2011, 09-29 Task Assignment "K" to Contract 10-027 Thorpe Topo Surveyr el Task Assignment Document
Task Number K
The general provisions and clauses of Agreement 10-027 shall be in full force and effect for this
Task Assignment
Location of Project: Thorne Road. Dishman-Mica to Madison
Project Title: Thorpe Road Topo Survey
Maximum. Amount Payable Per Task Assignment: $6.000 and no/100,
Completion Date: 7 Oct 2011
Description of Work:
Provide on-call surveying services in accordance with Exhibit A-1 involving topographic survey of
Thorpe Road Right -of -Way from Dishman-Mica to Madison Road and to include up to 300 feet of
Madison Road north of the intersection with Thorpe Road.
• Determine Right of Way for Thorpe road, a portion of Madison and East Right of way for
Dishman,
a Provide topographic data it contours within right of way as shown on exhibit provided.
fl Bridge Footings, ditches, culverts, and drywells along with other above ground evidence of
utilities will be shown.
o Horizontal Datum will be project datum with vertical datum to match Chester Creek x section
datum.
o Deliverables will be ACAD drawings in CSV standards.
o Monuments found to determine rights of way will be shown on mapping and flagged in field.
These should be protected during construction,
o Permit for Temporary Monument Removal is not included in this scope.
Agency Project Manager Signature:
Oral Authorization Date:
Consultant Signature:
Agency Approving Authority:
Date: .2-6, SEA" 20 tit
DOT Form 140.088 EF Formai TaskAsslgnment
Revised 6105
/J
See Latter Dated:
Date: x,'41.4 —(
Date: