2013, 04-04 Permit: SW-13000383 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000383 Permit Issued Date: 04/04/2013
Expiration Date: 04/04/2014
Project Description: SEWER CONNECTION, DRY SIDE SEWER
Project Name: GREEN HAVEN II
Primary Contact: LAUER EXCAVATION & CONST
Phone: 509-981-7954
Applicant:
Address:
Phone:
Email:
LAUER EXCAVATION & CONST
PO BOX 11581
SPOKANE VALLEY, WA 99211
509-981-7954
SITE INFORMATION:
Site Address:
Parcel Number:
220 N CORBIN RD
55183.0659
Assessor's Description: CORBIN ADD TO GREENACRES N 100FT OF
THAT PTN LT 13 BLK 17 DAF; BEG ATA PT
393.94FT S OF NE COR SD LT 13; TH W 106.7FT
TO CORBIN RD; TH S ALG E LN OF SD RD TO
SLY LN SD LT 13; TH NELY ALG SLY LN SD LO
Inspection Area: : (509)-477-3675
Owner:
Address:
Phone:
Email:
MARSHALL, DELSA K
220 N CORBIN
GREENACRES, WA 99016
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District #19
Zoning: Land Area: 0.21 Acre(s)
CONTRACTOR INFORMATION:
LAUEREC931DA, Exp. 03/01/2015
LAUER EXCAVATION & CONST
PO BOX 11581 SPOKANE VALLEY, WA 99211
509-981-7954
DETAILS:
Class Type Quantity Unit Charge Value
SEWER DRY SIDE SEWER 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.32
$125.00
$151.32
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 04/04/2013 15:21:16 Project Coordinator: Laurie Carver
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000383 Permit Issued Date: 04/04/2013
Expiration Date: 04/04/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/04/2013 15:21:16 Project Coordinator: Laurie Carver