Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2009, 04-13 Permit App: 09000793 Garage
' Project Number: 09000793 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 24 x 36 DET GARAGE Contact: WOEHRLE ETUX, L Address: 2405 S CHERRY CRT C - S - Z: SPOKANE, WA 99216-0340 Setbacks: Front Left: Right: Rear: Phone: (509) 928-9172 Group Name: Site Information: Project Name: Plat Key: 000915 Name: GAILS PARK EST District: Sout Date: 4/13/2009 Page 1 of 2 Parcel Number: 45273.3405 Block: Lot: SiteAddress: 2405 S CHERRY CT Owner: Name: WOEHRLE ETUX, L Address: 2405 S CHERRY CRT Location:: CSV SPOKANE, WA 99216-0340 Zoning: R-2 SF Res Suburban District Water District: 101 SPO CO WATER DIST#3B Hold: O Area: 11,850 Sq Ft Width: 90 Depth: 150 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 4/6/2009 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 4/1/2009 By: tschmidt Permits: ,a*. AIM,m,sx. Operator: JD Printed By: jmm Print Date: 4/13/2009 ' Project Number: 09000793 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/13/2009 Page 2 of 2 Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: DescriptionGrp Type Notes Su Ft Valuation Sq Ft Valuation GARAGE U-1 VB 864 $16,416.00 864 $16,416.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Notes: APPROACH PERMIT REQUIRED Payment Summary: Permit Type Building Permit Totals: 864 $16,416.00 864 $16,416.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $279.25 $69.81 $4.50 Permit Total Fees: $353.56 Fee Amount Invoice Amount $353.56 $353.56 $353.56 $353.56 Amount Paid $69.81 $69.81 Amount Owing $283.75 $283.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 4/13/2009 Spokane Valley. . CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevalley.org PERMIT NUMBER: (Staff Use Only) CG—C>--(q3 PERMIT FEE: RECEIVED BY CITY Or S - UtCANE VALLEY MAR 3 1 2009 f'LH GLN I LH RESIDENTIAL CONSTRUCT N PERMIT APPLICATION X] NEW CONSTRUCTION ❑ DECK SITE ADDRESS: 2 4 0 $ 5 ASSESSORS PARCEL NO.: ` 5. Z. 7 3 ADDITION/REMODEL ❑ ACCESSORY BUILDING ❑ OTHER C_ rl e_r.,y citJ G�4n� L/ 1 e . uJA -34-oy' l LEGAL DESCRIPTION: j,�Js e rk , ialLIrs 215 alk 3 BUILDING OWNER NAME: NAME: �orevi Cr, Vyo e_L -/ ADDRESS: CITY: 24 OS- 5 e v97 Srokar vu i(c/ PHONE:(5-64) 9 Lk 41 7Z CONTACT NAME: 5t1 rice tt STATE: LII—J 4 zIP: - -1 Z ( (_ `O3 T'c PHONE: ( FAX: Gt�DO�� Fax: CONTRACTOR NAME: MAILING ADDRESS: 2, .5 CITY: SpP`P'rC llcr PHONE(5 a'i) qz/- yi 72_ CONTRACTOR LICENSE No.: s ate' (-1-- STATE: fi CELL:( y d `l) 4 q c - CELL: / SSU/%irV/L/Qca STATE: �lJ� FAX: EXPIRES: zip: en ) 6 03 CELLO -41) CITY BUSINESS LICENSE NO.: DESCRIBE,�.TH SCOPE Of/WORK IN DETAILZAND IND AT U E: �d11S I�rvG Cl Stni[C 7L �^�i 2403 �J.+ .� a� lrt G -is its t+7.f { ii q(_j,�,11 / %X6�'' to. wrnl1, 4-�lL P,-ft�. eh.�eer-%usSry c uc+re •-+/ c►rGTrclvu.f S�t,ir�(Gi PROPOSED USE: 19eYson� Effective October 28, 2007 Page 1 of 1 C:\Documents and Settings\Woehrle\Desktop\Residential Construction Permit App.1.doc ****YOU MUST COMPLETE THE FOLLOWING**** LE Height tQ Beak: i✓.9Eiv Dimensions: 2_4A 3� No. of Stories: Total Habitable Space: S°6-4 s Main Floor SQ FT: d'ry Upper Floor SQ FT: �A— Unfinished Ba ement SQ FT: Finished Ba SQ FT: ent Garage SQ FT ©ii. 1� Deck/Covere SQ FT: �/ Patio Impervious Surface Area: �% 330% Slopes o, • 4 ,// No. ofA,44 Bedrooms: ,4 4 Construction Type: •w,>00 rce: Hea S��u � Nc!^, Sewer or, �?61$- TOTAL COST OF PROJECT: $ /2 000 , Q b DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation f federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required toubmitted and subsequently appr6fieefore this application can be processed. Signature Method of payment: ❑ Cash Bankcard #: ❑ Check Date: 3 /2 7/ 0 Visa 0 Mastercard EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 C:\Documents and Settings\Woehrle\Desktop\Residential Construction Permit App.1.doc 001 CD m m m r- 0 0 0 m CD PLANNING DEPT. APPROVED Spokane �Ualley For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review • Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 "1-.2 kJ) --0s1.0 0 or - 9/ 7 0 0 i o. w o- N � N n) CY1 O x�Con CA) w to O)co w c) co o s -D C) to -O 0 0) m 0) CD 0) co co N 0) su 3