2009, 09-02 Permit App: 09002750 Covered Deck and CarportProject Number: 09002750 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/2/2009 Page 1 of 2
Project Information:
Permit Use: RE -BLDG COVERED PORCH/CARPORT
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: MH000 Name: APPLE VALLEY ESTATES
Contact: TOETLY, GENE MBARBARA J
Address: 17205 E COACH DR
C - S - Z: SPOKANE VALLEY, WA 99016-9309
Phone: (509) 927-7882
Group Name:
Project Name:
District: East
Parcel Number: 55192.1103 Block:
SiteAddress: 17205 E COACH DR
Location:: CSV
Zoning: MF -1 MF MDR District
Lot:
Owner: Name: TOETLY, GENE NI/BARBARA J
Address: 17205 E COACH DR
SPOKANE VALLEY, WA 99016-930
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: 8,925 Sq Ft Width: 70 Depth: 127 Right Of Way (ft): 50
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 9/2/2009 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
Originally Released: 8/28/2009 By: cjjanssen
Operator: jmm Printed By: jmm
Print Date: 9/2/2009
Project Number: 09002750 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/2/2009 Page 2 of 2
Contractor: OWNER
Building Permit
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
DescriptionGrp Type Notes Sq Ft Valuation Su Ft Valuation
CARPORT OP R-3 VB 612 $9,180.00 612 $9,180.00
COV DECK R-3 VB 220 $3,300.00 220 $3,300.00
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Notes: �;
Payment Summary:
Permit Type
Building Permit
Totals: 832 $12,480.00 832 $12,480.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$223.25
$4.50
$89.30
Permit Total Fees: $317.05
Fee Amount Invoice Amount
$317.05 $317.05
Amount Paid
$89.30
$317.05 $317.05
Amount Owing
$227.75
$89.30 $227.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 9/2/2009
• Spokane
Valley
•
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel:(509) 688-003
Fax: (509) 688-0037
)kanevalley.org
MANUFACTURED HOME PERMIT APPLICA
❑ OTHER
PERMIT NUMBER:
PERMIT FEE:
(Staff Use Only)
l`
EIVED E,
SPOKANE V.�,:LEY
AUG 2 ; 2009
SITE ADDRESS: 17205 E. COACH DRIVE SPOKANE VALLEY, WA 99016
/V C7 C) /Q' ;4a C/ C,/
, 5Lj2 , aA-C6F
e
/mac -7 1i
• 7.47
(5 �
ASSESSORS PARCEL NO.: 55192.1103 LEGAL DESCRIPTION: 18 OTHER RESIDENTIAL
BUILDING OWNER NAME: BARBARA TOETLY
NAME: BARBARA TOETLY
ADDRESS: 17205 EAST COACH DRIVE
CITY: SPOKANE VALLEY
PHONE: 509-927-7882
CONTACT NAME: JEREMY CHAVIS
STATE: WA
ZIP: 99016
FAx:
CELL:
PHONE: 509-328-0321
FAX:
CELL:
CONTRACTOR NAME: JEREMY CHAVIS - FRIEND & FAMILY
MAILING ADDRESS: 517 W. CARLISLE
CITY: SPOKANE
STATE: WA
ZIP: 99205
PHONE: 509-328-0321
FAX:
CELL:
CONTRACTOR LICENSE No.:
EXPIRES:
CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
BUILDING A COVERED PORCH AND CAR PORT - ADD ONTO SIDE OF HOME WHERE THERE WAS AN EXISTING STRUCTURE THAT
WAS DESTROYED BY STORMS IN THE WINTER OF 2008
MANUFACTURED HOME WIDTH: 24'
MANUFACTURED HOME LENGTH: 56'
•YEAR OF MANUFACTURED HOME: 1980
PIT SET:
SEPTIC/SEWER: SEPTIC - SEWER SUMMER 2009
Effective October 28, 2007 Page 1 of 2
F:\Dana Work File\Word\Manufactured Home Permit App- Barbara.l.doc
MANUFACTURER:
PREVIOUS ADDRESS:
• PROPOSED USE:
DISCLAIMER
The permitted verlfles, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling Is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Date: 7
Method of payment: 0 Cash 0 Check
Bankcard #:
0 Visa ❑ Mastercard
EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
F:\Dana Work File\Word\Manufactured Home Permit App- Barbara.l.doc
SCITYoka
p ne
Valle
Y
For City User Only _
PLUS Project Number ' J 7 =) C'
Project Address / (' 60 c,
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Proiect Application Review
D Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
PLANNING DEPT. APPROVED
r
rq
V