2012, 09-11 Permit: SW-12002177 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002177
Permit Issued Date:
09/11/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: GREEN HAVEN
Permit Type: SEWER
Primary Contact: DAN'S DEXCAVATING LLC
Applicant: DAN'S DEXCAVATING LLC
Address: 39710 MADISON
ELK, WA 99009
Phone: 509-292-8698
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
417 N CORBIN RD
55183.0408
Subdivision: CORBIN ADDITION
Assessor's Description: CORBIN GRNACRS KATHRINE L8 B1
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 10500 Square Feet
Owner:
Address:
Phone:
Email:
WAKELEY, RUTH C
417 N CORBIN RD
GREENACRES, WA 99016-9386
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
DANSDDL935MO
DAN'S DEXCAVATING LLC
39710 MADISON
ELK, WA 99009
509-951-4816
DETAILS:
Class Type Quantity Unit Charge Value
SEWER
SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 09/11/2012 09:22:13
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002177 09/11/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 09/11/2012 09:22:13
Printed by: IIS APPPOOL\ASP.NET v4.0