Loading...
GUTHRIE E 13411 4 PLEX APARTMENTS I I P S v O K A N E - C O U N T' Y' OFFICE OF THE COUNTY ENGINEER • A DIVLSION OF THE PUBLIC WORKS DEPARTMENT Ronald C. Hormann, P.E., County Engineer Dennis M. Scott, P.E., Director November 2, 1994 Carl Moore 4 Plex Don Neraas 838-2981 A review of the road, drainage, or site plan for the above-referenced building permit has been accomplished. Areas of concern to the Spokane County Engineering Department are indicated in red on the attached plan set and calculations marked "ORIGINAL°. Please make the corrections and re submit them to the Building Departrnent in order that the review process may proceed. Highlight all changes to the resubmitted plans and include the comment mark- up copy with them. Please note that the plan set and calculations marked "ORIGINAL" are official public documents and must be returned with the revised plans and calculations. Review of the revised plans will not proceed until the 'ORIGINAL' set is returned to the County. If you have any questions about this review, please contact us at 456-3600. Thank you. . Sircere . ~ v Paul Len iemann E.I.T. Plans Review Engineer Ron Horman P.E. County Engineer I . ` L ~ 1 f ' : ~ A7 r i114 enn 1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 456-3600 FAX: (509) 324-3478 TDD: (509) 324-3166 ~ --s ~ REVIEW COMMENTS SPOKANE COUNTY ENGINEER DEVELOPMENT ENGINEERING SERVICES PROJECT B94179 REVIEWER: Paul Lennemann PROJECT NAME: 4 Plex Apartments DATE: 2 Nov 94 ADDRESS: 13411 E. Guthrie REVIEW 1 CONII4ENTS Approach Permits are required on all new approaches as well as all approaches that will be altered. Contact Sylvia Lightfoot at the County Engineer's Department. Approach permits for county roads will not be issued until a site plan is approved. Provide contours or sufficient spot elevations to check site .grades. One-percent is the minimum requirement without special construction requirements by a licensed engineer. , Coordinate the landscape plan with the site plan. Provide widths of all curb openings. ' List size of downspout pipes to swale. Enlarge swale "c" 2 feet, as shown on plans. r Correct the swale cross section to be min. slope of 3:1. Submit a bond in the amount of $2,600.00. 1 ! . , S P O K A N E O U N' T Y OFFlCE OF THE COUNTY ENGL'VEER • A DIVISION OF THE PUBLIC WORKS DEPARTMF.iVT Ronald C. Hormann, P.E., County Engineer Dennis M. Scott, P.E., Director November 2, 1994 Carl Moore 4 Plex Don Neraas 838-2981 A review of the road, drainage, or site plan for the above-referenced building permit has been accomplished. Areas of concern to the Spokane County Engineering Department are indicated in red on the attached plan set and calculations marked "ORIGINAL". Please make the corrections and re submit them to the Building Department in order that the review process may proceed. Highlight all changes to the resubmitted plans and include the comment mark- up copy with them. Please note that the plan set and calculations marked "ORIGINAL" are official public documents and must be returned with the revised plans and calculations. Review of the revised plans will not proceed until the 'ORIGiNAL' set is retumed to the County. If you have any questions about this review, please contact us at 456-3600. Thank you. i Sircere / Paul Lenlemann E.I.T. . Plans Review Engineer Ron Horman P.E. County Engineer 1026 W. Broadway Ave. • Spokane, VNA 99260-0170 •(509) 456-3600 Ff1X: (509) 324-3478 TDD: (509) 324-3166 REVIEW COMMENTS SPOKANE COUNTY ENGINEER DEVELOPMENT ENGINEERING SERVICES PROJECT B94179 REVIEWER: Paul Lennemann PRQJECT NAME: 4 Plex Apartments DATE: 2 Nov 94 ADDRESS: 13411 E. Guthrie REVIEW 1 CONN=S Approach Permits are required on all new approaches as well as all approaches that will be altered. Contact Sylvia Lightfoot at the County Engineer's Department. Approach permits for county roads will not be issued until a site plan is approved. Provide contours or sufficient spot elevations to check site grades. One-percent is the minimum requirement without special construction requirements by a licensed engineer. Coordinate the landscape plan with the site plan. Provide widths of all curb openings. .u~ ~ List size of downspout pipes to swale. ~C WKAP ~ Enlarge swale "c" 2 feet, as shown on plans.~ " ~ - Q Correct the swale cross section to be min. slope of 3:1. Submit a bond in the amount of $2,600.00. 1 BUILDING PERMIT CHECKLIST J PRE-APP' IPERMIT : 'ADDRESS b 9 `111 I 13 y/I ,E 4 ykr;c- IMEETING ~~e?'r ~ i IIREQUIREDJ( COMPLETED ~ - MANAGEMENT AGREEMENT TO PAY FEES ~ X RIGHT OF WAY DEPARTMENT I DEED ~ EASEMENTS ~ R/VV R I D ~ LEGAL DESCRIPTION CHECK LETTER FROM SCAPCA ~ T ~ _ RECIPROCAL USE AGREEMENT r` APPROACH PERMIT X . . . . . . . : . NORTH ARROW X ` SCALE X ~ BENCMMARK X ROAD NAMES X R/VV DIMENSIONS - - X ~ PROPERTY LINES X SET-ASIDE shown on plans GRADES (min 1.0%) X STAMP X PAVING (surface description) X TRAFFIC CIRCULATION PLAN X LANDSCAPE PLAN (208 CONFUCT) ~ X b ^ Drywell detail (type A or type B) X ~L Metal Frame and Grate (type IV) a Splash Block detail for pipe/gutter outlets J O Curb inlet detail DRAINAGE Roof construction X ✓ HVAC on Roof X Swale volume calculations X ~ Swale Cross Section X ~ Pre Developed Condition X Post Developed Condition X ~ SPECIAL SOIL TESTS DITCH CALUI..ATIONS Pipe/BACKWATER CALCULATIONS GRATE CALCULATIONS RETENTION/DETENTION CALCS 10150/ 1100 YEAR S1"ORM ~ TR-55 ANALYSIS Inlet/Curb cut calculations ~ Bottom of Swale elevation lop of Drywell elevation _ ! ~ ~ ~ - - ROADS ~ - ~ . - . . ~ . . . . . : - , ~ North Arrow Benchmark Scale Gutter Grades (>0.8%) Cross Slope (2.0%-4.5%) Drainage Report Drainage on Plans rJ Curve Data (radius, hc, vc) Pavement section Tapers/fog siripe Engineers Stamp ~ Quantities/Bond eslimate Bond 2 3 0 Mylar Owners Signature County Stamp ~ ~