2012, 08-01 Permit: SW-12001885 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001885 , _ Expiration Date:
Project Description: SEWER CONNECTION
Project Name: GREEN HAVEN PH 2
Permit Type: SEWER
Primary Contact: PETERSON, C & P
Applicant: PETERSON, C & P
Address: 314 N CORBIN RD
GREENACRES, WA 99016-9521
Phone:
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
314 N CORBIN RD
55183.0649
CORBIN ADDITION
CORBIN ADD TO GREENACRES S98.5' OF
N295.5' OF E106.7' OF LT 13 & S98.5' OF N295.5'
OF LT 14 EXC E206.87' BLK 17
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 21560 Square Feet
Owner:
Address:
Phone:
Email:
PETERSON, C & P
314 N CORBIN RD
GREENACRES, WA 99016-9521
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
OVERMCI044NM
OVERMAN CONSTRUCTION
26114 E OLYMPIC
NEWMAN LAKE-, WA 99025
509-226-0862
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 08/01/2012 11:09:07
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001885 Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/01/2012 11:09:07
Printed by: IIS APPPOOL\ASP.NET v4.0