19-070.03 NA Degerstrom: University Rd Preservation Dishman-Mica to 16th Spokane „,Walley CHANGE ORDER NO: 3 ENGINEERING DIVISION CONSTRUCTION CONTRACT NO: 19-070.03 PROJECT: UNIVERSITY ROAD PAVEMENT PRESERVATION CONTRACT DATE: 4/4/2019 PRIME CONTRACTOR: N.A. DEGERSTROM, INC. CIP NO: 287 DESCRIPTION OF CHANGES This change order creates an item to pay for the additional HMA pre-level work for the paving subcontractor on August 27th and September 21st. Labor and equipment were tracked using force account per Standard Specification Section 1-09.6. The total costs then was rolled into a lump sum price. This is also an administrative change order that increases the Contract amount to pay for the increased quantity of Contract Item#113-HMA for Pavement Repairs Cl.3/8 In PG 64H-28,3 In.Depth. Item No. Description Unit Quantity Unit Price Total 113 (Sch A) HMA for Pavement Repair Cl. 3/8 In. PG 64H-28, 3 In. Depth S.Y. 3,000 $ 16.50 $ 49,500.00 152 (Sch A) HMA Pre-Level L.S. 1 $ 13,082.79 $ 13,082.79 Total Amount of this Change Order: $ 62,582.79 8.9% Sales Tax , VERBAL APPROVAL AND JUSTIFICATION Independent Justification on File Yes Verbal Approval N/A Verbal Approval by N/A PHYSICAL COMPLETION Original Contract Working Days: 55 Revision By This Change Order: 0 Revisions by Prior Change Orders: 16 Total Revised Contract Working Days: 71 CONTRACT AMOUNT THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT $ 3,121,354.50 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT $ 69,522.50 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 3,190,877.00 NET THIS CHANGE ORDER $ 62,582.79 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 3,253,459.79 CONTRACTOR ACCEPTANCE: 77 ' `.. (V/311(3-' > -,o�n Bnuj.�r ;'Ga.�s�. /�( rDATE: ��! 1� The contractor hereby accepts this adj ent under the` -r of . .of the origin I contract. lr RECOMMENDED BY: ' _ DATE: I Project ager ... APPROVED BY: '.— y 4z DATE: 9/'• /9./7 City Engineer APPROVED BY: AI DATE: I k I / City Manager ATTACHMENTS: Distribution: ORIGINAL TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor, PW Project File, Project Inspector, Finance Department Spokane .jValley Change Order No: 3 Construction Contract No: 19-070.03 THE CONTRACT IS MODIFIED AS FOLLOWS: WORK TO INCLUDE Background: Issue#1 Contract provisions required the installation of a paving mat be installed on top of the existing pavement and below the paving of the final 2 ''A inch of hot mix asphalt(HMA)overlay. The contract provisions allowed the full depth HMA to be placed directly on the paving mat. At the beginning of the HMA paving, both the Contractor and City witnessed issues with compacting on top of the paving mat and therefore jeopardizing the ride performance of the roadway. At that time, the City directed the contractor to place a small lift(pre-level) on top of the paving mat to secure the paving mat from moving/slipping and to provide a rougher surface for the HMA overlay to compact on. There were no further issues once the pre-level was used. Issue#2 Contract plans identified approximate locations for pavement removal and HMA patching to eliminate sections of deteriorating asphalt. The City identified all areas to be removed/patched and the actual quantities ended up higher than the original contract amounts Description of Change: Issue#1 This change order creates an item to pay for the additional HMA pre-level work for the paving subcontractor on August 27th and September 21St. Labor and equipment were tracked using force account per Standard Specification Section 1-09.6. The total costs then was rolled into a lump sum price. Issue#2 This is an administrative change order that increases the Contract amount to pay for the increased quantity of Contract Item#113-HMA for Pavement Repairs Cl. 3/8 In. PG 64H-28, 3 In. Depth. Specification: There are no changes to the specifications because of this change. Plans: No changes have been made to Contract Plans because of this change. Time: No working days are added or deleted due to this change. Measurement: Issue#1 There is no specific measurement for lump sum item "HMA Pre-Level" Issue#2 Spokane jValley Change Order No: 3 Construction Contract No: 19-070.03 There are no changes to measurement because of this change Payment: Issue#1 "HMA Pre-Level", lump sum The lump sum Contract price for"HMA Pre-Level", shall be full pay for the labor and equipment to place a thin pre-level of hot mix asphalt on top of the paving mat prior to placing the 2 %2 inch HMA overlay. The material cost and hauling of the HMA for the pre-level is incidental to other Contract items. Issue#2 This change order increases the quantity of existing bid item and will be paid using bid unit prices. Summary of Quantities: Previous New Estimated Bid Item Description Unit Qty Qty Unit Price Amount Change 113 HMA for Pavement Repairs Cl. S.Y. 12,700 15,700 +3,000 $16.50 +$49,500.00 3/8 In. PG 6411-28,3 In.Depth 152 HMA Pre-Level L.S. 0 1 +1 $13,082.79 $13,082.79 (New) TOTAL $62,582.79