19-050.01 Inland Asphalt: Evergreen Rd Preservation Indiana to Mission Connector 400.0 -�y CHANGE ORDER NO: 7 ENGINEERING DIVISION CONSTRUCTION CONTRACT NO: 19-050,aI PROJECT: Evergreen Road Preservation Prefect•Mission to Indiana CONTRACT DATE: 7232019 PRIME CONTRACTOR: Inland Asphalt Company CIP NO: 289 DESCRIPTION OF CHANGES As the acted alndlm was be comoleled we discovered that about 90%of the Nissen Connector was dalamneted aloru with a small area on Evergreen Road. To flx this crews had to remind the area to a deeper depth and owe a thicker section gadc. Marco:matt*V of additional artndna and oevim was recuired on the Mission Connector:Two retches on Fvavean refitted a 12'of additional odrMna and cantina to fix the delemlnated areas. This mak was able to be done Mile the minder was mobilized to the alb reauirim lamer work days but didn't require additional workim days. Ihn.No. lba9tlkLa. MS liamathm Witt Pda I1tlal 145 PLANING BITUMINOUS PAVEMENT.EXTRA DEPTH SY 4292 S 1.80 S 6,88720 148 HMA CL.3/9•PG 64H-213,1-INCH DEPTH SY 4040 S 3.55 S 14,342.00 147 HMA CL.3/8•PG 84H-28,12-INCH DEPTH SY 252 S 2.50 S 830.00 Total Arnow!of this Owings Order(lad.Taxis S 21,83920 Independent Justification on FileYes Verbal Approval._ Date 0/212019 1 Verbal Approval by E.AMSDEN^ PI!VS CAL COr1PL FT ION Original Contract Working Days:` 15 Revision By This Change Order:__ 0 Revisions by Price Change Orders: 0_ Total Revised Conrad Working Days:_ 15 -- CONTRACT AMOUNT THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT__ i _ S 707284.51 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT _ $ 0.00 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER S 707.284.51 NET THIS CHANGE ORDER S 21,839.20 3.w% TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDERRDER 1 S 729.12371 CONTRACTOR ACCEPTANCE: // r 1-22T DATE: 7J L 3/20/ The contractor hereby accepts • adjustment under ale terms of Seam 1-04.4 of the original contract. ( r RECOMMF_NDED BY: [-. ./ A . I at. �.ry DATE: i(23/id APPROVED BY: . ./ DATE: 07Z-5 / r APPROVED BY: / A 2PE DATE: 744t ATTACHMENTS: WA Distribution: ORIGINAL TO: Cay of Spokane Valley Clerk's Olen COPIES TO: Contractor,PW Pmlaol Fla,Project Impeder,Finance Department COSY Form 9/512014