Loading...
2014, 11-07 PRE-COMM-2014-0072Spool ane 4000%alley° STAFF USE ONLY Date Submitted: 'C1Mc0It/ -00n- Project # RECEIVED NOV 0 / 2014 Community Deve .pment Department Permit Center 117+3 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-5240 Fax: (509) 688-0037 perm itcenter a spokanevalley.org CSV PERMIT CENTER Received bx: ti Fee:— JB REV. PELTS : Complies with Zoning District 0 YES 0 NO Staff Initials: File #: PRE -APPLICATION CONFERENCE FORM Il COMMERCIAL (Complete Sections 1-4) Q LAND USE (Complete Sections 1, 3 and 4) SITE ADDRESS: 3520 N. Tschirley, Spokane Valley, WA 99216 PARCEL NUMBER(S): 55065.1301 PROJECT LOT SIZE(s) (ACREAGE OR SQ FT): 24 acres MOL EXISTING USE OF SITE: Vacant n , n `.. . f ` l ��%tae�fuE,�f11Fnt Ellis eeilii PROPOSED USE OF SITE: Salvage Auto Auction and Outdoor Storage ) EXISTING NUMBER OF LOTS:1 j V 2 2014 PROPOSED NUMBER OF LOTS: 1 EXISTING: ❑ Sewer ❑ Septic PROPOSED: ® Sewer Septic SECTION 1: Prooject fvt arrre� PROPERTY OWNER: El CHECK BOX IF PRIMARY CONTACT NAME: Insurance Auto Auctions, Inc. (prospective purchaser/lessee, NOT owner) ADDRESS: Two Westbrook Corporate Center, Suite 500, Westchester, Illinois, 60154 PHONE: 708-492-7302 FAX: 708-492-7575 EMAIL: rhoopis@IAAI.com OWNER'S REPRESENTATIVE:❑ Contractor ❑ Architect ❑ Engineer ® Other Counsel CHECK BOX IF PRIMARY CONTACT NAME: Elizabeth Tellessen COMPANY: Winston & Cashatt, Lawyers ADDRESS: 601 W. Riverside Ave., Suite 1900, Spokane, WA 99201 PHONE:509-838-6131 FAX:509-838-1416 EMAIL: I CERTIFY THAT THE ABOVE INFORMATION FURNISHED BY ME IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. la:thb6CU 15 Owne 'Applicant Signature 4 Dale PL -35 V-1 Page 1 of 7 SECTION 2: FOR COMMERCIAL BUILDING ONLY: Occupancy Group: NA DB DE OF OH DI DM DR EIS DU Construction Type: Type V Type IV Type III Type II Type I DADB DADB DADB EJAZB DADB Square Footage:14,000 approx. Number of Stories:1 Automatic Fire Suppression System: YES DNO Building Waste Disposal: EYES ONO Fire Alarm System: EYES ONO Proposed Food Service Facility: []YES ENO SECTION 3: Proposed name of project, if any; Insurance Auto Auction --Spokane PROPOSAL: Provide a detailed description of the proposed project including, but not limited to, the changes to the site, landscaping, number of lots and uses proposed. Insurance Auto Auctions, Inc. (IAA) works in partnership with a variety of sellers, including insurance companies, dealerships, rental car companies, and fleet lease companies to facilitate the efficient sale of salvage and other end of life vehicles. Vehicles are sold quickly and efficiently, using our dual auction model combining both live and live online (internet) sales. IAA has positively expanded its business, adding over a hundred facilities over the last 10 years. Currently IAA employs over 2,100 people and has over 160 facilities in the United States and Canada (Impact Auto Auctions). IAA's auto auction business involves receiving and selling vehicles that have been damaged in accidents, are at the end of their life, donated to charities, or are retired from fleet usage. The vehicles are not dismantled, no parts are removed from the vehicles, and the vehicles are sold in the same condition as when they arrive. The vehicles are stored in inventory while a salvage title is processed with the state DMV and are then sold at auction. The entire process from intake to sale is typically 60-90 days. IAA intends to construct a commercial building, approximatly 14,000 sq ft, on site in accordance with the applicable height and setback requirements to be used as an office and possibly indoor auction space (see below). SPECIFIC ISSUES/QUESTIONS YOU HAVE ABOUT YOUR PROJECT: (Examples: Landscaping, Paving, Parking, Setbacks, Stormwater, Frontage Improvements, Traffic, Fire Sprinklers, and/or Accessible Requirements) IAA intends to install a hard surface of asphalt millings on the entire site (excluding building footprint). This differs from what IAA understands the city requires in order to comply with SVMC 19.70.020(B)(4), requiring outdoor parking and storage areas to be "paved". However, as set forth in the attached description from IAAI engineer, Steven Tibble, the asphalt milling surface is a hard and impervious surface that has proven to stand up to IAA's use in other locations. Asphalt millings are the prefered type of hard surface for this project as it decreases the expense of both construction and maintenance of the site. (See Attached description) IAA also would plan to construct some indoor seating (<100) for live auctions, and seeks clarification on whether this would be permitted in the I2 zone, as it is permitted in the I1 zone and SVMC provides all I1 uses are allowed in the I2 zone. SVMC 19.70.020(B)(1). PL -35 V -I Page 2 of 7 Please list below the names of City staff you have been in contact with in relation to the project: Staff Person Name Department Christina Janssen Planning SECTION 4: THE APPLICATION WILL NOT BE ACCEPTED IF THE REQUIRED MATERIALS ARE NOT PROVIDED $250.00 Application Fee: This fee will be deducted from the formal application fee (proposed in pre -application request), if filed within one (1) year of the pre -application meeting date. ® Commercial Review Only: I . Nine (9) copies of a Site Plan (See separate sheet for commercial site plan requirements) 2. Nine (9) copies of a Floor Plan; and 3. Additional Information, if any. Cn Spokane ,,,,,•'Valley° OR 0 Land Use Only: Two (2) copies of a Site Plan, to include: 1. North Arrow and Scaled drawing (Le. engineers scale) 2. All abutting streets identified 3. Property configuration - Existing & Proposed 4. All existing structures, identified and dimensioned Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-5240 Fax: (509) 688-0037 PRE -APPLICATION CONFERENCE INFORMATION AND CHECKLIST GUIDE Pre -Application Conferences are offered for the following: • Commercial and Industrial Buildings & • Conditional Use Permit Structures — New, Remodels or Additions • Variance • Changes of Use or Occupancy • Rezones • All Multi -family (tri-plex and above) • Planned Residential Developments • Short Plat (dividing land into 9 or fewer lots) • Zero Lot Lines • Subdivision (dividing land into 10 or more lots) • Text/Comprehensive Plan Amendment • Binding Site Plan (division of commercial and industrial zoned land) What is the purpose of a Pre -Application Conference? The purpose of the pre -application conference is to assist applicants in preparing their development applications for submittal to the City, to identify potential problems, and to streamline the development review process. These pre- application conferences are informal and provide an opportunity to meet with the City departments responsible for development review. City representatives will review the submitted materials, provide comments, and may identify issues or concerns wherever noted. Who Should Attend the Pre -Application Conference? The applicant, contact person, consulting design professionals and the property owner should attend the pre - application conference. City staff in attendance may include representatives from Building, Planning, Engineering, the Fire District, an appropriate water district and other outside agencies. PL -35 V-1 Page 3 of 7 Application Procedures: To schedule a pre -application conference, submit the required items to the City's Building Permit Center, open Monday through Friday, 8:00 a.m. to 5:00 p.m. Once all pre -application items have been received and deemed complete a date and One for the conference will be assigned. Commercial/Building Pre -Application meetings are typically scheduled on Tuesdays and Land Use Pre -Application meetings on Wednesdays, two weeks from the date of submittal. City and agency staff members will review the request and prepare written continents. Please note that pre - application meeting comments are preliminary and reflect the proposal submitted and the regulations in effect at the time of review. They are not meant to be detailed final comments or requirements. Information received through the pre -application process will help you design, prepare and submit the formal building permit application. Also please note that all pre -application materials are public record (RCW 42.56). PL -35 V-1 Page 4 of 7 The following Lists are guides for preparing documents for a pre -application submittal: Site Plan: Site plans for a pre -application conference may be preliminary in nature, but should include enough detail to accurately depict the full scope of the project. Site plans should be no smaller than 8 'A" x 11" and no larger than 30"x 42 Plans must be to scale (i.e., 1" = 30', 40' or 50', etc.) or fully dimensional. Fr Show all rooms. Specify the use and size of all rooms (classify use per IBC Sec. 302) Applicant's name, address and phone number ■ ■ Property owner (s) name and address n If the proposed project is in an existing building with a tenant improvement or a change of occupancy, then all of the above, plus a complete existing floor plan should be included for comparison Vicinity map ❑ Zoning ❑ Water District ❑ North arrow and date •/ Dimensions of existing and proposed (if applicable) parcel boundaries and dimensions ■ Location(s), size(s) (in square feet) and use(s) of existing and proposed building(s) and structures I Location of existing & proposed drainage facilities (including swales & diywells) and utilities El Location of existing and proposed driveways and turning radiuses, parking areas, outside storage areas, road easements and right-of-way on the site and on adjacent properties (including across the street) ® Note paving (existing and proposed) of all parking and travel areas ® Square footage of impervious surfaces (existing and proposed, excluding building footprint) ❑ Adjacent streets ■ Proposed phasing (if applicable) ❑ All sensitive areas on or adjacent to the site such as any watercourse (stream, drainage, etc.), unstable/steep slopes, areas of slope 30% or greater, and flood plains or wetlands ❑ Location of all fire hydrants within close proximity to the property ❑ Location of all utility poles, streetlights, etc., both on-site and in the adjacent public right-of-way Floor Plan: Proposed interior building floor plan shall include a complete scaled or dimensional floor plan i of the fol lowing (list includes items for restaurants/kitchens): ■ Show all rooms. Specify the use and size of all rooms (classify use per IBC Sec. 302) 0 Wall legend must delineate new, existing, demolished and relocated construction ■ Show location, size and door swing for all required exits ❑ If the proposed project is in an existing building with a tenant improvement or a change of occupancy, then all of the above, plus a complete existing floor plan should be included for comparison Additional Information: A more complete review of the proposed floor plan is available by submitting the following information (if applicable) in addition to the required information listed above: ■ Fire barrier(s) type and location ❑ All accessibility features n Grease interceptor size and location 0 Kitchen equipment (Type 1 hoods, dishwashers, flyers, grills, etc.) Questions.... The City has provided answers to some of the commonly asked questions to assist you in preparing for the Pre - Application meeting request. Feel free to contact us at the Permit Center (509) 720-5240 or permitcenter@spokanevalley.org, for additional questions. BUILDING: 1. How big can my building be? The State adoption of the International Building Code (IBC) specifies the maximum size of a building based on its type of occupancy and construction type. The height, area, and fire- resistant construction requirements for any building all come from the how the building will be used and the type of material the building is constructed from as well as how much space can be left open around it. The specifics related to this question PL 35 V-1 Page 5of7 can be found in IBC Section 302, Table 503, except as modified in Sections 504, 506 and 507, and Section 602. 2. When is fire-resistant construction required? The requirement for fire-resistant construction depends on many factors. If it is important that fire-resistant construction is not required for the project, please contact the Permit Center at 720-5240 and ask to speak to the Senior Plans Examiner to discuss this issue. FIRE: 1. Does the Fire Department require access? All the specifics are found in the International Fire Code (IFC) Chapter 5 and Appendix D. Fire access is required for new construction and building additions. If the proposed structure is over 150 feet from a public street or is located on main arterials, on-site fire department turnarounds are required. All fire access roads shall have a minimum width of 20 feet (26 feet for buildings over 30 feet tall) and a 30 -foot turning radius. 2. Do I need fire suppression and/or fire alarm systems? If an existing building(s) is sprinkled and/or has a fire alarm system, the systems shall be extended into the new addition. Tenant improvements may require revisions to existing systems. If a change of occupancy is occurring, and/or if new construction is proposed, sprinkler and fire alarm systems may be required, based on the type of construction and on the proposed use. Specifics are found in the International Fire Code (IFC) Section 903 & Section 907. PLANNING: 1. The Planning Division addresses maximum building height determined by the zoning district. Contact the Planning Counter at (509) 720-5310 or nlanning(spokanevalley.org for more details. 2. Is paving required? Yes. All driveways, parking areas and travel ways must be paved with concrete, asphalt or an approved hard surface, except gravel. 3. When is landscaping required? If you are proposing new construction, a building addition or site improvements, then landscaping is required. Most projects require a certified landscape architect to prepare a landscape plan. The Project Planner reviewing your proposal will estimate you how much landscaping you will need based on Section 22.70.030 (Screening and Buffering) of the Spokane Valley Municipal Code (SVMC) and if a design professional is required. DEVELOPMENT ENGINEERING: 1. Will I need to dedicate street right-of-way? When streets fronting a piece of property are not wide enough, public right-of-way and/ or border easement dedications may be required to offset the traffic impacts of the project. Dedications may also be required if a new street is necessary as required by the City's Street Standards, the Arterial Street Plan, or the Local Access Connection Plan. Because the dedications are viewed as mitigation for increased traffic from the project, no monetary compensation is provided. 2. Are street frontage improvements required? If not already in place, street frontage improvements, including pavement, curb, gutter, swale and sidewalk, may be required depending on the size and scope of your project. Specific requirements can be found in Chapter 2 of the City's Street Standards 3. Will I need to prepare a traffic study? Most projects require a review of the traffic generated by the proposal. In general, smaller projects that generate less than 10 PM Peak Hour Vehicular Trips require a brief letter from the applicant describing the project and number of expected new residents or employees. Projects generating more than 10 PM Peak Hour Vehicular Trips need to submit a Trip Generation and Distribution letter from an engineer licensed in PL -35 V -I Page 6 of 7 Washington State, If a project generates more than 20 PM Peak Hour Vehicular Trips to an intersection of two arterial streets, a Traffic Impact Analysis prepared by an engineer is required. The size and scope of the study is coordinated through the City's Traffic Engineer. 4. Will I need a drainage report? Projects proposing new drywells or 5,000 sq. feet or more of new buildings or pavement typically trigger stormwater storage and treatment requirements. This may require a drainage report, a drainage plan, and erosion and sediment control plan prepared by an engineer licensed in Washington State. Projects replacing impervious surfaces with in-kind materials usually do not trigger stormwater requirements unless the improvements cause stormwater to flow differently. On redeveloped sites where pre-existing facilities remain, the old facilities are not subject to stormwater requirements if they remain hydraulically isolated from the new facilities. Specific requirements can be found in Chapter 2 of the Spokane Regional Stormwater Manual. PL -35 V -I Page 7 of 7