Loading...
2019, 05-24 MDNS for SEP-2019-0006 Elks ApartmentsSUPERIOR COURT of WASHINGTON for SPOKANE COUNTY In the Matter of Notice of Mitigated Determination of Non -Significance City of Spokane Valley File Number & Name: SEP -2019-0006; Elks Apartments STATE of WASHINGTON County of Spokane AFFIDAVIT of PUBLICATION NO. LEGAL NOTICE MICHAEL Ht FFVIAN heinf_ irsl dtdy cicorn on oath depa,<,, and attys. that he is the EDITOR of the Spokane Valley NCVS mend ncenepaper and it is now and has been for meat liar six months prier Ir 'r ddie ubl.aeicn Idanadrhancr rcierddl ii rah 'shod in the relish an u a r,-Jnl til r a> a „eekl,, 11,,:a 1pm in Spokane a,ntn. `,t him�u r_ am,i S is noir and printed in an a' ilex maintained the dkIld' aid place of tion .;lid :;cia>paper, whist said nenvsoeper h.a'. been approt ad as a fce.al n.aa,paper by side ul the tit ,rotor Court of I c Mair nl t\ ashingto:: in and for Lpokeec County. 'that the Io l as - i; :a true copy of a Legal Notice as. „„ n ihlishr ,l L2.t i.:u:; commcnc na on the 24th day of May, 2019, aro cod ig u,i th. 24th day of May, 2019, all al at s iileRuise, ane that such ner' ,tpaper f:a; I ceulerd di al l -sled to its subscribers during all of said period: Notice of Mitigated Determination of Non -Significance (MONS) City of Spokane Valley Date Issued: May 24, 2019 File Number & Name: SEP -2019-0006; Elks Apartments Proposal Description: Environmental review of a 14.79 acre site for a 322 unit apartment complex totaling nine buildings and 610 parking stalls. There will be as- sociated earth disturbance of approximately 6,000 to 10,000 cubic yards and blasting to facilitate removal of Insitu rock. Proposal Location: Parcel numbers 45091.1646, 45091.1647, 45095.1648 and 45091.1649, located between Mansfield Av- enue and Marietta Avenue on the west side of Pines Road (SR 27), further located in the SE 14 ulthe NE 'A of Section 9, Township 25 North, Range 44 East, Willamette Meridian, Spokane County, Washington, Applicant: Todd Whipple, WCE, 21 South Pines Road, Spokane Valley, WA 99206 Owner: Dennis and Melissa Crapo, 2602 North Sullivan Road, Spokane Valley, WA 99216-1603 Person Completing Checklist: ```\1111111111/4,4 o�NS. � yy'o,iffdr'fr.'"•••\\ 14 My Conn, boys May 16, 2923 { 2 Lead Agency: City of Spokane Valley P4°24743• The lead agency for this proposal has r7A determined that it does not have a prob-v ' �B `-- able significant adverse impact on the ae) ` environment. An Environmental Impact '/� 0 S ,` Statement (EIS) isnot required under RCW r, F WASH �.� 43.21C.030(2)(c). This decision was made At1//fltttttt `` after review of a completed environmental checklist and other information on file with the lead agency. This information is avail- able to the public on request. Determination: This MONS is issued under WAC 197-11-340(2h comments must be . received by 5:00 p.m. on June 7, 2019. S Stan Contact: Karen Kendall, Planner, City. IZ of Spokane Valley Permit Center; 10210 it East Sprague Avenue, Spokane Valley, WA 4 99206, PH: (509) 720-5026/FX (509) 720- 00 5075, kendaletspokanevalley-org Responsible Official: Lori Barlow, AICP, it Senior Planner tl Mitigation Measures: Blasting 1. All blasting operations shall comply with -1 WAC 296-52. 2. The following documents shall be sub - milted to the City of Spokane Valley Senior 1 Engineer for review and approval: G Ben ooe mansen, WCE 1 a. Ablest plan, that includes a road closure L plan for Pines Road, shall be submitted a minimum of 72 hours (3 business days) I before any scheduled blasting occurs. Any I traffic control plans shall be reviewed by the City of Spokane Valley (CITY) and Wash- 1 Ingtan Stale Department of Transportation ' (WSDOT); and b. A pre -blast notification letter and distri- bution plan, that includes affected property 1 owners, shall be submitted al least one I week prior to any blasting activities. c. Give 48 hour notice of the time and place I of blasting operations to Richard Moorhead, 1 WSDOT via email at moerhdrekwsdct. 1 wa.gov and phone (509) 324-6552. d. Give 48 hour notice of the time and place of blasting operations to the following utility companies; Avista, Spokane County I Environmental Services, Irvin Water District No.6, Comcast, and Century Link. e. Notify the Spokane Valley Fire Depart- ment at (509) 928-1700 no less than 48 hours prior to commencing blasting operations.. f. Contact Spokane Valley Fire -Department dispatch at (509) 532-8900 belore and im- mediately after blasting occurs. • g. Seismograph(s) shall be placed near the Irvin Water District's water tower located on parcel 45091.1644 during all blasting activi- ties. The number and placement shall be determined by Irvin Water District. Written documentation from Irvin Water District shall be provided to the CITY prior to any blasting that the placement and number of seismographs is acceptable. All data shall • be shared with Irvin Water District. h. Proof of sufficient Insurance, as required by WAC 296-52-60120 shall be provided r to Irvin Water District two weeks prior to I blasting activities. TRAFFIC 1. Prior to occupancy, as identified in the I Traffic Impact Study, the DEVELOPERshail provide a two-way left turn lane on SR 27 and the new driveway into the Elk's Aoart- ,77 SI. : BED and SWORN to before me s 24th day of May, 2019 State of Washington County of Spokane I certify that I know or have satisfactory evidence that Michael Huffman is the person who appeared before me, and said person acknowledged that he signed this instrument and acknowledged it to be his free and voluntary act for the uses and purposes mentioned in the instrument. Jolerl'e`ae Wen 'title: Notary -Public My appointment expires: 05-16-2023 4 icorr93- wants (PROJECT) in a manner consistent j with the concept plan developed by Whipple i Consulting Engineers Idled 'Traffic Exhibit' I dated 02/01/2019. 2. The DEVELOPER shall work with WS - DOT and the CITY to complete an Intersec- tion Plan for WSDOT and CITY signatures. Upon approval,. the DEVELOPER shall design construction plans using WSDOT and CITY design standards. The DEVEL- OPER will enter into a voluntary agree- ment between WSDOT and the CITY The DEVELOPER Agreement will establish but not be limited to road revision requirements, submittal documents, right-of-way dedica- lion for streets, and authority to execute and carry out the agreement. 3. Once all parties have entered into the agreement, the DEVELOPER shall submit a schedule for the PROJECT that includes project milestones to complete Plans, Specifications, and Estimates (PS & E) package. The schedule will allow time -for design review by WSDOT and CITY staff as the PROJECT progresses. 4. The DEVELOPER shall build, inspect, and manage the construction of the PROJ- ECT with oversight from the CITY and WSDOT. All work on SR 27 will need to conform to the applicable WSOOT and CITY standards and specifications. 5. The DEVELOPER shall pay to the CITY atransportation mitigation tee of $65,073.75 towards street Improvements as identified in the Mirabeau Sub Area plan conducted in 2016. These lees may be paid on a per apartment building basis as permits are ob- tained for construction for each building. 6. MDNS Trip Budget: Upon the accep- tance of the two-way left -turn -lane on SR 27 by the CITY and WSDOT, a trip budget for 201 pm peak hour trips (no pass by, no internal deduction) will be established by the City. Appeal: An appeal of this determination shall be submitted to the Community & Pub- lic Works Department within fourteen (14) calendar days after the date issued. The appeal must be written and specific factual objections made to the City's threshold determination. Appeals shall be conducted in conformance with Spokane Valley Munici- pal Code (SVMC) 17.90 Appeals, and any required fees pursuantto the City's adopted Fee Schedule shall be paid at the time of appeal submittal. Pursuant to WAG 197-11- 600, appeals shall be limited toa review of a final threshold determination. Carrie Koudelka, CMC Spokane Valley Deputy City Clerk PUBLISH: 5-24-2019