczived Spokane County Engineering's request for additional information, and that will be submitted within the next week. If }rou have an)r questions, please call me at 495-4437, or Andy Anderson, the project engineer, at 495-4190. Thanl: you. Sincerely. • L 4- Laura Isaak Permit Coordinator Enc. ~505~-3 ~ a . ~ • IIS MY i BEACON i1 , IINE IIS MV BEACON t4 LINE S4Y~' . - ~ SEC 21 115N, R~JEIhI ' . ~~5~'~~ 210'0' SPOKANE, CO., IA, ~ _ JO' I~HDSCAPING BOROER CURRENI IIP ~ OABERSHIP ' r~ ' . ~ ~ _ _ 81H AVE _ FUTUBE ►ENCE ~ 11S kY . ~ i BEACON i2 ~ , + UNE / FUTURE FENCE , ' . ~ o ~ ' Wy ~ i IIS MV THIRO 6 HATCH IINE i ~ W ~ i • 115 kY 6PPOAlUN1T'f UNE ~ 30 ~ i ~ _ I1S kV ~ ~ ~ i IIS kV ~ iHIRD a Hd1CA ~ OPPORIUHITIf i IINE W ~ i ~INE Y i _ ~ ' ~ ~ PAOPOSED ~ ~ a A ~ i IIS kV , ~ i 111 IN : _ ..4.... _ ~ S CHC i ~ fU1URE 2J0 kV S1ATION 1 i ST~TION SITE i ~ ~ , i 9iN AVE ~ ~ 9TH AYE m ~ ' ..I.. --1 FUIURE ~ I ~ W < ~ Yr FUTUBE ~~~......T .Y,..r,.. ....r.,.~ . ~ 230 WY S1A116N i ~ f1R ~ ~ MPNI ~ ~m ~ i BUS ilE c~~..}...-'r-•~~~-t- ....r~ .............l........................ U U E 230 kV E ~l S ON > > . ~ ~ , , y' i ~ ~ ~ . ~ ~ ' ~ " BE~CUN UNE ~ i _ ~ " i ~w ~ ~ " : ~ " ~ ~z ~ ~t. ••i..:.''I.",'~.. ...~1.. n < a, ~ ~ • ' ~ d ~ e~ja i = ~ ~ I . ~ r ; ~ / ~ o q~'• t•- •~T T't ~ ~ I I ~ ~ o ~ fi ~ i ; : ~ i : ; ; 1 ~z ~l-JO IANOSCAPING , z < i ; t..,~........_....;;....-r-,•ti ; ~ . W iW~n ~ BOflDER i W r ~ i ~ ° ~ io W i . 8 , o _ s r / in , ei ~ ~ t ~7 3~= 1 uwi o ~oo / . I W , i i : ~i~~ ~ ~ ~ t..:..~T, ~-r-..:;....~..~.. .........i I EXISIIHC i' ~ i I ~ ' ti~ ~ ~ ~ p SUBSIAi IOH ~ ~ ~ ; 't••i-f~l~-r-.. ....r.; .........i FU1U E 130 M4 ~ ~ ~ i~~ 1~ ~ BENEA~H LINE 51TE FUIUAE FENCE ~ ~ ' ~ ~ ~ , ~ i~''~~~..~..,, ..;........f i i ~ ' , ;;o :tt . ,,r.........~..; ~ , n , , ~ ' ~ 101H ~YE ~ t01H dYE r..i-i-.i~-~..........,;_...Y - - ~ ~ } . ~ .w. _ ~ r . ~ + ~ ~ ~ i i ~ CURAENT N1P W i ' ' ' ' , ~ f OINERSNIP = i fRAHSF ~2 ~ ~ • ~1 y ~ u`~, ~ ~ W ~ 1 ~ 1 OWz ~W,E I N I ~ U m V ~ ~ ~ il ~ W ~ ~ /i ! ~ ~ UICINIIY ~IAP ~ I O~ U N ~ I ^ ~ TRANSF !I W ~ ~ ~ , ~ o~w ~ I15 kV ~ o s c~ < ~ SCAIE: 1'=100' ~ ~ i i SUHSE1lINE ~ ~ ,.~~a= iUTUAE FENCE ~ I 1 1 ~ ~ ~.J ~ i 1 '~~i ~ i i~ ~ ~ ~ . _~______'i ERISTING SU85Ttiil N-~ 0 REFERENEE ORA~INGS DRAWINGS PBEI I Y I NARY OME l I NE , , , , , , , , , , , , , ~ , PHEIIYIM~BT SECTION. . . . . , . . , , . . , . . . . . . . . . . sE+T. 01 ..........SNT.03 PPEIIYIM11R1 I~tIDSCAPE PI~R . , , , . . , . . . , RECEIVED ..........SHT.0/ NE COL`~`~' ~ . _ SPOKA . ~ , _ ~ ~ 115 kY SU8STA110N BSTATION ~ N I NTH ~ CENIRAL - SPOKANE , U 8 9 . ~ 9 . 1 _ PRELIMINARY PIAN & VICINIiY - SPOKANE, ~ WA. & VICINITY MAP ~ y , - _ WASHINGTON WATER POWEA 9ATER POWER ° G AND ~'~~~~i3P" SPOKANE,1'ASNINCTON N ~ O ~ SMINGTON ~ ~ MOTE~ ~ 12-J-91 ~PVAOV i B - 3 III•~D•!1~ f~1(R ACCESS ROdp 10 ~0' st~tt I oarE n ~ Cl ~9- _-1~~~ ~APPROV~O 0«0 ( ~ dMOERSON ~ 1•28•99 ~ 2 ~II•Il•It YOY( PdRtlU9U5t o[s~c~ cwraer 1 ~E•6-9! ~ R[IpY(D Ui BAl1M 1 iIODiD fUfllAe OISI. IBAMSfORII(RS ~ ~J ~A'' DRArn ~ l~f$ r~iEA o~~~ ' /-26-98 o~ic . ~ I oaiE I REV i S i ON I er ~ CKp c~~aEO ~o,cr ~W s„r 2 a 1 W . . _ " " _ " . , . _ . . _.a i . , _ . . . _ w• " ' • ' . _ . . . . . . , ~ _ , ~r? or ~ Ja' I ~l ~ ~~a~~-3 • 115 kY ~ ~ BEdC4N +1 ! I LIH[ ~fl' LpNO~~PING BQRpE R ~ 1 SiH Av[ ~ ~ aa5 kV - ° - - - ~ ' @~ACU~I 1~ ~ ~iaE % 3 FUI~IRE FENCE I~ ~ ~ ~-CURAEHi ~RI • . . i UfHERSHIP ---CURRENi TIP OFHERSHIP t 7b K4R1M ~6CESS R~AQ • i ~ i i~~ kv ~ ~~sr. uHE ~#GHTH ,~Vf . , . ~ , EUGE QF 115PHti11 ,,,o,,,, , FHIR~ k H~iCH ~p ~ LINE ~ ~ , 115 kY -ORPORTUkfT1f r~ f ~ 'a s s s s ~ 1 ~ ~ ~ ~ r~ s 6 s s$~~r' • i e ~ PRbPO5E0 v i LIkE s• ' 6 6~.•' ' H SFC 1~. I25H~ R~3E111 P6 LANUSCAPINC-~ i 115 kY ~ I $POICAHE~ CO., IA. BORDfR ~ S~NIiC~IIHG ~ i ~ 51~PIpN SaTE r ~ i ~ ~ I ~1 I + ~ 10' GRAVEL B~R~ER i0' GR~IVEI B~R~fR x ~ 9iN AVE F i`IA[ ~ 91N ~YE r ~ -rti-~~~.,~..~-A~ - ~ U V i ~ ~~-^t 9iN AYE ~ d ~ ~ ~ ~ . ~ { 236 kV 5TI4i 14~ ~ ~ , fIfIURf f~NCE i ~ ~ ~ ~ ~%P~N514N 'r G i. ~ ~ ~ { ~ . l U- ~ V ! F W ~ ' W 4 a • I ' Q . a R ~ 1 ~ / ~ ~ s a ~ 0 2&' LAN65G~PIkC Y ~ ~ ~ i I w~ BOR9ER F ~ 115 kY ~PP~RiUNiTY LINE i ~ i~: ~ i K A ` i I ti~ i l ~ ~ I 4 F ~~~51~NG ~ ey l I ~ o p i ~ F SU6SIATiOH i I ~ . ~ ,Q ~ i ~ S I i E i F U T~ R E F E K C E i ~ ~ . ~ ` ~ ~ w J 7~ Mi. I4~E6 ~ ~ ~ ~__~~,..r ar • ~ RU51AKf~` N TH , ~ ~ i ~ ~ F{HCIN~ r 0 fRS~ R ~ ~ idiH ~VE \ 10TI1 ~IYE ra ~ ~ R~11GH GRAaE ' R ~ 1 w ' ~ ~ - - - ~ -0 fL. 99,~ ~ s ~ 7' ~li, a ~ ~ -0 ~RUSiARE FEHCIHC , ~ + ~ 4p l~Ha~CAFIHG ~ ~~tE z ~ saaaER ~ a I ~ a._ l~fl, FOLE~ I ~GIJ~RE~T r1P ~ ~ S~iE flll 8E GR~l1E~ ~ , afiIERSAIP 11iH 4' ip 6' 0' 1'1P FRpP~piY IIHE 1 ~ 5 UF HUH-GD~PbCiE~l ~ I L~RGE CRUSHEa Rflpc ~ a ~ ' i ' i ~~~HpSGAPE SiRIP ' 1 trF~ ~ 5er+E~N + ~trp, ~ 1~1CINITI' I~~,P P c Up NOi GRApE 9E~4~ i ~REP LINF ~F fREES + ° FI~ kY _ ~ , 5GALE: ~ "~10~' • ~uaSfi ~ikE ~ . ~f~ORtiRr ~~riYE } LAN~SCAPE S'iR I IP ' i0P5~1 ~ StQC~P I~ E~Rf x ~ fPP{ I SCREEN ~X[SiIHG plHE ~ ----~--,~.w..--~-----a frrv.l 1~ ~~uAiN ~~rv,) vooqoirf c~ nFGEi~ wAw i H ~ i S E E ~ CQh~lf(1N HAYE I 51IE I Y~l1URE Hi.K SP. ~ ~ 6ER6ERIS THUN9~RG11 ~ITROPURPl1RfA ~ +~E4-LEAf BARBEPRr J 3a• Ni, ~ 5~x5° ~ " 1 ~ 0 Cl~AEN~YELES '6URAl SE~1' I iA~i FL~f~RI~E6 ~UIHC~ ~ 36' Hi, ~ fi'afi' ~ T ~ N ~ { C 13 CORNU5 SFBICEA R 4&~ ~ ~ J ~ I I ~ EU451ER ~OG~4~D ~ 3~' Hi, ~ T:Sfl t, ~t~ar ia~ GR~Y~k B4R~E~ ~1[SGOE FEHCE iBr ~ Q j D 19 C010HEASfER dCU11FaLIVS ~ PEKtHG COiU~E,15i~R ~ ~p' Hi, ~ 14'x1a' R,IILftOJ4a ilE B4ROE~-~,1~4UN~ BdiH 51~ES' OF L~ 1i5ME FENCE iBr IV1. . ~X~~~~~~ i ~ , o~ + E~ CO~ONE~SiER APICUiAT~S ~ CRAH6ERRY ~ipdEASTER ~ 1B~ SP. ~ a~:6' 3. 1' M~iER iR~, N1~+1TH & CE~IiRAI i ~ F ~ GlEOliSIA TRI,IC~iliH~5 'SNAQ~Il~SiER' H~ T UCU 1 IR ' ~Mr o~rE~ ~rs~~E a~ ~t~cE o~ a'zs' R~ST 1 9QTH 5f4ES' QF L+INi15CAPING. , ~ o i I I ~ ~ ~ 5 E~ 1 I~~ G~~. ~~a x1~ ~ S~B~T~iIaM , ~ G ~ 27~ J~HIFERUS S. 'B11fF~LU' BIfFf~4l0 JUI~IPfR I6' SP. 12'x9' , # J ~ i f! ~ 21 ~ JIIHIPERU~ 5~481Nti 5~Y11~ JUHfPER ~ 1' HI', ~ 3':8' ~ ~ i a l 8 JU~lIAEffU$ G~ 'i0RUL05A" HbLl1'i4(}p olI111PER ' ~ ~ HI, ~ 19'zf9 ~ H ~ ° ' J J 1 Y~~U5 Ifl~H515 'Pt~~+~' BECNT~4 RA ~ P l C 9 P LE ~ f I J7' ~A1. I 2S ~20 ~ i ~ N Ft1iI~A F N ~ ~ X ~ W~ll~1$ 'R~a1~4Ni~ ~F~ia~T CR~BaPR~E TREt ~ I 2' ~Al. 20'r2fl' ~~1~ ~ 4 E E c~ ~ I ~ I , ' , L} 0~ PI~IIA~ElPHI1S Y, ~~i~~, SHOfFIAKE~ } u~ac ~,~c~ ~a~ H~. I a~~a~ 1Q CRAYEI BOADER 6Q, ~ - ~ ~ 0'~ PICEA P~NGEhS GIAUCA ~ CO~OR~Q4 6~UE ~PRIICE 8' el, 7~'R~0' ~ ~ / ~ t~ G N dl Q PIt~S IIIIGO '~111G0' ~ ~UGa PfNE C i5' Sg. fi"~i' a I ~ _ H ~ C C~~ ~H 0~6 AiNU$ ~VIGRA ~ ~IUSiRIAH PINE ~ S' il~, ~ 5Q'M~$' . ~ •f' - I y P 4 PRIlHUS CIS1EtlA ~ Qf, PURPLE' IE~F PiUI~ C 99' 1~1. B'~6' ~~r'~ ~9 SYRIHCk YU GA$15 , ' , 1998 ~ I I ~ I cowua~ ~Ri~c I a~ ~r, ~~o ~ i0 3WS~ +~Ctf~S R4a0 ~E~TH AuE. D I R~y ~ R 9~ FHUJ~ OCCIQENiALIS 'FRSil6l~~1{' ~ ~ dR90RVI~AE ~ H~, I 29'~5' 4 1 ~ . e... ~~FEREKCE D~~~fNGS ` ~ ~ ~ a~rER M~~rE ~ A ~ ~ 1 ~ ~I ~ ~ ti ~ olSi. LINE FREIIYIHAR~ 4HE LIHE . . . . . . . . . . . . . ~ ~~AUNGS x 2~x~~ BaX ~RC~~u~H~R~, F~~~ ~ viClMi~r ~aP. , , . , . ~ , ~ --r 5EE HOif 3 PR[LIIIIHJ4R7 SECiipN, , , , , , , , , , , , , . . . . . . . . . . SHi. 01 ~ , B F d N R~ ~ LAyaSCAP~ PLAN fAP . . . . . . . . . . 5H1. O? ...........SHi.03 ~ 115 kY SU9S1~119N ~ ~ ~ scb~~: a~=~u~ . N~N~H & CE'~~RaL L ~P4KAH~, ~ C ~ G ~ K ~ Q ~ _ PREIIf~~~dARY l~Na~C~P~ w ~ 'uBSIAr IaN L L SPOKANE, 1YA. x ~ Pl~~l ~ VICIN1iY ~~P ~ Ly i heinerxcrc i 'ia1Y1 ~A WASHINGTOM WA~~R PO'~4 o ~ ~ N l p ~ . S?QRA~fE,kJ~SHIHQiqN CI NII Y MAP Q • NOTE6 ~ II-19-9& ~ ~R~~~ WATER P0WER IFASHIHO?QN sr~~r I oa~c ~ ~N~ER50H t ~ ~ ots~r~+ c~ES~QO~_ 11f 20, APPROYD ~ I~}-98~ i~PER ~CCES~ R~~,p i~ ~0' GJ on~+r~ G~ ~wrt~ o,iF ` # ~ i~,l~ Mp 9+~iE REYISIpII ~~T {~14 f"t~Lp Mo~EO`*'~ sMi ~ ff~ ~ . _ rR , - - ~ 4 11JF4{4~ O+IE l6bS~-3 ~ i ~ zo~ MoRTH ~eeESS Ao~o CONSTRUCT I ON NOTES ~ ~ ~ L - 40.0 / T ~ IElEFAONE BOX ; oisr. ~iHE EIGHiH AVE. ~ fD F ASPN~ ~ ` ~ ~ r TEI. ! C~S I C HiRACiUR TO CA TIll11f IOC+ITE SERVICE PRIOR 10 SiARI OF CONSiRUCiION. Gf~Q, Tj..~„ _i._. _ , 0 ll U ' ~ r 4 ~ ~ TAiION P~ . y 10PSOIl DO1H TO CIEAN SUBGR~OE. STQRE iHE VAiIYE 10PS011 l- ~ i , 2. SUBS D REAO E dPiNG ISTRUCTION. ~ ME ►uvr:_Tnvrnii ~ ~ I r. FREE OF RdOTS, 10pp1' ORCAMIC MA1iER d OEBRIS ON $IiE FQR USE FOR LANDSC i / i ~ R O U N O F E N C E. Y A X I I N I I O E P 1 H O F S T O C K P I I E ( 0 B E 3 F E E T A B O V E E X I S I I Y G G R O U N D. r~ !R LANOSCAPING ~ ~ - _ ~ i i ~ ~ ~~i o i i 3. Flll uArERUI YARIMUU oENSlir ~ QPTIUUY WOIStuRE CQN1ENi SHAII BE QE1ERdINEO STIYG GROUNO. ~ • 00•~ ~ 99.5' i~ ~ o~i ~ IN ACCORD~MCE IIiH ~STN 0-ISSI ~If901FIE0 PROCIOR~. _ 100.0-- - . . . _ , _ _ _ ~~T, _ , . . . - i ~ i i ~ ~ll SiRUC1URAl Flll SNALI BE COYP~CiED TO 901 Of 1HE NOOIfIED P80Ci0A MAIIINY BE DETERdINED i - ~ ~ y i i i = < ' ~ ~ ~ ~ ~ i gg,S ~ ~ m DENS1111, 'ROCiOR YAJ( I INY ' N ~ ~ ~ ' \ \ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ T i IP IM 6 FOfl LIFTS q0 ~ ~ ~ S. Flll ~REAS SNAII 8E PROOF C011PACiEO ~F E8 GRU881N6 b S 8 P G BE E i ~ BEFORE LIF15 ~ o ~ ~~I 161.0' _ _ 111,0' \ . I i ARE REPLACEO. W~ , ~ _ -S10R~GE BUIl01NG i ~ q ________.~00.0 6, ~Ll CQIIP~CTIQH SHAII BE OONE B1I YEGH~NIC~I IIEAMS. 1IF15 NO1 10 EXCEED 8 INCHES. o ~~IOO.S' , i ISEE NOTE 10) ~ ~ i ~ iEIEPHOHf BOX W~ , II5,0' ~ ~ ~ ~ ~ l, fOR ACCESS RO~OS, ~00 A 6' UYER OF GR~YEI I3 1' MINUS), C611PACiEO TO 90S OF iHl ~ ~ i ~ , ~ 115 W4 CNESIER UP OF NppIFIED PROCTOR IUXI~IUY DENSIIY, (SEE SEC110 BE101). El(CEED 8 INCHES. • ~ , ~ ~ / ~ BE~COH - iNIRO ! Nti1CH IIS kY IINE ;TED TO 90% OF 1HE i ' ' ' I ' ` ~ 8. NEI FEMCE PARAILEI d OFFSET 15' FROY ExIS11kC MINTH ~ GENTR~I SUBSiAiION FENCE i ~ 1 I ~ ~J ~ ti PROPOSED FENCE , ' ~ 1ElEPNONE 80X , . ~i ~ ~o i 9. BaSIS OF VER11C~1 CONiROI: ASSUYEO EIEYAiION Y~RBED OH TOP OF CURB IS 99,5'. iUBSTATION FENCE (N 0'51'18'E) ~ , (SEE KOTE 8) _ _ _ t00,S- ~ o r tn I W ~ 10, APPAOXIAAiE IOCAiION OF B~BCOCK'S SiORACE BUIIDING. CAAOING YUST N0T ENCROACH 01 ~ i ~ r . :URB IS 99.5'. i ~ r o BUIIDING EASEIIENi. iT NO1 EkCROACH ON W ~ ~ 1 V A TR IIIHIN GRA AR v 15~~ ~ i 1. REwO E ll EES OED E . ` ~ z 0 0 , ~ W 12, REMOYE EXISiIHG LIGHT POIE NEAN 50UiH OAIYE GA1E. ~ ~p~t E1.99.5 , ~ n ~ ~ , ' ~0 N _ 0.0~~,- i~ a ~IAN~$~APE AREA ~ ~ ~ 11P PRQ➢ERIY IINE W rl'E1101510ME G~S i• ~ ~ ~ a+l~ WARKER - . , ~ iEl. POIE ~ , 100,0 - , o ` ` - , o . PK NAII . ~ ~ N , NINTH AVE. , , , 99,5~------ • ~ . i ~ ` ~ . ` . ~ ~U ~ •~1•~ NIHTN AYE. (VACANi) , ' + ' . r-YEtL01S16NE 6hS 3 YO' IIOE GRAVEI aCCESS ROAD ~ ~ ~ •~~-f ~00 N0T GR~OE BE101 , 1 EL 99,5 r MARKER W ~ i X n.~ z INOiE 9) , DRIP IINE OF T8EE5 I ~ _ . + i ~ - . ~ . _ . . . m , o_ - ,.--~oo.S--- , ; ~ ; ;~•Y. •.~,;.•Y. ~ ~ , ,..100. iEllPOHlIRY NAiIVE ~ \ \ ~ \ ~ r,~ 3 ~ , , \ ~ , ,/i~ i, /i~`Y/~~i/ / " i ~ ~ i0PS011 S10CRPILE ~AEA ~ ~ 99,0~---- ~ ' ~ _ ~ , , ; ~E%ISTINC PINE : _ rt~ o__.--" Da•S.,_~~ , 10RENAIN~iYP.) N i ~ , , ~ ~CCESS ROaO SEC1 ~0~ SUBGR~OE PA 98A-----~ i • ' ~ SCAIE; NONE i0 901 OF 1 ~i IANOSCAPE ~REA , p ~ .~1flEPHONE BOX 6' CAAVEI (3/1' MINUS) PROCiQR OEN ii ___-1~g ~ Ca1tPAC1ED 1090I f 91.0• , ~ ~ ~ OF IHE ~OOIFIEO EX I Si I NG PROCiOR OENSITY , TEIEPHONE BOX 2 DIST, PoiE~ NINTH & CEN1RAl . ~ 96.0• ----~~i , SUBSTAT ION , ~1ElEPHQNE POIE L E G E N D , , ~SCALE IN FEET "~-SUBGRADE PROOF CQWACTED 9s.o..,----; ~ , i iR~HS. POIE ~ 2J~ ~ i _-•99.5'~~ _ ~..,..GAS YAAKEA TO 90t aF THE MOOIFIEO PROCiQR OENSIIY 91,0------~ , , J SO 2S 0 50 , 1 i 9o yp t , m ..,.,1ElEPNOME BOX ~ 9~.D• ~ , ~ ~ ~1ElEPHONE POIE O..,..E%ISIINC POIE t ~ ~ • • • ' ' - r ,.,.,PINE iREE • ~ ~ ~ 92,o------, ~ , ~ ~ n , ~ ..,..OECIOUOUS TAEE 91.Q----- i . ~ • 99.5 Pp, ` , =ND 90,0 ` ~ ' , . ~ ,.,,.EXISTIN6 FENCE ~ ------------------1~ FNO. I f1 IR~1 PIPE )4- 89.a ~ ~ TENTH AVE . S YAAKER 88.0------ ' ° ~0.0' ~ p0' SOUTH ACCESS ROAD ~ ~ g , TEN1H RVE. (DIRT) ~ _ ~ = T ..,..iUiURE FEHCE 87.0 - i -(SEE NOiE 111 i II a FQNftt1E BnY 86.0-----~ ~ ~ Q , ' ,n a ~ , ~ ~q p,y`~~ ~ , Q91~iER Y~IYE ...,.EXISTING CONTOUR ;IS11NG POLE NE 1AEE 85.0-----•~ i~4 ~b,:~i~~~ ` , - ----------99.5-------- p15T. IINE ' ~ i ~ ...,.CRADE~~CONTOUR = 4 tMOIlSL-i Rf E 81.0----- t~.lih~~l.~~~~t~~~`.~ `~,.~~~99.0 ~ ~k~~.~~~ut~~ ~ ~ _ . , - _ ~ ~~~~~~~tn„"`;~`_,~,~ .,...SUBSTAIOM PAO BOUNI BJ.o----- 3J11111111\\~;;~;~~ ASTING FENCE 91,0•-82 0- ~mi~~~~~~\~~;~~~ , , REfERENCE DRAWINGS 79.0•---- ~~i~>>~~~ . I1URE FENCE ~ `9 ~ ~ 10POGRAPHY 78.0----- . ~~i~Ai~~~`~:~;~'~, ]],0•---- . ~~i~~~~`~~:~;~'~:- PAEUMINARY PIAN ASTING C4NTOUR ' PAOPERT'1 AECORD. 16.0----- i~~~~~~~~::~` ~ ` l~ IAOED-CONTOUR 15.0----- . a i 4 ' f I .0 - _ 18STAIOt1 PAO BOUNOARY ..o~ ~ p151. POIE-~ ~B-~c , 60,0 . l9A - z = 115 kV SUBSTATION RAWINGS ~ J J ~`\~T . ~ , t~.8 NIN1H dc CEN1RAl - SPOKAN m " t~,o ..................1-34664 ..................E-35191, 5MT 2 GRRDING PIAN ~ _ = _ ~ _ e a ..................C-20667 WASHINGTON WATER PO' ~ W ~ a = SPOKANE,fASMINCION ^ 69,5 C ~ NO1E0 10-9-98 • APP ~ , ~ • _ sc~~[ I o+rc • ~ - u,oEasoN o, t DESid~ CHECKfD ~Q- SUBSTATION ~ W 1 ~It~3ap~ 1APER ACCESS ROAp 10 ~U' ~ Cl I~N' oa~M ~oTE^ ° AL - SPOKANE, WA, m w n ~q I DAIE I REY I S 10~ ~ B1 ~(XO d~tCK[o noTto ~ sMt 9T or_ W . . l ING PLAN AI WATCO Dr1WCD Avista Utilities 1411 East Mission P.O. Box 3727 ~ECE`VED Spokane, Washington 99220-3727 509-489-00 Toll F eene 800-727-9500 FE B 1 9 1999 ,iipi%1STA° Februar 18, 1999 SPOKANE COUNTY ENGINEE~ Utilities y Washington Water Power Division Gary Nyberg Plan Review Engineer Dept. of Building & Planning Spokane County Engineers 1026 West Broadway Avenue Spokane, WA 99260-0170 RE: Ninth & Central Substation - Phased Expansion 6102 East 8th Avenue Spokane County File B98216 Dear Gary: Enclosed are three copies of the Grading Plan, E-35491 sheet 97 revision 4, for your review and approval. This revision consists of: • Revision of the gravel cul-de-sac near the South Access Road. • Addition of the West Access Road. The revision of the gravel cul-de-sac was discussed with you by Bill McInerney, and will avoid a possible problem with a neighbor's garage located south of the cul-de-sac. Avista Utilities would also like to add a West Access Road. This access point is at gth and Dickey Streets, and is the current access point to the existing substation, and will facilitate future Power Transformer installation. This access point already has a paved apron, and an existing curb running south along Dickey Street. As discussed previously, Avista Utilities will have the missing type `A' curb on Dickey Street between 8th Avenue and 91~hAvenue installed by a County-approved contractor. If these revisions are acceptable, please stamp one copy and rEturn it to me. I will forward the approved drawing to Bill McInerney at the site. Should you have any questions, please call me at (509) 495-4190. Sincerely, a, L H. Andy Anderson, P.E. Senior Substation Design Engineer Enc. A division of Avista Corp. i , ~ • , . , ~ , • , ' - ` ~ . ry ' - . ~ ' • ~ . • ' ~ ~ ~ _ ~ ~ I ~ ~'rD'ect Tr~[xn,sr~x~a1 • Div•s~•on o~fBr~~~~d~• •ng Plan~t~ • ~ng ~ _ • . Friday, .Tune 11, 1999 . , '~~B ~ Site ~4pld►~ess: 6102 E 8T~i AVE ~*r~oject ~Vurr~ber: 99005 ~ . Parcef Number: 35243.0707 , . . ZonTng: UR-3.5 Fire D#s#ric#: FD 01 RECEIVED ` ~ . , ~ • ~ a - . . ~ ' . ~ JUN "1 5' Appl#can#; AVISTA CORPORATION (509) 482-4437 ~S P. W,'N E ~~W 9 W-~~ f - . ~ COnft3Cte ANDY A~~~~~~~/AVISYA CQR (509) 482-4437 ~ r~~ • , , ~ . , . . PO BOX 3727 ' SPOKANE WA 99220', . ~ . , ~ , . , , , f _ t ' r• f L Permit Use; UNNIANNED ELECTRICAL EQUIPJV1ENT BUILDING . ' ~ , • f , ' ' 4 F • n • L ~ . , . . Building Landuse ~ Enginwr U#ildiea Health Fire dist Assessor } - , , . ~ . - ~ ' ' . • ' V , Y = ' 3 . • ~ x ~ ' ~ • ' ' , ' ' ' _ ~~f ~ ~ ' 1 , ~ ? , ` ' L • • , • ~~ff7 ~L-ZD ! ~ ' ' r I I . i ~ . • ~ • ' ' ~1 ' ' 1 ' _ ' y . . ~ . 1 ' . ~ , , , - . . • " • 4 ~ , ~ ~ ~ ~ i y ~ . Comments: I ST SUBMITfAL CUordlnator JShaftO ~ ~ . . , Alo. . ~ ~ - pag$ , . , _ . _ ~ ' , ~ l• , ~ , . ` 1. . + . ' • . ~ ~ ' , ' ~ . project Number: -99005148 Inv: 1 Application Date: , 6111199 Page 1 of 2 , . - . _ . . . . , . . , . : . . . . ~ . . . ~ ~ . THIS IS NOT A PERMIT Penalties will be assessed for, commencing work without a permit ' • ' f ' . t • . . . . ! ~ , A •F f ~ . , • . . ~ Proiect Informahon: ~ ~ ~ ~ ~ ~ ~ ~ • ~ - . Permit Use:. UNMANNED ELECTRICAL EQUIPMENT Contact: ANDY ANDERSON/AVISTA C- BUILDING . ~ : . ~ . Address: . PO BOX 3727 . ~ • , , • - Z SPOKANE WA . 99220. ~ , . . Setbacks: Front Left: _ Right: . Rear: C S . . ~ . ~ ~ ~ . ~ ~ ~ ~ ~ ~ . ~ . ~ ~ • ~ ~ Phone: (509) 482-4437 : , , . . . . ~ Site Informalion: ~ . - ~ . . . ~ _ . , : . . ~ . • . ~ . - ~ . . ~ ~ ~ . : = _ . . . , ~ • Plat Key: 000344 Name: CENTRAL PARK ADD District: . F ' . Parcel Number: 35243.0707 ~ . ~ . • . - ~ . r . . • r ~ ' . ~ ~ . , - , ~ . , ~ . • • • . ~ • • , • • -.r ~ . SiteAddress: 6102 E 81H AVE Qwner: Name: AVLSTA CORPORATION SPOKANE, WA 99212 . ~ ~ • - ~Address: PO BOX 3727 • ~ I,ocation:: SPO 'r ~ . • ~ . ~ . ; . ~ ' _ SPOKANE, WA 99220 ' ' ~ 7~~,~- -r'~ • . ' - . ~ , , - - ~ . . . . . . '1• . ~ ~ . . ; • , ~ • . .tj1~~~~I • ~,••.r • . Zoning: UR 3.S ~ Urban Residential 3.5, . , ~ ~ • ~ , , . ; . ; . • , . : . ' , ' ' : . • . :a , Watcr District: 999 UNKNOWN Hold: ❑ ~ ' ' ; ~ . . ' ; . - - , • ~ ~ ~ • Area: " 0 Sq Ft. Widtti: 200 ' Depth: 280 ' Right Of Way (ft): '60 ~ ~ _ . . ~ . z . . , ~ _ • . Nbr of Bldgs: 1 a - - , Nbr of Dwellings: 0 . - ~ ~ • , • . _ . R•. . r ' . • - ; . Review Inf ormatron: - ~ . Department Review , . . , . • , . . . • : ~ ' . . . : . . . ".J ~ ' . BUII.DING, . ~ Plan Review. • ~ ~ - • - • : . . , - ~ . - . • ~ : . ~ . • . : , ; . . . . . . . 1. -i_ . , ~ _ : . • ' - . . ~ Comments: . ~ • . ~ ' , ' ' • ~ ~ ' . . , ' ' , ' ' . . i; i . , ~ : . t . ~ . BUILDING Landuse Review ~ . • ` , ' • • ' r e }i h . l , . , . ~ . , . ' . . ' t . ~ Comments: ~ , . - . . . . . . ~ . _ . . , . . . ENGINEER _ ~ Site Draiaage Review Comments: . , . . • . ~ . . ~ . ~ . , . , _ , . : ~ . ENGINEER ~ ~ . Approach Permit ' ' ~ ~ ~ ~ ~ ' ' ' ~ . . . . , , _ Comments: ~ ~ - ~ ~ . - . . • . • . ~ ~ • • ~ , . . , ~ . ~ , ' . . , . , . • , . . . . FIRE DISTRICT Fire District Review " Comments: ~ ~ . ~ . , . . ~ . . ~ Permits: . ~ . . . , . ~ . . . . - . . . . . . . . . , . q . . , . , 1 . ' • ' . . . ~ , ' - • • , 1 , ~ • . ~ . '