Loading...
1988, 08-04 Painted Hills Club House Permits, Comments & C of O� ~�� �\ ^{u ` ` ��iJEF NUMBER= 8B800567 / �` °~~ n^�� ~~DAl 8/04/88 PAGE, 81 . `� \~� �(-q\ -e--A�PERMIT ` ^ `���\ �� , ' '.�/ ` /»\ f\�0\ ` — *m**m*********************** PERMIT INFORMATION »*********m************w*xm SITE STREET= 4403 S DISHMAN MICA RD PARCEL4= 335'44-914i ADDRESS= SPOKANE WA 99206 PERMIT '%E= GOLF COURSE CLUB HOUSE & TWO BRIDGES PLATO= 999999 PLAT NAME= RANGE BLOCK= LOT= ZONE= AGRI AREA= 00000000 F/A= F WIDTH= t OF BLDG%= 0 DWELLINGS= OWNER= %ENSKE' MICHAEL L STREET= RT 3 BOX 634 A ADDRESS= SPOKANE WA 99223 PHONE= DI%TO= DEPTH= E R/W= CONTACT NAME= JOHN MILLER / DIVCON PHONE NUMBER= 509 466 3900 BUILDING SETBACKS: FRONT= 0 LEFT= 0 RIGHT= 0 REAR= 0 ******************************* BUILDING PERMIT *********************w*v*** CONTRACTOR= STREET= ADDRESS= DIVCON INC BOX 18708 SPOKANE WA 99208 NEW= X DWELL UNITS= BLDG W X D = REQ PARKING= ENERGY CODE= WSEC PHONE= 509 466 8900 REMODEL= ADDITION= CHANGE OF USE= OCCUP. LD= BLDG HGT= STORIES= X %Q FT= *HANDICAP= UTILITY= WWP NWEC DESCRIPTION GROUP TYPE SQ FT CLUB HOUSE A-3 V -N 1865 SEWER= N HYDRANT= N ITEM DESCRIPTION QUANTITY COMMERCIAL VALUATION PLAN REVIEW FEE STATE SURCHARGE ENERGY SURCHARGE Y Y Y Y VALUATION ___ 80195,00 FEE AMOUNT ---------- 554.00 36O^10 3.50 15.00 ***************************** PAYMENT SUMMARY ****m***********w**»a******* PAYMENT DATE 08/O2/88 TOTAL DUE= PERMIT TYPE '-------------- RECEIPTO 2832 .00 TOTAL PAID= AMOUNT PAID FEE AMOUNT _____________ BUILDING PERMIf 932^60. 932.60 932.60 932.60 PAYMENT AMOUNT 932.68 ------ 932.60 AMOUNT OWING .00 ------------ .O0 ce/ 1 ce" � ` INSP - ID l., •r pez DATE 9(iel a---1 1 ' /..-5. 1-f Lt Pi -� B D NG � 03 _-- -- 11 L M N G -- -�-® II1 M H AN I L1111111111 -_- -- _ 11 1111 ®� O H E R Il . -- * * * * * * * * * * THIS SPACE FOR COMMERCIAL PLANS TRACKING / CERTIFICATES OF OCCUPANCY ONLY Date received for C/O processing:// 0",,S‹Plans pulled for final processing:/o,.3 _ Conditions to check: .4,,I, i.' Conditions resolved: /14 Temporary C/O requested (y/n) Received application: Approval granted: By: Certificate of Occupancy issued: By: 12 ,4dc c•.r Ninety days after C/O issuance: Owner/contractor called regarding the return of ptans: Date: Plans returned: Received by: No response from owner/contractor - plans destroyed: Notes: may..✓ orL (' }} 1.°1n) ii:: i' NUMBER= 88000567 \ - �' � E= 00/04/88 PAGE= l%G. c Ji )0 PERMIT x4 #******* ******* 4*** -urs**** X**n***- * ** *4***** ************* ear ac, 'PROJECT NOTE: TOPIC = CONDITIONS DEPT = BUILDING 4 SAFETY * i(******-***** *•x*********•******x*** t*x-*x-it*I( c*-**•*•*******)(********Y***********/- PRIOR TO OCCUPANCY: ENGINEERS CONDITIONS OF 8/1/80 TO BE SATISFIED LANDSCAPING TO BE INSTALLED HYDRANT TO BE INSTALLED PROCESSED BY: WENI)EL, GLORIA PRINTED BY : FORRY, JEFF ��� �.. 0**n**tt•***************-*********-*• TI--IF1NI< YOU ****** - ******-*********- **u INSP - ID Date received for C/O processing: Plans pulled for final processing: Conditions to check: Conditions resolved: Temporary C/0 requested (y/n) Certificate of Occupancy issued: Received application: By: DATE By: Ninety days after C/O issuance: Owner/contractor called regarding the return of plans: Plans returned: - Date: Received by: No response from owner/contractor - plans destroyed: Notes: B U I L D I N G p L U U M 3 1 N G M E H A N I C A L 0 T , li E R * * * * * * * * * * THIS SPACE FOR COMMERCIAL PLANS TRACKING / CERTIFICATES OF OCCUPANCY ONLY . Date received for C/O processing: Plans pulled for final processing: Conditions to check: Conditions resolved: Temporary C/0 requested (y/n) Certificate of Occupancy issued: Received application: By: Approval granted: By: Ninety days after C/O issuance: Owner/contractor called regarding the return of plans: Plans returned: - Date: Received by: No response from owner/contractor - plans destroyed: Notes: • ov v J4 4V4V4P 4 V 4IV4 MAP 1,S81,1KPAMMIEWAMIS(4 IMMI • • 01/4_,(IMIMIMP 11,MEMPA • • _RA/R•AMMIAP • IN IP AD-17tC,AW.14:1 ' , . , :ID ICIA71171j,r El 11/8/38 ..88.000.567.... EI g Date BU I LD I N G C 0 D ES D EPA RTM EN T Permit Number X' f J. . il Certificate of Occupancy il Building Address: SOUTH 4403 DI SHMAN MICA ROAD • g E. V Lot Block Addition: PARci, NO.. 3.35 41-9.11.+1 g Owner: MICHAEL L. SENSKE Address: RT 3068X 634 A . Occupancy Group: A-3 Land Use Zone: AGRI I g Construction Type of Building: V—I1 Occupied as: CLUB HOUSE AND BRIDGES k V. Occupant Load: 1 Additional Information: GOLF. .COURSE .CLUB. 1-.10USE. .&. TJ. •BRIDGEs i • g , • • • . - . • • This Certificate is issued pursuant to Section 307 of the Uniform Building Code and is to indicate the above described structure is approved for occupancy. , Building Official's Signature 1 - THIS CERTIFICATE MUST BE PERMANENTLY MAINTAINED IN ALL BUILDINGS OR STRUCTURES REFERRED TO ABOVE -If the building or structure I. is for E used any other occupancy than that listed, an application for change of occupancy shall first be made to the Building Codes Department of Spokane County. 5 Wti'icl- tr—e(11–ViiilWirciViil" V NI — Ir -N1 — —ViiMtralria —Fail ,–ricriVritia 111 nwifeN1 4 OFFICE OF THE COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON Project: GCLF_COURSE_CLUB_HOUSE_________ Address: S�-421�_DISHMAN_MICA_ROAD___ Parcel. No: 3544-9141 Re{ No. 8S::025_________ The County Engineering Department has completed a review of the above referenced project. The following information must be provided in order for us to proceed with our review. A) A drainage plan for the site which has been prepared in compliance with Spokane County "Guidelines for Stormwater Management". At a minimum the plan must contain: 1. Drainage calculations for stormwater volumes generated on site 2. Calculations for total impervious surfaces contained within the site, 3. Finished grade elevations for structures to be constructed on site. .4^ Finished grade elevations at the Lop and bottom of the 2C8 swale. 5. A typical cross section of the 208 swale. 6. CaIculaLions to justify the number• and type o[ dryweIls proposed. 7. Elevation of drywell inlets where applicable. B) The subject properLy is aff�cted b7 the "Findings and Order" and Lhe ''Co,:lditions o{ Approval" for the Followinguse action: 1. CondiLional Use No. CUE -26-85 C) The following improvements within adjacent Right of Way are required prior to the release of a building permit: pcn'/`�c, ` SET FORTH -mTHE AND OR�ER !L_USE_PERMIT� IMPROVEMEN� 2. Approach permits must be obtained from the County Engineering Department for driveway approaches to the following streets a. THOR�E ROAD D) Insufficient information was submitted with the proposal. We are unable to proceed with our review. We will need the following before we can proceed: 1. Drainage plan as specified. Your contact person at the County Engineering Department may be contacted by calling 456-3600. Your contact person is GARY NELSON Spokane County Department of Building & Safety TO Paul Chase, Fire District 1 Ken Jeffrey, Building and Safety Bob McCann, Engineer's Office Tom Mosher, Planning Department Eric Olson, Fire District 1 John Pederson, Planning Department Daryl Way, Health District JAMES L. MANSON, DIRECTOR FROM: Tom Davis, Code Compliance Coordinator Department of Building and Safety DATE: March 31, 1988 RE : Amendment to the 3-28-88 Pre Construction Conference .South 4211 Dishman Mica Road - Golf Course Clubhouse Please revise Item 1. d) under Planning Department (Discussion/ Requirements), page 2 to read: d) At the initial phase the parking lot shall have 65 paved and striped stalls. Also, please delete 1. g) under Planning Department (Discussion/ Requirements). Should you have any questions or need additional information, please feel free to contact me. TLD:db cc: Mr. Jim Legat, Utilities Department N(I1ITT-T R11 TFFyPt.cr AT cnnTt A !TT^. TN A CTTt7.trmnwt nnnrn.nnen Spokane County Department of Building & Safety JAMES L. MANSON, DIRECTOR TO Paul Chase, Fire District 1 Ken Jeffrey, Building and Safety Bob McCann, Engineer's Office Tom Mosher, Planning Department Eric Olson, Fire District 1 John Pederson, Planning Department Daryl Way, Health District F4OM: Tom Davis, Code Compliance Coordinator Department of Building and Safety DATE: March 30, 1988 RE March 28, 1988 Pre -Application Conference South 4211 Dishman Mica Road - Golf Course Clubhouse Enclosed is your copy of the minutes to the above -referenced meeting. Should you have any questions, please let me know. TLD:db cc: Mr. Jim Legat, Utilities NORTH 811 JEFFERSON • SPOKANE, WASHINGTON 99260.0050 • TF.I.F.PHnNF (g0Q1 4c,R-RF7c MINUTES PRE -APPLICATION CONFERENCE SOUTH 4211 DISHMAN MICA ROAD - GOLF COURSE CLUB HOUSE CALL TO ORDER: The meeting was called to order at approximately 10:00 a.m. by Building and Safety's Code Compliance Coordinator Tom Davis, with the following in attendance. PERMIT REVIEW PARTICIPANTS: Donna Beukelman, Building and Safety Paul Chase, Fire District 1 Tom Davis, Building and Safety Ken Jeffrdy, Building and Safety Bob McCann, Engineer's Office Tom Mosher, Planning Department Eric Olson, Fire District 1 John Pederson, Planning Department Daryl Way, Health District APPLICANTS: John Miller (contact person), Divcon Inc., Box 18708, Spokane, WA 99208 Michael L. Senske, Route 3, Box 634-A, Spokane, WA 99223 SCOPE/PROJECT DESCRIPTION: I. General Overview - The applicant is proposing to construct a nine hole 3,400 yard golf course with a 2,000 square foot clubhouse on a five acre section two feet above the flood plain. Approximately three percent of the property will be graded and two bridges for golf cart use will be constructed. The applicant has started the process of petitioning for Thorpe Road to be changed to 45th. II. Construction Schedule - Will start May 1 on storage building, clubhouse and parking lot. SUMMARY OF DEPARTMENTAL REQUIREMENTS: I. Planning Department (456-2205) A. Discussion/Requirements 1. It was noted that this proposal was approved for a conditional use permit (CUE -26-85) on November 4, 1985. Some of the conditions in the conditional use (CUE -26-85) are as follows: -1- a) A specific landscape plan specifying the location, size, height of plants including sprinkler system for the high activity area. b) Sign requirements are to be specified as per Section 4.27.120f of the zoning ordinance. c) The applicant shall obtain a flood plain permit from Engineers. d) At the initial phase the parking lot shall have 65 paved and (strippe stalls. e) Be in compliance with the ASA overlay zone. f) A final site development plan for the golf course, including the description of lighting, fencing, gates, water hazard ridges and signs shall be submitted for approval."'-" g ) Be in colnpi-i AS • -crlay zone. 2. Tom Mosher clarified condition of number 5 regarding club house activities. 3. Tom Mosher discussed the conditions of the mitigated determination of non -significance. That prior to any further grading work, the conditions of the threshold determination shall be completed including obtaining the flood plain development permit pursuant to the Flood Plain Management Program administered by County Engineer's Office. B. Permit Release Requirements 1. The proposal shall comply with the conditions of the conditional use permit (CUE -26-85). That a final site plan be submitted for review and approval. The site plan is to include lighting fencing, landscaping, property dimensions, parking and other items identified as a condition of the conditional use permit. II. Engineering (456-3600) A. Discussion/Requirements 1. Comments relating to a drainage plans was given to the applicant and Building and Safety by Bob McCann. 2. Your contact person at the Engineer's Office will be Cary Nelson. It was requested that the applicant contact Gary to find out his time schedule for review of the proposal. 3. It was stated that the project must comply with the Engineer's conditions of the conditional use permit. -2- 4. It was stated that a drainage plan for the parking lot and clubhouse site must be submitted for review and approval. 5. It was stated an approach permit must be obtained for driveway approaches to Thorpe Road. B. Permit Release Requirements 1. A drainage plan for the site which has been prepared in compliance with Spokane County "Guidelines for Stormwater Management" must be submitted. 2. A RID/CRP agreement for Thorpe Road 'must be recorded. The applicant stated that it is their desire to enter an agreement from the west end of the bridge to the intersection. This request may be accomplished through a request for a design deviation. III. Health District (456-6040) A. Discussion/Requirements 1. It was stated that a permit for the on site sewage disposal system will be required. 2. The proposal is in an ASA overlay zone, thus an' agreement must be signed to allow access to septic tanks on an annual bases for the purpose of sampling to check for the presence of critical materials. The cost of the sample retrieval and laboratory analysis will be the responsibility of the owner. 3. Sizing of the septic system will be based on the peak flow from the building which can be determined from comparative water use figures from similar facilities. EPA standards require 50 gallons per seat per day. If system design exceeds 3500 gallons per day, the Department of Social and Health Services will have jurisdiction for review and approval. 4. It was stated that the proposal must comply with the Environmental Health conditions of the conditional use permit (CUE -26-85). 5. It was noted that the water will be connected to Spokane Suburban and the project will not be using the on site well. 6. It was noted that the storage building with a restroom will be pumped to the system serving the clubhouse. 7. The on site sewage system shall maintain a 3 foot grade separation from the flood plain. B. Permit Release Requirements 1. An application for a sewage disposal permit needs to be submitted plus water usage data in order that the system may be sized. IV. Utilities Department (456-3604) V. A. Discussion/Requirements 1. The utilities Department was not present and did not have any comments. Building and Safety (456-3675) A. Discussion/Requirements 1. A letter with comments relating to the preliminary plan review for the proposal were given to the applicant by Ken Jeffrey. It was noted there are no - plans for the structure available at this time. B. Permit Release Requirements 1. Two complete sets of construction plans and an addendum addressing the items discussed in the plan review letter are required to be submitted for review and approval. VI. Fire District 1 (928-4262) A. Discussion/Requirements 1. Access for emergency equipment including turn arounds was discussed. 2. Fire flow requirements are to be determined. 3. It was apparently determined that the construction site is located within the fire district's boundary which is adjacent to Fire District 8. -4- ( B. Permit Release Requirements 1. Fire district will need a copy of the site plan for review including fire flow figures. APPLICANT'S COMMENTS/ACKNOWLEDGEMENT: The applicant acknowledged that all comments/requirements were understood. The applicant had no further questions at this time regarding permit requirements. CORRECTIONS: To minutes or changes from what appears in the minutes, we should be notified within one day of your receipt of these minutes. To plans as required by any or all of the above -listed departments shall be submitted in sets of 7 to Building and Safety who will then distribute accordingly to each department. ADJOURNMENT: There being no further business, Tom Davis thanked the applicant and the departments for their participation and reminded all that he should be contacted if there are any unforeseen problems which may arise. The meeting was adjourned at approximately 10:30 a.m. Copies of Minutes to: All participants File - -5- INSPECTION CARD LIST OF SPECIFIED ZONING IMPROVEMENTS Permit #: cIp-at)14 Project Name :--�j`(, CIAO Site Address:.41.40 a Gj 1 Project Description: elo Checked box represents inspection has been verified. 1Y1- t`-/Utrk_, ad cv.-� vine l9 tv Setbacks (proposed: ❑ Front Yard: 15 ra+^ ^'Ke U- �`� ❑ Side Yard: 3f As ❑ Rear Yard: ceek Other: Lighting shielded: Landscaping: Se Field verified: 1NNo ton(s) til No Parking: Provided stalls #: A stalls #: ❑ VanADA stalW ❑ Loadu. pores #: ❑ Compacf Stalls #: n Bicycle spaces �❑ Stall dimensions verified P RMIT CONDITIONS: Planning Condition: Prior to the issuance of a C of 0 the person(s) who prepared the landscape plan shall certify that the irrigation system(s) and landscaping has been installed in accordance with approved and stamped plans (by City) and specifications. Send document to Karen Kendall, Planner via email at kkendall@spokanevalley.org or retail to the Permit Center at 11703 East Sprague Avenue, Suite B-3; Spokane Valley, WA 99206. STATUS: n Complete n Re -Inspection Required. Reason: n Other: Inspector: Date: THESE PLANS MUST REMAIN ON SITE AT ALL TIMES FOR INSPECTIONS) Michael Needham, Director Spokane County Planning • Spokane, Washington • Re: Revised Parking Plan Chester Creek Par 3 Thorpe Road Michael, August 23, 2000 Attached are revised plans showing the conversion of angle to parallel parking. along Thorpe Road with replacement of lost parking spaces in a new lot adjacent an• est of the Par 3 pro shop as Spokane County requested. e 6 3hPealh Note that the new parking encroaches t e critical area set back by a total of 300 square feet. This encroachment is mitigated by intensive planting of aspen and cottonless cottonwood trees from the north end of the parking area to the bridge improvement in Thorpe Road, comprising over 30 trees and 600 to 800 square foot buffer. This encroachment area currently and as improved will drain onto Painted Hills Golf Course property. I hope that these im.ra = is and modifications meet with. yo .r.pro al 1c= rte. ske -= Painted Hills Golf Course RECEIVED SPOKANE COUNTY AUG 2 3 2000 DIVISION of PL `aA NI Oma,