Loading...
18-127.01 HDR Engineering: Barker/I-90 North Interchange MIL Washington State Department of Transportation S plemental Agreement Organization and Address Nu ber 01 HDR Engineering,Inc. Origi al Agreement Number 835 North Post Street,Suite 101 Spokane,WA 98201 18 27.01 Phone: 509.343.8500 1 Project Number Execution Date Completion Date January 28,2019 December 31,2019 Projebt Title New Maximum Amount Payable Barter Road/1-90 North Interchange(CIP#0273) $373,012.27 Description of Work To improve safety and mobility by constructing a single-lane roundabout(RAB)at the existing intersection of Barker Road,the combined westbound I-90 on/off ramp terminal and Cataldo Avenue. Modifications to the existing on and off ramps will be limited to connecting to the new RAB. The intersection of Boone Avenue/Barker Road will be modified as well. Work will include supplemental survey,geotechnical investigation,final design,&Plans,Specifications&Estimate to begin in 2019 and to be completed in 2020. � ff The Local Agency of City of Spokane Valley desires to supplement the agreement entered in to with HDR Engineering, Inc. and executed on January 28,2019 and identified as Agreement No. 18-127 All pripvisions in the basic agreement remain in effect except as expressly modified by this supplement. The 4hanges to the agreement are described as follows: Secti n 1, SCOPE OF WORK, is hereby changed to read: • No Change Il 1 II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: December 31,2020 Ill Section V, PAYMENT, shall be amended as follows: No Change as sel forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action.By: 1Yt3L fl • aatEP By: Ark ( iiwt 4.64) c„„ekoi, Weapon igna ure Approving Authority Signature (2020 Date DOT Fin 140-063 R 'sed 09/2005