Loading...
2018-11-07 Signed 8th Ave E 4418 BFE Letter.docx.pdfII • II ' II ' II ' ' ' I Page2 Flood Plain Computations: This analysis utilized the most current version of the HEC- RAS computer program, version 3.0.1, developed by the U.S. Army Corps of Engineers Hydrologic Engineering Center, dated March 2001. DRAINAGE COURSE DESCRIPTION: The subject drainage course, as stated above, approaches the study area from the southeast, through a broad swale running behind Alcott School. As the drainage course enters the study area, the channel section is poorly defined in places, with rock obstructions, and splits in the channel. Approximately 500' east of Havana, the drainage course runs parallel to 81h Avenue as a roadside ditch. From this point on west to Havana, the channel section is more regular, having a bottom width ofapproximately4', a depth of approximately 5' and with 1:1 to 1: 1.5 side slopes. 300' east of Havana, the drainage course flows through a 48" concrete driveway culvert at the entrance to the Spokane Rock Products quarry site. Presently, this culvert is approximately Yi blocked with silt. In addition, the channel course for approximately 75' upstream from the culvert is silted in, having a reverse slope iri places. At the southeast comer of the intersection of 81h A venue and Havana, the drainage course enters a 42" box culvert, and enters the City of Spokane drainage system. This culvert extends west for 40', where a 36" storm drain joins it from the northeast, then continues west in a 54" storm pipe. The entrance to the 42" box culvert has a bar grate mitered to match the 2:1 slope of the end of the channel. The entrance is in good condition with no obstructions. ATTACHMENTS: 1. U.S.G.S. Map 2. FEMAMap 3. Copy of excerpt from Glenrose/Central Park Watershed Master Plan 4. Sub-Basin G91 runoff computations 5. HEC-RAS Flood Plain Report 6. Map of 100 Year Flood Plain Boundary Adams & Clark, Inc. I I I I I I I I I I I I I I I _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ A t t a c h m e n t B A t t a c h e m e n t B - 1 A t t a c h m e n t B - 2 A t t a c h m e n t B - 3 Attachment C At t a c h m e n t D 8th 7th H a v a n a D e a r b o r n Hartson Cu b a 19441936 1938194219461948 1934 19501952 1940 1932 1954 1956 1958 19601962 19641966 1968 197019721974 1976 1978 1 980 1982 1984 1986 198819901992 1994 1996 1998 2000 2002 2004 200 6 2008201020122014201620182020202220242026202820322034 19301928 1948 19 7 0 1 9 6 0 1962 19 7 6 196 0 2020 1 9 42 1934 19 9 2 1932 19 5 0 1974 1958 19 9 8 1958 1 9 6 2 1 9 3 2 19 5 2 1 9 6 6 197 8 1 9 6 4 1932 1 9 54 2 0 0 2 1944 1940 1 9 7 2 1 9 62 1934 1 9 6 8 1 9 3 4 1 9 7 0 1930 1 9 54 1 9 50 1 9 6 6 1942 19 3 6 1 9 5 4 1 9 7 2 1 9 86 1 9 3 2 1 9 7 6 1944 19 4 6 1 9 5 0 1952 1 9 4 8 1940 1 9 3 8 1 9 5 4 19 5 6 1936 1934 1 9 5 0 1 9 6 2 1 9 5 6 ³Attachment E Spokane Valley - 2-foot Contours at 8th and Havana