Loading...
2012-08-07 Permit: SW-12001931 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001931 08/07/2012 Expiration Date: 08/08/2012 Project Description: SEWER CONNECTION Primary Contact: COURCHAINE CONSTRUCTION Project Name: GREENHAVEN PH 3 Applicant: COURCHAINE CONSTRUCTION Permit Type: SEWER Address: 19818 E SPRAGUE GREENACRES,WA 99216 Phone: 509-924-5485 Email: SITE INFORMATION: Site Address: 505 N BARKER RD Owner: HIGGINS, RICHARD L&MARY A Parcel Number: 55184.0708 Address: 505 N BARKER RD GREENACRES,WA 99016-9409 Subdivision: CORBIN ADDITION Phone: Assessor's Description: CORBIN ADD GRNACRS PRT OF B7 BEG ON EL Email: OF B7 40FT N OF INT OF E&S LNS OF SD B TH N106FT TH W PAR TO SL 90FT TH S146FT TO SL OF B TH E5OFT TO PT 40FT S&40FT W OF POB TH TO LEFT ON CU RVE RADIUS OF 40F Inspection Area: Water District: Fire District:Spokane Valley Fire Consolidated Irrigation District#19 Zoning: Land Area: 12622 Square Feet CONTRACTOR INFORMATION: General Contractor COURCC*181 R7 COURCHAINE EXCAVATION 19818 E SPRAGUE GREENACRES,WA 99016 509-928-0846 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area Date Printed:08/07/2012 14:38:23 Printed by:IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001931 08/07/2012 Expiration Date: 08/08/2012 CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:08/07/2012 14:38:23 Printed by: IIS APPPOOL ASP.NET v4.0