2013, 03-12 Permit: SW-13000199 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000199 Permit Issued Date: 03/12/2013
Project Description: SEWER CONNECTION
Project Name: GREEN HAVEN PH 2
Primary Contact: LAUER EXCAVATION & CONST
Phone: 509-981-7954
Applicant: LAUER EXCAVATION & CONST
Address: PO BOX 11581
SPOKANE VALLEY, WA 99211
Phone: 509-981-7954
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
304 N CORBIN RD
55183.0650
Assessor's Description: CORBIN ADD TO GREENACRES S98.44' OF
N393.94' OF E106.7' 0 F LT 13 & S98.44' OF
N393.94' OF LT 14 EXC E206.87 BLK 17
Inspection Area: : (509)-477-3675
Owner: LYBBERT, W DEAN & MARGARET
Address: 304 N CORBIN RD
GREENACRES, WA 99016-9521
Phone:
Email:
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District #19
Zoning: Land Area: 21560 Square Feet
CONTRACTOR INFORMATION:
LAUEREC931DA, Exp. 03/01/2015
LAUER EXCAVATION & CONST
PO BOX 11581
SPOKANE VALLEY, WA 99211
509-981-7954
DETAILS:
Class Type Quantity Unit Charge Value
SEWER
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION 1 $125.00 $125.00
Total Fee:
$26.32
$125.00
$151.32
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 03/12/2013 13:38:39 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000199 Permit Issued Date: 03/12/2013
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03/12/2013 13:38:39 Project Coordinator: Dawn Dompier