Loading...
19-070.02 NA Degerstrom: University Pavement Preservation Silek Valley CHANGE ORDER NO: 2 ENGINEERING DIVISION CONSTRUCTION CONTRACT NO: 19-070.02 PROJECT UNIVERSITY ROAD PAVEMENT PRESERVATION CONTRACT DATE 4/4/2019 PRIME CONTRACTOR N A DEGERSTROM,INC CIP NO 287 DESCRIPTION OF CHANGES Locations of exiting water mains on side streets were not according to plan location. Model Irngation District also desired to extend the side street connections further away from University Road in order to make future upgrades on side streets easier. Multiple Field Work Directives(No.2,3,4,5,7,9, 10, 11 8 12)were provided to Contractor to provide direction on changing all the connection details(No. 1- 18)on these side streets. This change order creates items to pay for the additional work(installation of fittings,restraints,couplings,etc)for each water connection. The change order also increases existing items quantities and creates new items for the additional roadway removals and patch backs associated with this change. Item No. Description Unit Quantity Unit Price Total 304 (Sch C) 6"Water Pipe L.F. 150 $ 23.50 $ 3,525.00 305 (Sch C) 4"Water Pipe L.F 15 $ 21 00 $ 315 00 307 (Sch C) Water Pipe Conn Detail No.2 Each -1 $ 4,000.00 $ (4,000 00) 321 (Sch C) Crushed Surfacing Top Course,8In Depth S Y 250 $ 12 75 $ 3,187.50 322 (Sch C) HMA for Pavement Repair CI. 3/8 In.,PG 64-H-28,3 In Depth S Y 250 $ 19 00 $ 4,750 00 326 (Sch C) Remove Cement Conc.Curb L.F 100 $ 650 $ 650.00 327 (Sch C) Remove Cement Conc Sidewalk S Y 10 $ 1000 $ 100.00 328 (Sch C) Remove Cement Cone Cross Gutter S Y 60 $ 32 00 $ 1,920.00 329 (Sch C) Sawcut Pavement for Pavement Repair L.F. 280 $ 1.50 $ 420.00 330 (Sch C) Pavement Repair Excavation Incl Haul S.V. 250 $ 1150 $ 2,87500 331 (Sch C) Cement Conc Traffic Curb 8 Gutter L F. 30 $ 40.00 $ 1,200 00 332 (Sch C) Cement Conc Traffic Curb L F 80 $ 3500 $ 2,80000 333 (Sch C) Cement Conc.Cross Gutter S.V. 60 $ 192.00 $ 11,520.00 334 (Sch C) Cemenct Conc.Sidewalk S Y 10 $ 60 00 $ 600 00 335 (Sch C) Revised Water Connection Detail#1 Each 1 $14,400 00 $ 14,400 00 336 (Sch C) Revised Water Connection Detail#3(Credit) Each 1 $ (2,700 00) $ (2,700 00) 337 (Sch C) Revised Water Connection Detail#4 Each 1 $ 4,600.00 $ 4,60000 338 (Sch C) Revised Water Connection Detail#5 Each 1 $ 2,050 00 $ 2,050 00 339 (Sch C) Revised Water Connection Detail#6-14 Each 9 $ 2,950 00 $ 26,550.00 340 (Sch C) Revised Water Connection Detail#15 Each 1 $ 2,05000 $ 2,05000 341 (Sch C) Revised Water Connection Detail#16-17 Each 2 $ 3,80000 $ 760000 341 (Sch C) Revised Water Connection Detail#18 Each 1 $ 6,550.00 $ 6,550.00 342 (Sch C) Combination Air Vacuum Relief Station Each 1 $18,00000 $ 16,00000 Total Amount of this Change Order: $ 106,962 50 8 9%Sales Tax(applicable only to Bid Schedule C) $ 9,519.66 VERBAL APPROVAL AND JUSTIFICATION Independent Justification on File Yes Verbal Approval N/A Verbal Approval by N/A Original Contract Working Days 55 Revision By This Change Order 16 Revisions by Prior Change Orders 0 Total Revised Contract Working Days 71 CONTRACT AMOUNT THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT $ 3,121,354.50 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT(None) $ -3744000 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 3,083,914.50 NET THIS CHANGE ORDER $ 106,96250 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 3,190,87700 CONTRACTOR ACCEPTANCE � DATE TbebreWreolorhereby accepte this .,. ... r _ /,/�,/eeion r'. ...,.. _ RECOMMENDED BY Ve-' ` � DATE a/IA /Il roied Manager -wai APPROVED BY ' DATE ( 'r 1 / p /My frog izlrlcl 19 p APPROVED BY ( DATE ! iN/ I�/r/� ,- //� (p, Cd Engineer / APPROVED BY ,p I,p/� ' eW l tbk DATE co 7 / 'q City Manager { 111 ATTACHMENTS D stnbutron ORIGINAL TO City of Spokane Valley Clerk's Office COPIES TO Contractor,PW Project He.Project Inspector,Finance Department de in" '`fie'` al Change Order No: 2 Construction Contract No: 19-070.02 THE CONTRACT IS MODIFIED AS FOLLOWS: WORK TO INCLUDE Background: Locations of exiting water mains on side streets were not according to plan location. Model Irrigation District also desired to extend the side street connections further away from University Road in order to make future upgrades on side streets easier. Multiple Field Work Directives(No. 2,3, 4, 5, 7,9, 10, 11 & 12)were provided to Contractor to provide direction on changing all the connection details(No. 1-18)on these side streets. Description of Change: This change order creates items to pay for the additional work(installation of fittings,restraints, couplings,etc)for each water connection. The change order also increases existing items quantities and creates new items for the additional roadway removals and patch backs associated with this change. Specification: There are no changes to the specifications because of this change. Plans: Sheet WA3 was replaced from Field Work Directive#4 Sheet WA4 and WAS was replaced from Field Work Directive#5 Time: There will 16 working days added to the contract in result of this change. Measurement: "Remove Cement Conc.Cross Gutter,"shall be measured by the square yard. "Cement Conc. Cross Gutter," shall be measured by the square yard. `Revised Water Connection Detail .'shall be measured by each. "Combination Air Vacuum Relief Station,"shall be measured by each. Payment: Payment for new item#328"Remove Cement Conc. Cross Gutter", square yard. ina �`�el� jVdi� Change Order No: 2 Construction Contract No: 19-070.02 The unit Contract price per square yard for"Remove Cement Conc.Cross Gutter",shall be full pay for furnishing all tools, labor,equipment, and materials required to sawcut,remove,load,haul,excavate to subgrade and dispose of the work as specified Payment for new item#328"Cement Conc. Cross Gutter",square yard. The unit Contract price per square yard for"Cement Conc.Valley Gutter ", shall be full pay for all costs necessary to furnish all labor,tools, equipment; compact the subgrade; place and compact CSTC, furnish,place,finish, cure and protect the Cross gutter Payment for new items#335-342"Revised Water Connection Detail ,'per each. The unit Contract price per each for"Revised Water Connection Detail ,",shall be full pay for all costs necessary to furnish all labor,tools,equipment to furnish and install additional fittings,pipe restraints, 8 inch water pipe,couplings, and valves according to Field Work Directives(No.2,3, 4,5,7, 9, 11 & 12). Work also includes landscape/fence removal and restorations Payment for new items#343 "Combination Air Vacuum Relief Station,"per each. The unit Contract price per each for"Combination Air Vacuum Relief Station,",", shall be full pay for all costs necessary to furnish all labor,tools,equipment to furnish and install the combination air vacuum relief station according to Field Work Directive No. 10,excavation . Work also includes landscape removal and restorations Work for sawcutting,asphalt removal, concrete removals,4 inch pipe,6 inch pipe, curb installation,sidewalk installation,and asphalt patching will be paid under existing bid items. Summary of Ouantities: s. 81 / I' Is -x 1 : t e - ta. Rt d �!I rC 2s i 4C `sJ i + x c �' 7, 304 6"Water Pipe L.F. 260 410 +150 $23.50 $3,525.00 305 4'Water Pipe L.F. 90 105 +15 $21.00 $315.00 307 Water Pipe Conn.Detail No.2 Each 1 0 -1 $4,000.00 $-4,000.00 321 Crushed Surfacing Top Course, S.Y. 3,650 3,900 +250 $12.75 $3,187.50 B In,Depth. 322 HMA for Pavement Repair Cl. S.Y. 3.650 3.900 +250 $19.00 $4,750.00 3/8 In.PG 64H-28,31n,Depth 326 Remove Cement Conc.Curb L.F. 0 100 +100 $6.50 $650.00 (NEW) 327 Remove Cement Conc.Sidewalk S.Y. 0 10 +10 $10.00 $100.00 (NEW) 328 Remove Cement Conc.Cross S.Y. 0 60 +60 $32.00 $1,920.00 (NEW) Gutter 329 Sawcut Pavement for Pavement L.F. 0 250 +280 $1.50 $420.00 (NEW) Repair 330 Pavement Repair Excavation S.Y. 0 250 +250 $11.50 $2,875.00 (NEW) Incl Haul m,w /\--.. ajValley Change Order No: 2 Construction Contract No: 19-070.02 331 Cement Conc.Traffic Curb& L.F. 0 30 +30 $40.00 $1,200.00 (NEW) Gutter 332 Cement Conc.Traffic Curb L.F. 0 80 +80 $35.00 $2,800.00 (NEW) 333 Cement Conc.Cross Gutter S.Y. 0 60 +60 $192.00 $11,520.00 (NEW) 334 Cement Conc.Sidewalk S.V. 0 10 +10 $60.00 $600.00 (NEW) 335 Revised Water Connection Each 0 1 +1 $14,400.00 $14,400.00 (NEW) Detail#1 336 Revised Water Connection Each 0 1 +1 $-2,700.00 $-2,700.00 (NEW) Detail#3(Credit) 337 Revised Water Connection Each 0 1 +1 $4,600.00 $4,600.00 (NEW) Detail#4 338 Revised Water Connection Each 0 1 +1 $2,050.00 $2,050.00 (NEW) Detail#5 339 Revised Water Connection Each 0 9 +9 $2,950.00 $26,550.00 (NEW) Detail#6-14 340 Revised Water Connection Each 0 1 +1 $2,050.00 $2,050.00 (NEW) Detail#15 341 Revised Water Connection Each 0 1 +2 $3,800.00 $7,600.00 (NEW) Detail#16-17 342 Revised Water Connection Each 0 1 +1 $6,550.00 $6,550.00 (NEW) Detail#18 343 Combination Air Vacuum Relief Each 0 1 +1 $16,000.00 $16,000.00 (NEW) Station SUBTOTAL $106,962.50 SALES TAX @,8.9% $9,519.66 TOTAL $116,482.16 SnO / e ` WEEKLY MEETING AGENDA Y 11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 /ley 509.921.1000 • Fax: 509.921.1008 ♦ cityhall@spokanevalley.org PROJECT- University Road Pavement Preservation Project, CIP#0287 CONTRACTOR. N A. Degerstrom DATE: Tuesday, September 10, 2019 @ 10.00 AM Attendees: N A. Degerstrom Spokane Valley Model Irrigation Varela Engineering Schedule Review: • Utility Concerns: • Traffic Control and Safety Concerns: • rl tirj r- ?•Ytri Old Business: • Water Connection Change Order • Paving Matt,. a 'duet .. New Byyiness: tfi ',j Quality Control I Materials: • 9,, ix (AC I) Request for Information (RFI): Submitted: City Response: #1-Potholing 5129/19 5/30/19 #2-Plan Sheet Clarifications 5/31/19 6/4/19 #3-Water Main Location 6/7/19 6/13/19 #4-Connection#17 6/28/19 6/28/19 #5-25th&27th Connections 6/28/19 7/3/19 #6- #7-Pressure Test 7/11/19 7/11/19 #8-Water Valve Location 7/26/19 7/29/19 #9-Gas Crossings 8112/19 8/13/19 #10-Additional Fire Hydrant 8/12/19 8/14/19 #11-Potholing 331" 8/14/19 8/15/19 #12-Connection Detail#9 9/4/19 9/6/19 Field Work Directive(FWD): Sent: Response: #1-GPR 6/10/19 6/10/19 #2-Connection#17 6/28/19 7/2/19 #3-Connection#18 7/1/19 7/2/19 #4-Connection#15& 16 7/2/19 7/2/19 #5-Connections#6-14 7/8/19 7/29/19 #6-Curb Inlets 7123/19 #7-Connection #1-5 7116/19 7/29/19 #8-26th Removals 7/16/19 #9-Connection#6 8/7/19 #10-Air Vac Relief 8/15/19 #11-33'" Lateral&Connection 8/15/19 #12-Water Connection 8/19/19 Request for Pricing (RFP): Sent: Response: #1-Abandon Drywell 6/26/19 6/27/19 #2-J-Box Replacement 7/8/19 7/9/19 #3-HMA Pavement Repair 7/19/19 7/19/19 Change Orders: Executed MC#1-GPR 6/27/19 MC#2-Abandon Drywell 7/2/19 MC#3-J-Box Replacement 7/23/19 CO#1-Pavement Repair 8/8/19 CO#2-Water Connections Model to Sign