Loading...
2010 FEMA 10-yr Flood - Thorpe Rd History3) Levee overflow wier Built around 1988 88' long at elev. 2009.6' 3) Clubhouse built in 1988 at elev. 2013' 7) Rock Sump 50-60 yrds of drainrock 1999-2000 7) Painted Hills Par 3 Golf Course Built in 1999-2000 1) berm built by farmers year unknown 2" plastic line drains the sump pump r3) Painted Hills 9 Hole Golf Course L Built in 1988 '5) berm, need to find permit or design specs, built around 1995 -1998 (need to find survey of top, topo shows top at 2012-2013) drywell with sump pump (according to maintenance staff) 8) 20" water main (encased under creek, installed in 2000) 7) Parking area (paved in 2000, bldg permit & flood permit from County req at 2013.8') 8) built at 2010.4' in 2001 7) grassy weir overflow built around 2000 (need to find permit & survey of top) sJ b DIAWE $ 7) 12" dla culvert 8) water valve 6.5' deep Thorpe 2) two @ 15" culverts (plugged around 1987 -1995, GPS inventoried in 1995) CITY OF SPOKANE /j,9&L % 5) sewer line (4.5' deep to top of pipe, installed in 1995) .f 7) swales that do not work - (built around 2000) 6) Drainage Easement Harold Orr, 1999, for sediment basin maintenance; part of 1999 Chester Ck Cleanout Projec 1) berm built by farmers year unknown PETERS,vCF GOR18O ()THY E 2010 FEMA 100yr FLOOD Floodplain ,�//mi...,- Base Flood Elevations (NAVD 88) V/ Designated FLOODWAY [ I Old floodplaln limits (1988 FEMA)