Loading...
8TH E 10107 APARTMENTS 42 ci y ~ z. ~ % _ ^ -q.--- ~ ~ Spokane Couiity ~ Department of Building & Safcty + V ~ L _ a_'. p fs°' • 71 JAMES L. MANSON, DIREC'TDR 4 'Z'O _ PaiP~ ChaSe, F.Lre Di5tr1Ct ND. I Dean Fowler, Utilities Department Gary Nelson, Engineer' s office Jahn Pedexsonr Planning Department Tam Postlewaitf Building and Safety Daryl wayl Hea1tYr District Y FROM; '~om Davis, Code Campliance Coardinata,r Department of Building and Safety- DATE: September 15, 1987 RE : Pre-Constructzon Conference - East 10107 Sth Avenue Apartments Enclosed is yaur copy af the above-referenced rninutes. Should you have any questions or need additianal information, please feel free t4 contact me. TLD:pjk CC: Ted Gunning, Northwaod Praperties . Rich Naccarato* Cedar Builders Mike Phi llips , Simpson Engineering John ~~irifill, Design A11iance Dennis Scott, Pu}alic Works Director 9 rvoRTx 811 JEFFERsarr ~ sPoKArrE, vvAsHIrrGrvN 99260•0050 TELEPHarrE (509) 456-3675 , . ~ , ~ - E° ' . . ~~~YFERIE~r CE ' EAST 101 ~ 4 61ri AV'ENUE - APARTMEN'rS SEPTEMBER 14, 1987 CALL TO ORDER: The meeting was called to order at approximately 10:00 a.m. by Building and Safety's Code Compliance Coordinator, Tom Davis, with the following in attendance: . PERMIT REVIEW PARTICIPAN'rS: Paul Chase, Fire District No. 1 Tom Davis, Building and Safety Dean Fowler, Utilities Department &rid S « 'Lc Gary Nelson, Engineer's Office John Pederson, Planning Department Tom Postlewait, Building and Safety Daryl Way, Health District APPLICANT: Rich Naccarato, Cedar Builders (Contact Person 489-4111) Mike Phillips, Simpson Engineering SCOPE/PROJECT DESCRIPTION: Proposed is the construction of five two-story 8-plex apartment complexes, currently part of a Planned Unit Development, in a cul-de-sac along 8th Avenue. There will be below-ground parking - one parking stall for each unit, additional parking will be available along the street. The owners would like to obtain the permit and begin construction as soon as possible in order to avoid the cold weather - possibly considering an early start permit. SUMMARY OF DEPARTMENTAL REQUIREMEN'rS : I. Building and Safety (456-3675) A. Discussion/Requirements 1. Plan review has been•completed and items needing correction have been discussed with the architect. B. Permit Release Requirements 1. Plan revisions or an addendum with corrections need to be submitted prior to release of the permit. - 1 - 2. Compliance with requirements of Fire District No. , 1 shall be met prior to release of the permit. (See Item II below) II. Fire District No. 1(928-1700) A. Discussion/Requirements I. l. Along this area of 8th Avenue there have been some water problems. Areas to the east of 8th Avenue have, however, a good fire flow. 2. The water supplier for the area needs to be identif ied and f ire f low verif ied . , 3. Two fire hydrants need to be installed and shall be capable of providing 1,500 g.p.m. One hydrant is to be located at 8th Street and the other on the site. 4. Fire truck access does meet all requirements, but is still somewhat limited. After discussion with the applicant at the meeting, it was determined that, if necessary, the trucks could use the 208 area which is directly adjacent to the driveway - there is no curbing and elevations are minimal, currently being at a radio of 4:1. The applicant had previously discussed this matter with Clyde Wisenor who indicated truck access with the driveway and using the 208 area, if necessary, would be adequate. III. Engineering (456-3600) A. Discussion/Requirements l. A copy of comments were given to the applicant and Building and Safety by Gary Nelson. 2. The road plans have been submitted and the bond . issued. 3. The Engineer's Office would be able to issue a release for an early start (footings/foundations only) if the drainage plan shows adequate elevations for drainage. _ .2 _ , B. Permit Release Requirements 1. Conditions of the preliminary plat need to be met prior to release of the permit. IV. Health District (456-3600) . A. Discussion/Requirements l. There was discussion between the applicant and Daryl Way as to what type of sewage disposal there would be. The applicant indicated they are anticipating putting in public sewer and are going to put it in th;emselves ann get reimbursed as part of a ULID being formed. He is talking with Jim Legat, Utilities, regarding the options. 2. Types of refuse were also discussed. The applicant stated the large trash containers will be available at each building and will contact a disposal company for regular service. B. Permit Release Requirements l. The Health District is ready to release the permit. V. Planning Department (456-2205) A. Discussion/Requirements 1. Setbacks along the front yard and all perimeters in accordance with the Planned Unit Development requirements shall be 30 feet from the property line. 2. Should the applicant decide to abandon plans for a Planned Unit Development and only follow requirements for the Multi Family Suburban Zone, the setbacks will be as follows: a. Front Yard - 30' from property line. b. Side Yard - 20' from property line, with an - additional 5' for each story of building over one story. c. Rear Yard - 25' from property line. A variance for construction may be possible, however is somewhat time-consuming. No "phasing" would be allowed. - 3 - . ~ 3. A three foot fence shall be installed at the front , yard of the property. B. Permit Release Requirements l. Conditions of the preliminary plat must be met prior to release of the permit. . 2. A revised site plan must be submitted indicating required setbacks. VI. Utilities (456-3604) A. Permit Release Requirements . A sewer plan needs to be submitted, along with a 1bond and Developer Connection Agreement. REQUIRED ACTIONS (County): 1. John Pederson, Planning Department, to talk with Doug Adams and will get back with the contact person with regards to the owner signing a Hold Harmless Agreement in order for construction to begin privr to finalization of the plat. ADJO . There being no further business, Tom Davis thanked the applicant and the departments for their participation and reminded all that he should be contacted if there any unforeseen problems which may arise. Also, should there be any changes from what appears in the minutes, we should be notified within one day of your receipt of these minutes. Revised plans as required by any or all of the above-listed departments shall be submitted in sets of 7 to Building and Safety who will then distribute accordingly to each department. The meeting was adjourned at approximately 10:30 a.m. Copies of Minutes to: All Participants File - East 10107 8th Avenue, Apartments 4 . . ' SPOKANE COUNTY ENGINEERING DEPARTMENT Project;_APARTFIENT - COMPLEX Date 9-11-87 Rddress: E 10107 8TH AVE Parcel No: 20541-2302 kef No. 87477 The County Engineering Department is in the process of reviewing the above referenced proposal. The drainage plan for the preiiminary plaE of Esther's Replat PE-I390 will be reviewed as the plat finalization pracess praceeds. This will be considered as the drainage plan for the building permit application. The applicant will be required to comply with the "condition5 of Approval" of the preliminary plat. Your contact person at the County Engineering Department may be contacted by calling 456-3600. Your contact person is GARY AiELSON. ~ . . , Spokaiic County Deparrment of Build ing & Safery y. ~t ,1.~r -~x~: JAMES L. MANSON, DIRECTOR RECEIVED ~EP 5 1987 OF Z`RArISMITTAL Cowty Engineering TO . ~ County Engineers Environmental Health County Planning Department County Utilities FROM: Department of Building and Safety DATE: 9/9/87 The attached permit application/plan has been submitted to our of f ices . Project # 87002932 Parcel # 20541-2302 Address EAST 10107 8TH AVENUE A pre-construction conference regarding this project has been scheduled for SEPT. 14, 1987 at 10:00 a.m. in the Building and Safety conference room. cc: Dennis Scott, P.E. NORTH 811 JEFFERSON • SPOKANE, WASHINGTON 99260,00050 • TELEPHONE (509) 456-3675 . CP" ' JAha-22- ° 88 10 : 34 I D: BLDG ANU SAFETY-SPO ` TCL t~l : 509-456-4703 #530 P01 T_. SPOKANE GaUNT'Y a SPO 1 tarlify thAi 1 have examined this Qsrmit and skate Ihat the informe id permit is true ertd correct. In aiidiW, I have read end understand the INSPECTION REQUIREME iame. All provislons of Iaws and OedirlarlCes QOveming thia type of work will be oomplied with whethe and any s0sequ9nt inspectien approvAts or CerhfiCatea of Qccupancy aha11 not be conatrued 1o qiu regolatlrtg CflnatruCtbn, or aa e warcanty ef Cantormance with the prpvWOne of 8►ry etdte or lOCBl laN SIGNATURE OF ~r Mv~ qwNER pR AGENT ~ D ~ F'RQJEcT NUMFiER= 87402932 DATE= 09/09/87 PAL;F."= 04 ~x~~E~~~~c~~c~~c•~~~t~c~~~~c~~c~~~~c~~~c~~~~c~c~c~c~~~ ~1f~~F~~E~]:C:A1'rCl~! +c~c~~~c~~~~c~~~~~~ca~~a~~~c~c~a~~x~~~c~~x~aca~~c~~c~ SITE STkEE'r= 10107 E 8TM AVE PAk("#EL_.1!T1 20541 -2302 ADI)RESS= .S`POKANE WA 99206 PERMIT USE= APARTMENTS ~'1. ~~"w=:: UQwi> 12 F''l..AT NAME.., 'S'THf::R' SAUD Bl..qCK= i l.OT= 2 ZON~;- M1= D i ~'`I"~; ~ ~REA-, 00000000 f`iA.:: F WTDTH= 327 nF PTH - 3' 3 0 Riw JWL (aF ~~l_DGS= 5 0 nWELL.INGSmI 40 ~ C1WNEft= HC}FrTHWdOD Pkt~~'Efil'IES --j" PHUNE'= 509 924 7950. STRFET= 9616 E MANTGOMERY DR ADriRESS= SPCIKANE WA 99206 ~ GONTACT NAME::.-:. ,.1ClMN SKINFIt.t„ -►•V51t6Np►i.c,I-ATvc.u F'Wf.lNE NI.JMPFR= 509-928°-7096 DUILDING SETBACK.1` : I`RClNT= I._M FT-~~ R I G H'r'.:: R kAR.1 I~~I;::VIEW ~NFCIRMATICIN I)ATE DEF'AFcTMFNT NAME REVIEW CC3MMENTS TN/OUT INT'~~AL5 BuILDxNG SAFETY PI_at~ REvIEw REQuzREn 870909 JE_'I.- ~ ~ ~t'7 ~P._ .,r ..N ,~ti _ CfIUNTY rLNGT NEE:Fi DF<F1 INf~~ PI..AN FtEQ' D W/ A.S'A 870909 Jf"F, ~ . ' 77_ a . . . .r ~ ~ e. m. ~ ~ y~ rhlVIRCJNME-NTAL. FiFWAL.TH NEW OF. ADDITIONAL WASTE WATEh 870909 JElZ . ~ W. ~ Xz (;;p1.1NTY PLANNINC; L.AND L1,S'E AC:TI(IN RE:.Q' Y>/INVOI._VEI) 870909 JEF" ~ : .n. . ~ ....V . ~ ra~NTY uTxI ..,XTIES WIN F'RT(aRTTY sEWER r~~~A 070909 E," _ r.. : . ~ ~ . ~ ~ ~ ~~r .V ~ ~ . ~ . . f F]. Rf: I) 7: S TRIC: T F' T Ft E FL W Ir'O P , REV )I:EW 1. I) 8 r 09() 9 JEf ' .ftm .,,#4!l2A1~1'„'C --n.., w~ -010b _~A447 .11. 90 ~ M ~ ~ ' JAN-22-' SS 10: 35 I D: BLDG AhJD SAFETY'-SPO TEL NO : 50'9-456-4703 ##530 P02 ' , ~ ' SPOKANE CQUNTY bEPARTMENT OF BUILDINQ AND SAFETY NORTH 811 JEFFERSQN SPOKANE, WASHINGTON 99260 (509) 456-3875 ~ i cartify thal I havo exsmined thls perirut ar7ci state Ehac thQ Information conlairxed in ic and evbmltted by me or my agOnt ta compile said permlt Is true and correct. In &&k(Oo, 1 have read and urbderstand ttte 1N5PECTION REQUIREMENTS/NOTICE provialon9 Included herein and agree to compiy with eame Aq praWsians of Iawa end Or(iiriAnces govem(ng thl3 rype of work will be complfed with wt►etftdr Specitiad herein or not. I understand tt7at thw isauance ot thie permlt and Any subsepubnt inspeatian aWr6vals or GertifiCBteg of OCCupanCy ahall not be COnEtrued t0 givd authorrty tn viplatg or CanCel th9 prbwsions o1 any stste pr IpGal lava requlating oC+rlStruction, or as a werranry of canfo(mance with the provieiona of arn+ state or loc.al laws reeulatfng construction, SIGNAYURE OF APPLICA7IQN OWNER OR AGENT , OATE PRQJECT NUM~E*k= e7002932 DATE-m; 4Y/09/07 P AG Eit.; h? RllIl.DlNG F'E'F'tMIT ~~cac~~~x~~~c~~~c~•~x*x~~c~~x~~~~~~ CONTRACTORT 1'''M~NE:= STREE"TV ADDRES'San N~:wT► x R~~MC:~~~~.L.W ~rnvrTxuN= C;F~Ar~GE: us~~:~ DWELL uN I TS40 B PwX occu~~, LD= 030Q B~.DC~ a~GT=~ ~9' ~STL7R TE,'.;.. ~ Bl... 1)1.y W It J/ 3000wlQ i"h 1• L¢ n `s {1► REc~ ~~ARK :C NG= OWANDrr.,Aw= PKp sEwEh = HYDRANrw 0) 9 PW PSR lrv'7' ~t ~t ~t~t ~ x ~ ~ ~t ~ ~ ~ ~t ~c ~ ~t ~ ~ ~ * ~ ~c~c~t ~ ~t ~c~t ~t ~c ~ ~ ~t ~ x ~c~ ~c ~c~ ~c ~c ~ ~t ~ a~ ~ ~ ~ ~c x ~~c ac ~ ~ ~ ~ ~c ~c~t ~c ~c ~c~ ~c ~~r ~ ~ ~ # ~ SITF NOTE: T(JP]:C GENEkAL DEPT 8UIL.nING & S"Af"f::'!`Y ~ ~ ~ ~c ~c~~ ~ ~c ~ ~c ~ ~c~ ~c~ ~c ~ ~ ~ ~c a~c~ ~c ~c a~ ~c ~c ~ ~ ~c ~t ~ ~c ~c ~t~c• ~c ~ ~ ~ ~ ~ ~ ~ ~ ~t ~t ~c ~ ~ ~t x x ~ x ~r ~r ~ ~ ~ ~c ~c ~ ~ ~c ~c ~ ~ ~ ~c ~ TraIs sITE HAs~ BE.EN REvIEwEn uNr~~R A F~uD l~~ZOC:ESSEA BY - FORkY, JEF'F" 'rNANK YOU C> c5 a C~ a tt. ~ v~